add-bead
免费Capture free-text work as a tracked Beads issue. Use when the user runs /add-bead or wants to quickly file a Beads issue.
中文简介正在准备中。当前显示原文说明。
Phase 4 of the Forge pipeline. Summarize the whole workload — what was built, which Beads issues closed, a before/after, and a step-by-step walkthrough the user can run to verify it themselves — then run quality gates, push, and open the PR. Use when starting /forge-ship or the ship step of /forgemaster.
中文简介正在准备中。当前显示原文说明。
查看安装方法安装前可以查看交给 AI 代理的指令内容。
Phase 4 of 4 in the Forge pipeline (research → plan → implement → ship). It closes the loop: a
human-readable summary of the entire run plus the actual push/PR. Output is reports/<slug>-ship.md
and a pushed branch with a PR.
This phase complements the existing [[ship]] command — it adds the narrative summary and test walkthrough on top of the quality-gate/commit/push mechanics.
/forge-ship <slug> or /forgemaster enters its ship phase.bun run forge:phase-gate ship --slug <slug> # verifies implement is complete in forge state
cat plans/research/<slug>.md # original goal
cat plans/drafts/<slug>.md # plan + checkpoints + Beads map
Beads must be reachable. If bd errors, stop and fix it (bd dolt start) before shipping.
--smith <name>: when the run was started with it, add --smith <name> to every
forge:phase-gate call in this skill. The phase gate refuses a name that is not configured and
records the smith on the run as its executor. It does not change the model of the session doing the
work (.claude/workflows/forge.md, --smith).
git log --oneline <base>..HEAD # commits this run produced
git diff --stat <base>..HEAD # files + churn
bd list --json # to confirm which planned tasks are closed
Cross-reference against the plan's Beads Issue Map so every planned task is accounted for (closed, or explicitly deferred with a reason).
Describe the observable change, not the diff. For each checkpoint: what the user could NOT do before, and what they can do now. Capture commands/URLs and expected output.
Write to reports/<slug>-ship.md (create reports/ if needed):
# Ship Report: <slug> — <feature title>
Shipped: <date>
Epic/Feature: <beads id> · Branch: <branch> · PR: <url once created>
## What Shipped
<2–4 sentences: the capability delivered, in plain language>
## Before → After
| Area | Before | After |
|------|--------|-------|
| <capability> | <old behavior / "did not exist"> | <new behavior> |
## Work Done
- Checkpoint A — <summary> (<commit shas>)
- Checkpoint B — <summary> (<commit shas>)
## Beads Completed
| Beads ID | Title | Status |
|----------|-------|--------|
| <id> | <title> | closed |
## Test It Yourself (walkthrough)
1. <setup step, e.g. `bun install` / `bun run dev`>
2. <action — exact command or UI steps>
- Expect: <observable result>
3. Automated: `bun test <paths>` — expect all green.
## Follow-ups / Known Gaps
- <deferred Beads id + reason, or "none">
Gate the run through its correlation before anything is pushed. One command runs typecheck, lint and the tests, checks that the tree is clean and that a test file is among the branch's own commits, and logs the result against this run and the issue it names (reuse [[ship]] for the rest of the mechanics):
git status --porcelain # must be empty: commit what belongs to the run
bun run quality-gate --correlation <pointer> # must exit 0
git pull --rebase origin <base>
git push origin <branch>
<pointer> is what every phase-gate write of this run that named a bead printed as
data.correlation.pointer. It is one path for the whole run,
.tmp/work/run-correlations/<slug>.json, relative to the checkout the run builds in. Run the gate
in that checkout.bun run forge:correlate --bead <id> --run <slug>.test-evidence reads
every commit of the branch's own, the ones since origin/HEAD, however far back the tests are,
and fails when none of them holds a test file. A branch whose commits change documentation only
(.md, .mdx, .markdown, .txt, .rst, .adoc), or that has no commits of its own, has
nothing to test: the check is skipped and its entry says so. With no origin/HEAD the gate reads
the last five commits instead and says so (git remote set-head origin --auto sets it).AGENT_FORGE_EVAL_VERDICT=strict) is opt-in. When it is on, file the run's
verdict with this pointer before the gate (.claude/commands/ship.md).A run whose work is in another repository (repos/<repo>, or a worktree of one recorded with
--checkout) is gated the same way, from this checkout, with that repository's own checks. Its
correlation is in the run's checkout: join the checkout and the pointer the phase gate printed.
bun run quality-gate --correlation <checkout>/<pointer> # from this checkout; must exit 0
checks list on the repository's entry in repos/repos.json
([[add-repo]] says how to write one), each in the run's checkout and without a shell. Then it runs
clean-tree and test-evidence there. The entry is linked to the run and its issue, and logged as
that checkout's.checks list is refused, and the refusal names the entry to fill in. So is
one that tracks files under .tmp/work/run-correlations or .tmp/work/evaluations.forge:verdict filed it.The PR body MUST follow the canonical template — see [[pr-description]]. The ship report you just wrote is the source material: map its sections into the template (What Shipped → What Changed, the goal from research → Why It's Needed, the Test It Yourself walkthrough → How It Was Tested, real gate output → Test Evidence) and fill Risk & Rollback + Linked Issues & AC Trace.
mkdir -p .tmp/work
cp .claude/skills/pr-description/references/pr-template.md .tmp/work/pr-body.md
# Fill every section from reports/<slug>-ship.md + the plan's Beads map, then validate:
bun run .claude/skills/pr-description/scripts/check-pr-body.ts .tmp/work/pr-body.md # must be "ok": true
gh pr create --title "<feature title>" --base <base> --body "$(cat .tmp/work/pr-body.md)"
Keep reports/<slug>-ship.md as the durable in-repo record; the PR body is the template-conformant
view of the same run.
<close-id> is the issue this run closes: the feature or the epic. A run that closes neither keeps
the id its implement write named. This is the one write that may name a feature or an epic
(.claude/workflows/forge.md, Which bead a phase names).
When <close-id> is a feature or an epic, add its testing attestation first. A gate that runs
linked to that issue requires it, and after the write below the run's pointer names that issue:
bd comments add <close-id> "worklog: testing-attestation automation=<yes|no> unit=<yes|no> notes=<short context>"
bd close <close-id> # skip when the implement phase already closed it (a run that closes no feature or epic)
bd comments add <close-id> "worklog: shipped — PR #<n>; report reports/<slug>-ship.md"
# The tracker is local-only: do not run `bd dolt push`.
bun run forge:phase-gate ship --slug <slug> --write --bead <close-id> # records the run complete
After ship completes, the forge run is finished — the Stop hook goes quiet and the state file can be archived or removed.
🚀 Shipped: <slug>
Report: reports/<slug>-ship.md
PR: <url>
Beads closed: <ids>
Try it: <the single most representative command from the walkthrough>
reports/<slug>-ship.md exists with before/after, Beads table, and a runnable walkthrough.check-pr-body.ts reports ok: true).ship complete.还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
Capture free-text work as a tracked Beads issue. Use when the user runs /add-bead or wants to quickly file a Beads issue.
中文简介正在准备中。当前显示原文说明。
Register a new sub-repo in the knowledge base.
中文简介正在准备中。当前显示原文说明。
Add focused Bun unit tests for mission-critical behavior and edge cases — not blanket coverage.
中文简介正在准备中。当前显示原文说明。
Answer questions about the codebase from knowledge files. Use when the user runs /ask or asks a domain/knowledge question about the repos.
中文简介正在准备中。当前显示原文说明。
Meta-skill for creating Agent Forge skills under .claude/skills/ with SKILL.md, optional references/ and scripts/, and Bun scaffolds. Use when the user wants to add or author a skill, scaffold a new skill folder, or align skill docs with harness conventions (JSON script output, Beads for tasks).
中文简介正在准备中。当前显示原文说明。
Choose Beads issue priority (P0–P4, numeric, or named) from urgency, impact, and risk when creating or triaging work.
中文简介正在准备中。当前显示原文说明。