跳到正文
cccskills
免费在 GitHub 公开

risk-register

Maintain a centralized living risk register across projects. Use this skill when: - You need to create or update a risk register for a project or feature - You want to consolidate risks from individual specs into one register - You need to review and update risk status, mitigations, and owners - You want a cross-project risk view

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(1)

  • SKILL.md2.7 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Risk Register

Centralized risk register that consolidates risks from individual spec sections into one living document.

Workflow

  1. Determine scope — Single spec, single project, or cross-project
  2. Read Risks and Assumptions from relevant specs
  3. If existing register exists, read and merge (don't duplicate — match by description)
  4. Assess each risk using the likelihood x impact matrix
  5. Output register

Risk Assessment Matrix

Likelihood: Low (unlikely) | Medium (possible) | High (probable) Impact: Low (minor inconvenience) | Medium (feature degradation) | High (critical failure/data loss)

Low ImpactMedium ImpactHigh Impact
High LikelihoodMediumHighCritical
Medium LikelihoodLowMediumHigh
Low LikelihoodLowLowMedium

Output Format

# Risk Register — {Scope}

**Last Updated:** {DD-MM-YYYY}
**Total Risks:** {n} | Open: {n} | Mitigated: {n} | Closed: {n}

## Risk Summary

| ID | Risk | Source | Likelihood | Impact | Priority | Owner | Mitigation | Status | Last Reviewed |
|----|------|--------|-----------|--------|----------|-------|-----------|--------|--------------|
| R-001 | {desc} | {spec/feature} | H/M/L | H/M/L | Critical/High/Med/Low | {name/role} | {plan} | Open/Mitigated/Closed | {date} |

## Critical Risks
{Filtered view of Critical priority — requires immediate attention}

## Risk Trends
- New risks this period: {n}
- Risks closed this period: {n}
- Overdue reviews: {risks not reviewed in 30+ days}

Rules

  • Every risk MUST have an owner (name or role, not "TBD")
  • Every risk MUST have a mitigation plan (not empty)
  • Review date updates when risk is revisited
  • Risk IDs are sequential (R-001, R-002) and never reused
  • When merging with existing register, preserve existing IDs
  • Separate risks from assumptions — only risks go in the register

Anti-Patterns

  • Don't create a risk without a mitigation plan — "TBD" is not acceptable
  • Don't reuse risk IDs — closed risks keep their IDs
  • Don't mix risks and assumptions — they're different things

Quality Checklist

  • Every risk has an owner
  • Every risk has a mitigation plan
  • Likelihood x Impact matrix applied
  • Critical risks highlighted
  • Risk IDs are sequential and unique

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Rate any product, feature, or experience on the 11-star scale (Brian Chesky's Airbnb thought experiment). Use when user says "rate this experience", "11-star", "star rating", "experience audit", "how good is this", "experience rating", "product audit", "quality assessment", or wants to evaluate product quality and identify improvement paths. Also trigger when user wants to benchmark a feature, assess where a product stands, or map out what "great" looks like - even if they don't explicitly say "11-star".

中文简介正在准备中。当前显示原文说明。

qa-aman/claude-skills212026年10月19日 更新

Generate A/B copy variants grounded in Eugene Schwartz's awareness and market-sophistication stages and John Caples' tested-headline discipline. Every variant declares its angle, the awareness stage it targets, and a falsifiable hypothesis, and the skill recommends which pair to test first and what delta counts as signal. Use when the user says "A/B test this", "write variants", "give me options", "test different angles", "copy variants", "ab copy", "test this headline", "multiple versions", "which version is better", or wants to test copy before publishing. For reviewing copy that already exists, see copy-review. For sample size and stopping rules, see growth-experiment. For diagnosing a page rather than its words, see page-cro. For full paid ad sets by platform, see ad-campaign-writer.

中文简介正在准备中。当前显示原文说明。

qa-aman/claude-skills212026年10月19日 更新

Design statistically rigorous experiments to test data science hypotheses. Use when the user says "design an A/B test", "run an experiment", "test this hypothesis", "is this difference significant", "how many samples do I need", "randomized controlled trial", "causal inference", "uplift test", "holdout group", "significance test", "power calculation", "avoid p-hacking", or needs to determine whether an observed effect is real before making a product or model decision. For lean build-measure-learn product experiments without the statistics, use experiment-design instead.

中文简介正在准备中。当前显示原文说明。

qa-aman/claude-skills212026年10月19日 更新

Write measurable acceptance criteria for requirements or user stories. Use when the user says "write acceptance criteria", "definition of done", "how do we test this", "fit criteria", "given when then", "Gherkin scenarios", "what does done look like", "testable conditions", "how will we know this works" - even if they don't explicitly say "acceptance criteria".

中文简介正在准备中。当前显示原文说明。

qa-aman/claude-skills212026年10月19日 更新

Build a strategic account plan for winning, retaining, or expanding a named account. Use when the user says "build an account plan", "strategic account planning", "how do I grow this account", "account expansion strategy", "whitespace analysis", "QBR prep", "key account review", "map the stakeholders in this account", "land and expand plan", "how do I break into [company]", or wants a structured strategy for a specific account.

中文简介正在准备中。当前显示原文说明。

qa-aman/claude-skills212026年10月19日 更新

Write paid ad copy for LinkedIn, Google, Meta, and YouTube. Produces multiple variants per platform, each targeting a different Eugene Schwartz awareness level and Cialdini persuasion principle. Use when the user asks for ad copy, ad variants, "write LinkedIn ads", Google ads, Meta ads, paid social copy, ad headlines, or wants creative for a paid campaign. Reads brand voice, ICP, and positioning from knowledge/. For organic social posts, see linkedin-post or social-calendar. For the landing page the ad points at, see landing-page-writer. For testing variants, see ab-copy-writer.

中文简介正在准备中。当前显示原文说明。

qa-aman/claude-skills212026年10月19日 更新

查看 qa-aman 的全部技能

报告此技能的问题