Facilitate sprint planning by organizing backlog items, estimating effort, balancing capacity, identifying dependencies, and producing a sprint commitment summary. Use when teams need structured sprint planning output. Do not use for strategic roadmap planning, annual budgeting, or product vision work.

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(5)

  • SKILL.md3.5 KB
  • agents/openai.yaml170 B
  • examples/common-mistakes.md810 B
  • examples/good-output.md794 B
  • verification/checklist.md1.3 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Sprint Planning Assistant

Purpose

Turn a groomed backlog into a well-scoped sprint plan with clear commitments, dependencies, and capacity fit.

When to use

  • preparing for a sprint planning meeting
  • organizing and estimating a batch of backlog items
  • checking if proposed sprint scope fits team capacity
  • documenting sprint goals and commitments for stakeholders

When not to use

  • strategic product planning or roadmapping
  • items are not groomed (requirements unclear, no acceptance criteria)
  • portfolio-level work intake or project governance

Inputs

  • backlog items (titles, descriptions, acceptance criteria)
  • team capacity (available person-days, holidays, known absences)
  • sprint duration (typically 1 or 2 weeks)
  • velocity reference (last 3 sprints if available)
  • known dependencies or blockers
  • sprint goal or theme from product owner

Procedure

  1. Review backlog items and confirm each has clear acceptance criteria.
  2. Flag items that are too large for one sprint and recommend splitting.
  3. Estimate effort using story points or T-shirt sizing.
  4. Map total estimated effort against team capacity and historical velocity.
  5. Identify cross-team or technical dependencies.
  6. Recommend a sprint commitment — items that fit capacity with 20% buffer.
  7. Write the sprint goal as one sentence.
  8. Produce a sprint summary table for stakeholders.

Output

  • sprint goal statement
  • committed items table (item, estimate, owner, dependency)
  • stretch items (if capacity allows)
  • flagged risks or blockers
  • capacity utilization summary

Definition of done

  • total committed effort is ≤ 80% of team capacity
  • every committed item has an owner
  • dependencies are explicitly called out
  • sprint goal is one clear sentence tied to business value

Examples

  • "Plan Sprint 12 with these 15 backlog items for a 5-person team over 2 weeks."
  • "Check if we can fit the payment feature plus 3 bug fixes into next sprint."
  • "Write a sprint summary for stakeholders — what we're committing to and why."

Quality Criteria

  • Steps are executable in sequence without external context
  • Decision points have clear if/then branching
  • Rollback or abort procedures are documented for risky steps
  • Expected duration or time-per-step is estimated

Verification (4C)

CheckQuestion
CorrectnessDo the steps execute correctly in the order specified?
CompletenessAre decision points, error handling, and escalation paths all documented?
Context-fitCould someone with the right access but no prior context complete this runbook?
ConsequenceIf Step N fails and the operator skips to Step N+1, what breaks?

Edge Cases

  • Steps require access the operator doesn't have — Document exact access requirements upfront. Include escalation contact for emergency access.
  • Environment differs from documented state — Add a pre-flight check as Step 0 to verify prerequisites before starting.
  • Runbook is triggered during off-hours — Document who to contact and which steps can be safely deferred to business hours.

Changelog

  • v1.0.0 — Initial release

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Design rigorous A/B test plans with hypothesis, sample size calculation, Minimum Detectable Effect (MDE), randomization strategy, and decision rules. Includes guardrail metrics and rollout playbook. Use when planning product experiments, conversion optimization, or data-driven feature decisions.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Review REST and GraphQL API designs for consistency, usability, and best practices. Covers naming conventions, versioning strategy, error format, pagination, authentication patterns, and breaking change detection. Use when reviewing API specs, designing new APIs, or auditing existing endpoints.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Write Architecture Decision Records (ADRs) following the Michael Nygard format. Captures context, options considered, decision rationale, and consequences. Use when making technology choices, framework selections, or any architectural decision that future developers need to understand.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Assess organizational readiness for financial audits (internal or external). Map assertions to account balances, check evidence completeness, score readiness using a Red/Amber/Green framework, and generate a remediation timeline. Aligned with SOX, IFRS, and GAAP audit standards. Use before scheduled audits or when preparing for first-time compliance.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Design safe recurring Codex automations with clear prompts, outputs, schedules, and gating rules.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

Refine Product Backlog Items to meet INVEST criteria. Write User Stories with Acceptance Criteria in Given/When/Then format, estimate with Story Points, and flag dependencies. Use before sprint planning when backlog items need grooming. Do not use to prioritize the backlog — that is the Product Owner's decision.

中文简介正在准备中。当前显示原文说明。

hoavdc/CodexKit252026年10月11日 更新

查看 hoavdc 的全部技能

报告此技能的问题