跳到正文
cccskills
免费在 GitHub 公开

goals

View and manage company OKRs and key results.

中文简介正在准备中。当前显示原文说明。

indigoai-us/hq-core星标 90(GitHub 90 + cccskills 0)

实测评分 未实测

查看安装方法

包含的文件(2)

  • SKILL.md6.1 KB
  • agents/openai.yaml109 B

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

/goals - OKR Management

View and manage objectives + key results on company boards (board.json v2).

Input: $ARGUMENTS

Step 1: Parse Input

Extract from $ARGUMENTS:

  • --company <slug> or -c <slug> — explicit company override
  • Subcommand (first non-flag word): add-objective, add-kr, update-kr, set-status, link-linear, link-project
  • Subcommand args (remaining positional args after subcommand)

If no subcommand → view mode (Step 3).

Step 2: Resolve Company

Priority order:

  1. --company / -c flag → use exact slug
  2. cwd inside companies/{slug}/ → infer from path
  3. cwd inside repos/{pub|priv}/{name} → look up owning company in companies/manifest.yaml
  4. Default to asking user

Read companies/manifest.yaml. Validate company slug exists. Read companies/{co}/board.json. If schema_version is missing or < 2, warn: "Board needs migration. Run npx tsx core/scripts/migrate-board-v2.ts first."

Step 3: View Mode (no subcommand)

Read board.json. Compute metrics:

  • Per KR with source: "derived": recompute current from linked project statuses (count projects with status in ["done", "completed"])
  • Per objective: compute overall progress = avg of (KR current/target) across its KRs, or 0% if no KRs

Display OKR tree:

OBJECTIVES — {company} [{date}]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

[{status-emoji}] {objective title}  ({timeframe})
  Owner: {owner || "unassigned"}
  {if linear_initiative_id: "Linear: {uuid-short}"}

  KR 1: {kr title}
    {progress-bar}  {pct}%  ({current}/{target} {unit})
    Projects: {proj-id} {status-icon}  {proj-id} {status-icon} ...

  KR 2: ...

---

[{status-emoji}] {next objective} ...

━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Unlinked projects: {count}
Total: {obj-count} objectives, {kr-count} KRs, {proj-count} projects

Status emoji mapping:

  • on_track → ● (green context via text)
  • at_risk → ◐
  • off_track → ○
  • completed → ✓
  • paused → ⏸

Progress bar: Unicode blocks: ████████░░ (10-char bar based on current/target ratio)

Step 4: add-objective

Ask via AskUserQuestion (batch into 1 call):

  1. Title — 1-line strategic goal
  2. Description — optional longer context
  3. Timeframe — e.g. "2026-H1", "2026-Q2", "2026", "ongoing"
  4. Owner — free text (person name/slug) or null

After user answers:

  1. Read board.json
  2. Show existing objectives + existing initiatives. Ask: "Link to existing initiatives?" (multi-select from initiatives list, or "None")
  3. If company has linear in manifest services: ask "Link to Linear initiative UUID?" (text input or skip)
  4. Generate ID: {prefix}-obj-{max+1} (3-digit zero-padded, same prefix convention as existing objectives)
  5. Build objective entry with empty key_results: []
  6. Append to objectives[], update updated_at, write board.json

Print confirmation with the new objective ID.

Step 5: add-kr {obj-id}

Validate {obj-id} exists in objectives[].

Ask via AskUserQuestion (1 call):

  1. Title — measurable outcome statement
  2. Metric — machine-readable slug (e.g. "active_users", "revenue_mrr", "features_shipped")
  3. Target — numeric target value
  4. Current — numeric current value (default 0)
  5. Unit — display unit ("users", "%", "$k", "features", etc.)
  6. Direction — "up" (higher=better) or "down" (lower=better)
  7. Source — "manual" (you update it) or "derived" (computed from linked project completion)

After user answers:

  1. Generate KR ID: {obj-id}-kr-{N} where N = existing KR count + 1
  2. Set status based on current/target ratio: >=70% → on_track, 40-70% → at_risk, <40% → off_track
  3. Set project_ids: [] (link projects separately)
  4. Append to objective's key_results[], update updated_at, write board.json

If user wants to link projects now, ask: "Link projects to this KR?" Show project list from board, allow multi-select.

Step 6: update-kr {kr-id} {value}

Parse {kr-id} — format is {obj-id}-kr-{N}. Find the objective containing this KR. Update current to {value} (parse as number). Recompute status: current/target ratio → on_track/at_risk/off_track/completed. If current >= target and direction is "up", set status to "completed". Update updated_at on both KR parent objective and board root. Write board.json.

Print: Updated {kr-id}: {current}/{target} {unit} ({status})

Step 7: set-status {obj-id} {status}

Validate status is one of: on_track, at_risk, off_track, completed, paused. Find objective, update its status field. Update updated_at, write board.json.

Print: {obj-id} status → {status}

Step 8: link-linear {obj-id} {uuid}

Find objective, set linear_initiative_id to {uuid}. Update updated_at, write board.json.

If company has linear in manifest services, note: "Cross-referenced with Linear initiative {uuid}." If company does NOT have linear in services, warn: "Note: {company} has no Linear integration in manifest."

Step 9: link-project {kr-id} {proj-id}

Parse {kr-id} to find objective + KR. Validate {proj-id} exists in projects[]. Add {proj-id} to KR's project_ids[] (skip if already present). Also set objective_id on the project entry if not already set (use the KR's parent objective ID). If KR source is "derived", recompute current from linked project statuses. Update updated_at, write board.json.

Print: Linked {proj-id} to {kr-id} ({project-title})

Rules

  • 1 AskUserQuestion max per subcommand — batch all questions
  • board.json is the only file written
  • Follow existing ID conventions — prefix from existing entries, zero-padded 3-digit numbers
  • Never block on errors — if board.json is v1 or malformed, warn and exit gracefully
  • Reindex after writes: qmd update 2>/dev/null || true

See also

  • /signals — commitments and decisions feeding goals
  • /strategize — turn goals into a plan

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

accept

免费

Accept HQ membership invites from a magic link or raw token.

中文简介正在准备中。当前显示原文说明。

indigoai-us/hq-core902026年10月26日 更新

adr

免费

Capture qualifying architecture decisions as ADRs in the right HQ or repo location.

中文简介正在准备中。当前显示原文说明。

indigoai-us/hq-core902026年10月26日 更新

Browser automation CLI for AI agents. Use when the user needs to interact with websites, including navigating pages, filling forms, clicking buttons, taking screenshots, extracting data, testing web apps, or automating any browser task. Triggers include requests to "open a website", "fill out a form", "click a button", "take a screenshot", "scrape data from a page", "test this web app", "login to a site", "automate browser actions", or any task requiring programmatic web interaction.

中文简介正在准备中。当前显示原文说明。

indigoai-us/hq-core902026年10月26日 更新

architect

免费

Find shallow modules and propose deepening refactors, ranked with file refs; never edits code. Use when code is hard to change or planning a refactor.

中文简介正在准备中。当前显示原文说明。

indigoai-us/hq-core902026年10月26日 更新

Generate dark ASCII banner graphics for HQ and social launch assets.

中文简介正在准备中。当前显示原文说明。

indigoai-us/hq-core902026年10月26日 更新

Compare approaches to best-in-class prior art, merge existing work, verify cruft removal, and recommend the most durable design before PRD work.

中文简介正在准备中。当前显示原文说明。

indigoai-us/hq-core902026年10月26日 更新

查看 indigoai-us 的全部技能

报告此技能的问题