AID Phase 4 - Development phase. Use for implementing features, TDD practices, code reviews, transitioning from planning to QA.
中文简介正在准备中。当前显示原文说明。
AID Phase 3 - Implementation Planning with consolidation-first approach. Resolves contradictions between PRD and Tech Spec, creates consolidated master document, then breaks down into actionable tasks and populates Jira. Includes sprint planning and risk assessment.
中文简介正在准备中。当前显示原文说明。
安装前可以查看交给 AI 代理的指令内容。
Applies to AID Phase 3 only. Run sub-phases in order: 3a Consolidation → 3b Breakdown → 3c Criteria Gen → 3d Jira Population.
Templates:
references/templates/epic-template.mdreferences/templates/story-template.mdreferences/templates/task-template.mdreferences/templates/contradiction-log-template.mdMethodology:
references/phase3-methodology.mdreferences/content-mapping.mdreferences/criteria-generator.mdreferences/iron-rules.mdKey Principle: PRD Content → Epics & Stories (WHY/WHAT), Tech Spec Content → Tasks (HOW)
Every word from source documents MUST appear in Jira:
Verification: Create traceability matrices. 100% coverage required before Phase 4.
| Source Size | Task Size |
|---|---|
| < 20 pages | M (4-8 hours) |
| 20-50 pages | S (2-4 hours) |
| 50-100 pages | XS-S (1-4 hours) |
| > 100 pages | XS (1-2 hours) |
Wrong: Read all → Think → Write at end (loses info) Right: Read section → Write to enriched file → Next section (progressive capture)
Before Phase 4:
Purpose: Find and resolve ALL contradictions between PRD, Tech Spec, and Research BEFORE consolidating.
Process:
Contradiction Types:
| Type | Priority |
|---|---|
| Scope conflicts | 1 (Critical) |
| Technical conflicts | 1 (Critical) |
| Requirement gaps | 2 (High) |
| Implementation conflicts | 2 (High) |
| Minor inconsistencies | 3 (Low) |
Resolution Template:
## Contradiction #[N]
**Found In:** [PRD section] vs [Tech Spec section]
**Description:** [What conflicts]
**Resolution:** [How resolved]
**Authority Used:** [Research/PRD/Tech Spec]
**Rationale:** [Why]
Phase 3a Checkpoint: User approval required before proceeding to 3b.
Purpose: Transform consolidated spec into actionable development tasks.
Component Categories:
Task Decomposition Rules:
| Rule | Requirement |
|---|---|
| Size | < 4 hours (prefer 1-2) |
| Independence | Completable alone (unless dependency) |
| Testability | Clear acceptance criteria |
| Traceability | Links to spec section |
Estimation:
| Type | Unit | Range |
|---|---|---|
| Epic | Sprints | 1-3 |
| Story | Story Points | 1,2,3,5,8,13 |
| Task | Hours | 1-8 |
| Subtask | Minutes/Hours | 15min-4hr |
Risk Template:
### Risk: [Name]
- **Category:** [Technical/Dependency/Resource/Timeline/Scope]
- **Probability:** [High/Medium/Low]
- **Impact:** [High/Medium/Low]
- **Mitigation:** [Strategy]
- **Contingency:** [Backup plan]
Purpose: Generate testable acceptance criteria for QA sub-agent validation.
Information Boundaries:
| Level | Contains | Source | Forbidden |
|---|---|---|---|
| Epic | Business Logic (WHY) | Research+PRD | Tech HOW |
| Story | Product Logic (WHAT) | PRD | Tech HOW |
| Task | Technical Approach (HOW) | Tech Spec | Business WHY |
| Sub-task (QA) | Acceptance Criteria (VERIFY) | Story AC | Tech HOW |
Output: .aid/qa/{task-id}.yaml
schema_version: "1.0"
task_id: "{TASK-ID}"
business_context:
epic_goal: "{sanitized}"
user_value: "{sanitized}"
acceptance_criteria: []
criteria:
must_achieve: []
must_not: []
not_included: []
best_practices: []
files_to_review: []
review_history: []
Phase 3c Checkpoint: Human approval required before Jira population.
Step 1: Create Structure
Step 2: Enhance with Full Details — for each issue, add:
Enhancement Template:
## Summary
[What this accomplishes]
## Business Context
[From PRD]
## Technical Implementation
[From Tech Spec]
## Acceptance Criteria
- [ ] [Criterion 1]
- [ ] [Criterion 2]
## Dependencies
- Blocks: [keys]
- Blocked By: [keys]
## Reference
📄 Consolidated Spec: [path]
📑 Section: [name]
Alternative Export: CSV/JSON for non-Jira users.
docs/implementation-plan/enriched-jiras/ before pushing to Jira| Artifact | Location |
|---|---|
| Consolidated Spec | docs/implementation-plan/consolidated-spec-YYYY-MM-DD-[feature].md |
| Contradiction Log | docs/implementation-plan/contradiction-log-YYYY-MM-DD.md |
| Task Breakdown | docs/implementation-plan/task-breakdown-YYYY-MM-DD-[feature].md |
| Jira Export | docs/implementation-plan/jira-export-YYYY-MM-DD.json |
| Risk Assessment | docs/implementation-plan/risks-YYYY-MM-DD.md |
| Sprint Plan | docs/implementation-plan/sprint-plan-YYYY-MM-DD.yaml |
| Command | Purpose |
|---|---|
| /impl-plan | Start Phase 3 |
| /consolidate | Run Phase 3a |
| /breakdown | Run Phase 3b |
| /populate-jira | Run Phase 3d |
.aid/state.json:
{
"current_phase": 3,
"sub_phase": "3b",
"phase_3_state": {
"3a": {"status": "complete", "user_approved": true},
"3b": {"status": "in_progress"},
"3c": {"status": "locked"},
"3d": {"status": "locked"}
}
}
还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
AID Phase 4 - Development phase. Use for implementing features, TDD practices, code reviews, transitioning from planning to QA.
中文简介正在准备中。当前显示原文说明。
AID Phase 0 - Research & discovery. Use for validating problem spaces, identifying stakeholders, defining success metrics, deciding whether to proceed.
中文简介正在准备中。当前显示原文说明。
AID Phase 1 - PRD creation. Use for user stories, acceptance criteria, scoping features, transitioning from discovery to tech spec.
中文简介正在准备中。当前显示原文说明。
AID Phase 5 - QA and Release. Use for validating implementations, acceptance tests, preparing releases, deployment, operational readiness.
中文简介正在准备中。当前显示原文说明。
AID Phase 2 - Technical Specification. Use for system architecture, API contracts, data models, security architecture, transitioning from PRD to implementation.
中文简介正在准备中。当前显示原文说明。
Build an Atomic Design system from Figma style guides - extract tokens, create atoms/molecules/organisms/templates/pages as reusable component libraries. Use when building or extending a design system or component library.
中文简介正在准备中。当前显示原文说明。