Use when the user needs a standup-ready summary of recent project activity from local evidence.
中文简介正在准备中。当前显示原文说明。
Use when an engineering plan needs pressure-testing for architecture, complexity, data, risk, and operability.
中文简介正在准备中。当前显示原文说明。
查看安装方法安装前可以查看交给 AI 代理的指令内容。
Lifecycle stage: CHALLENGE
Use before committing to implementation approach.
Do not use when this trigger is absent; choose the command or skill that owns the requested state, artifact, and verification gate.
| Shortcut | Rebuttal |
|---|---|
| "This is obvious." | Write the assumption and evidence. If you cannot, it is not obvious. |
| "We can do this later." | If the missing step changes the decision, do it now or state the risk. |
| "The user wants speed." | Reduce scope; do not skip the quality bar. |
| "This does not need verification." | Every important claim or behavior needs proof. |
Engineering Grill Report
Use templates/grill-report.md for a concise, auditable artifact with evidence, blockers, and next action so another agent can resume.
Trigger: an engineering plan needs pressure-testing before implementation. Action: compare scripts, checklists, human review, and agent workflows; require file scope, rollback, and validation proof. Output artifact: templates/grill-report.md with blockers and next action. Verification: cite architecture risks, data risks, operability checks, and smallest safe path.
A request says, "Add recurring workspace cleanup." The skill should compare a scheduled script, manual checklist, and agent-run cleanup; require file-scope, dry-run, rollback, and validation proof; then produce an engineering grill report that recommends the smallest safe implementation path instead of jumping straight to code.
还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
Use when the user needs a standup-ready summary of recent project activity from local evidence.
中文简介正在准备中。当前显示原文说明。
Use when a command, adapter, or runtime smoke depends on proving an agent runtime's capabilities before trusting command routing, writes, shell access, or validation claims.
中文简介正在准备中。当前显示原文说明。
Use when agent-produced work needs a safety, evidence, and reliability check before handoff, merge, or trust.
中文简介正在准备中。当前显示原文说明。
Use when an output artifact, template, schema, example, or handoff field must stay aligned across commands, skills, docs, and validators.
中文简介正在准备中。当前显示原文说明。
Agent Brain /brain-brief: after intake, research, and grill have enough signal.
中文简介正在准备中。当前显示原文说明。
Agent Brain /brain-build: an implementation plan has a selected task and validation method.
中文简介正在准备中。当前显示原文说明。