Track and update action item status from natural language updates like 'Seanのメールには返信しておいた' or 'Lu対応予定'. Integrates with daily-comms-ops workflow. Use when managing action items across communication channels.
中文简介正在准备中。当前显示原文说明。
Comprehensive Lean Six Sigma consulting skill supporting all belt levels (White Belt to Master Black Belt). Use this skill for DMAIC/DMADV project execution, Lean waste elimination (VSM, 8 Wastes/DOWNTIME, 5S), statistical analysis (process capability Cp/Cpk, control charts, hypothesis testing), and Six Sigma training/education. Triggers include "improve process", "reduce defects", "sigma level", "DMAIC project", "value stream mapping", "Kaizen", "process capability", "control chart", "root cause analysis", "5 Whys", "Fishbone diagram", "FMEA", "DOE", or requests involving process improvement methodologies.
中文简介正在准备中。当前显示原文说明。
实测评分 未实测
查看安装方法安装前可以查看交给 AI 代理的指令内容。
This skill provides comprehensive Lean Six Sigma consulting capabilities, integrating the waste elimination focus of Lean with the variation reduction rigor of Six Sigma. It supports practitioners at all belt levels from awareness (White Belt) through strategic deployment (Master Black Belt).
Primary Language: Japanese (default), English supported Knowledge Base: 33 reference files covering methodology, tools, statistics, industries, and training Output Format: Project guidance, analysis reports, templates, training materials
Six Sigma focuses on reducing process variation and defects using statistical methods (DMAIC methodology). The goal is achieving 3.4 defects per million opportunities (6 sigma level).
Lean focuses on eliminating waste and improving flow using Toyota Production System principles. The goal is maximizing customer value while minimizing waste.
Lean Six Sigma combines both:
Use this skill when:
Project Execution:
Analysis Support:
Training/Education:
Before using this skill, ensure the following dependencies are installed:
# Required Python packages for statistical analysis scripts
pip install numpy scipy
Scripts require:
numpy for numerical calculationsscipy for statistical functions (normal distribution, hypothesis testing)Optional dependencies:
This skill supports multiple workflows depending on the user's objective:
DMAIC Project Execution (Core Workflow 1)
DMADV/DFSS (Core Workflow 2)
Lean Waste Elimination (Core Workflow 3)
Statistical Analysis Support (Core Workflow 4)
Training/Education (Core Workflow 6)
Quick Start:
# Calculate sigma level from defect data
python scripts/sigma_calculator.py --defects 15 --units 1000 --opportunities 5
# Analyze process capability
python scripts/process_capability.py --demo
# Perform control chart analysis
python scripts/control_chart_analysis.py --demo
This skill produces the following outputs:
| Output Type | Format | Description |
|---|---|---|
| DMAIC Project Guidance | Markdown/Text | Step-by-step guidance through each DMAIC phase with tollgate checklists |
| Process Metrics Report | JSON/Text | Sigma level, DPMO, yield, capability indices (Cp, Cpk, Pp, Ppk) |
| Control Chart Analysis | JSON/Text | Control limits, out-of-control detection, Western Electric rule violations |
| Root Cause Analysis | Markdown | Fishbone diagrams, 5 Whys analysis, Pareto charts |
| Templates | Markdown | Project Charter, SIPOC, FMEA, Control Plan, A3 Report |
| Training Materials | Markdown | Belt-level curricula, certification preparation guides |
Example Output (Sigma Calculator):
================================================================
SIGMA LEVEL ANALYSIS REPORT
================================================================
📥 INPUT DATA:
Defects: 15
Units: 1000
Opportunities Per Unit: 5
Total Opportunities: 5000
Dpu: 0.015
📊 CALCULATED METRICS:
DPMO: 3,000.00
Sigma Level: 4.16σ
Yield: 99.7%
Defect Rate Percent: 0.3%
📈 INTERPRETATION:
Good (Industry Average)
3,000 defects per million opportunities
Target: 6σ = 3.4 DPMO
================================================================
DMAIC is the core improvement methodology for existing processes:
| Phase | Purpose | Key Questions | Key Deliverables |
|---|---|---|---|
| Define | Clarify the problem and project scope | What is the problem? Who is affected? What is the goal? | Project Charter, SIPOC, VOC/CTQ |
| Measure | Establish baseline and data collection | How is the process performing now? How do we measure it? | Data Collection Plan, Baseline Metrics, Process Map |
| Analyze | Identify root causes | Why is the problem occurring? What are the vital few causes? | Root Cause Analysis, Statistical Analysis |
| Improve | Develop and implement solutions | What solutions address root causes? How do we implement? | Solution Selection, Pilot Results, Implementation Plan |
| Control | Sustain the improvements | How do we maintain gains? How do we monitor? | Control Plan, Control Charts, Standard Work |
DMADV is used for designing new processes or products:
| Phase | Purpose | Key Deliverables |
|---|---|---|
| Define | Define project goals aligned with customer needs | Project Charter, Business Case |
| Measure | Measure customer needs and specifications | VOC, CTQ, Competitive Analysis |
| Analyze | Analyze design options | Concept Generation, Pugh Matrix |
| Design | Design the process/product in detail | Detailed Design, FMEA, Simulations |
| Verify | Verify design meets requirements | Pilot Testing, Validation, Handoff |
| Belt Level | Role | Time on Six Sigma | Key Competencies |
|---|---|---|---|
| White Belt | Awareness | Ad-hoc | Basic concepts, waste identification |
| Yellow Belt | Team member | 10-25% | Simple tools, data collection support |
| Green Belt | Project leader | 25-50% | DMAIC execution, basic statistics |
| Black Belt | Expert leader | 50-100% | Advanced statistics, complex projects |
| Master Black Belt | Strategic leader | 100% | Program deployment, training, mentoring |
Use this workflow when improving an existing process.
Objective: Clearly define the problem, scope, and goals.
Load assets/project_charter_template.md and complete:
Business Case: Why is this project important?
Problem Statement (Specific, factual, quantified):
Goal Statement (SMART):
Scope:
Team:
Load references/tools-by-phase/define/sipoc_guide.md and assets/sipoc_template.md.
SIPOC provides high-level process view:
Load references/tools-by-phase/define/voc_ctq_guide.md.
VOC Collection Methods:
CTQ (Critical to Quality) Tree:
Customer Need → Driver → CTQ (Measurable)
"Fast delivery" → "Delivery time" → "95% orders delivered within 2 days"
Before moving to Measure:
Objective: Establish baseline performance and data collection system.
Load references/tools-by-phase/measure/data_collection_plan.md.
Operational Definitions: Clear, unambiguous definitions
Data Types:
Sampling Strategy:
Load references/tools-by-phase/measure/msa_guide.md.
Before collecting data, validate the measurement system:
Acceptance Criteria:
Map the process in detail:
Load references/tools-by-phase/measure/baseline_metrics.md.
Primary Metric (Y): The main output measure
Sigma Level Calculation:
DPMO = (Defects / (Units × Opportunities)) × 1,000,000
Sigma Level = Look up in conversion table or calculate
| Sigma Level | DPMO | Yield |
|---|---|---|
| 2σ | 308,538 | 69.1% |
| 3σ | 66,807 | 93.3% |
| 4σ | 6,210 | 99.38% |
| 5σ | 233 | 99.977% |
| 6σ | 3.4 | 99.99966% |
Before moving to Analyze:
Objective: Identify and verify root causes.
Load references/tools-by-phase/analyze/root_cause_analysis.md.
Fishbone (Ishikawa) Diagram: Organize potential causes into 6 categories (6M):
5 Whys Analysis: Ask "Why?" repeatedly to drill down to root cause:
Problem: Machine stopped
Why 1: Overloaded → Why 2: Bearing failed → Why 3: Insufficient lubrication
→ Why 4: No PM schedule → Why 5: No maintenance program
Root Cause: Lack of preventive maintenance program
Load references/tools-by-phase/analyze/pareto_analysis.md.
Pareto Principle: 80% of effects come from 20% of causes
Steps:
Load references/tools-by-phase/analyze/statistical_analysis.md.
Statistical Tools by Situation:
| Situation | Tool |
|---|---|
| Compare two means | 2-sample t-test |
| Compare multiple means | ANOVA |
| Compare proportions | Chi-square test |
| Relationship between variables | Correlation, Regression |
| Identify significant factors | DOE (Design of Experiments) |
Hypothesis Testing Framework:
Before moving to Improve:
Objective: Develop, test, and implement solutions.
Load references/tools-by-phase/improve/solution_generation.md.
Brainstorming Guidelines:
Benchmarking: Learn from best practices elsewhere
TRIZ Principles: Structured inventive problem solving
Load references/tools-by-phase/improve/solution_selection.md.
Pugh Matrix (Concept Selection):
Decision Matrix (Weighted Scoring):
| Criteria | Weight | Option A | Option B | Option C |
|---|---|---|---|---|
| Cost | 30% | 8 | 6 | 9 |
| Effectiveness | 40% | 9 | 8 | 7 |
| Ease of Implementation | 30% | 7 | 9 | 6 |
| Weighted Score | 8.1 | 7.5 | 7.3 |
Load references/tools-by-phase/improve/fmea_guide.md and assets/fmea_template.md.
FMEA (Failure Mode and Effects Analysis): Proactively identify and mitigate risks in the solution.
| Failure Mode | Effect | Severity (1-10) | Cause | Occurrence (1-10) | Detection (1-10) | RPN | Action |
|---|
RPN = Severity × Occurrence × Detection
Prioritize actions for high RPN items (typically > 100).
Load references/tools-by-phase/improve/pilot_testing.md.
Pilot Plan:
Before-After Comparison:
Before moving to Control:
Objective: Sustain improvements and prevent regression.
Load references/tools-by-phase/control/control_plan_guide.md and assets/control_plan_template.md.
Control Plan Elements:
Load references/tools-by-phase/control/control_charts_guide.md.
Control Chart Selection:
| Data Type | Subgroup Size | Chart Type |
|---|---|---|
| Continuous | n = 1 | I-MR (Individuals-Moving Range) |
| Continuous | n = 2-10 | X-bar/R (Average/Range) |
| Continuous | n > 10 | X-bar/S (Average/Std Dev) |
| Attribute (defectives) | Variable | P chart (proportion) |
| Attribute (defectives) | Constant | NP chart (count) |
| Attribute (defects) | Variable | U chart (per unit) |
| Attribute (defects) | Constant | C chart (count) |
Out-of-Control Rules (Western Electric):
Load references/tools-by-phase/control/standard_work.md.
Standard Work Documentation:
Training:
Handoff Checklist:
Before closing project:
Use this workflow when designing a new process or product (not improving existing).
Load references/methodology/02_dmadv_dfss.md for detailed guidance.
Use DMADV when:
Define: Identify the project goals aligned with customer demands and enterprise strategy.
Measure: Measure and determine customer needs and specifications.
Analyze: Analyze process/product options to meet customer needs.
Design: Design the process/product to meet customer needs.
Verify: Verify the design performance and ability to meet customer needs.
Use this workflow to identify and eliminate waste in processes.
Load references/methodology/03_lean_principles.md.
Value Definition: What the customer is willing to pay for
Activity Categories:
Load references/lean-tools/value_stream_mapping.md.
Value Stream Map Elements:
Key Metrics:
Load references/lean-tools/eight_wastes_downtime.md.
| Waste | Description | Examples |
|---|---|---|
| Defects | Rework, scrap, errors | Quality failures, corrections |
| Overproduction | Making more than needed | Large batches, just-in-case |
| Waiting | Idle time, delays | Waiting for approval, information |
| Non-utilized Talent | Underused skills | Not engaging employee ideas |
| Transportation | Moving materials | Excessive shipping, transfers |
| Inventory | Excess stock | WIP, finished goods sitting |
| Motion | Unnecessary movement | Walking, reaching, searching |
| Extra-processing | Over-engineering | Unnecessary features, approvals |
Future State Principles:
Load references/lean-tools/kaizen_events.md.
Kaizen Event (Rapid Improvement):
5S Implementation:
Load references/lean-tools/five_s_guide.md.
| Step | Japanese | English | Action |
|---|---|---|---|
| 1 | Seiri | Sort | Remove unnecessary items |
| 2 | Seiton | Set in Order | Organize remaining items |
| 3 | Seiso | Shine | Clean and inspect |
| 4 | Seiketsu | Standardize | Create standards |
| 5 | Shitsuke | Sustain | Maintain discipline |
Use this workflow when needing statistical guidance.
Load references/statistics/process_capability.md.
Cp (Process Capability):
Cp = (USL - LSL) / (6σ)
Cpk (Process Capability Index):
Cpk = min[(USL - μ)/(3σ), (μ - LSL)/(3σ)]
Interpretation Guide:
| Cpk Value | Interpretation |
|---|---|
| < 1.0 | Not capable - immediate action required |
| 1.0 - 1.33 | Marginally capable - improvement needed |
| 1.33 - 1.67 | Capable - acceptable for most industries |
| 1.67 - 2.0 | Very capable - excellent |
| ≥ 2.0 | World-class - Six Sigma level |
Load references/statistics/control_chart_types.md.
Control Limit Calculation (X-bar/R Chart):
UCL_X = X̄̄ + A₂R̄
LCL_X = X̄̄ - A₂R̄
UCL_R = D₄R̄
LCL_R = D₃R̄
Constants Table:
| n | A₂ | D₃ | D₄ |
|---|---|---|---|
| 2 | 1.880 | 0 | 3.267 |
| 3 | 1.023 | 0 | 2.575 |
| 4 | 0.729 | 0 | 2.282 |
| 5 | 0.577 | 0 | 2.115 |
Load references/statistics/hypothesis_testing.md.
Decision Flowchart:
Q: Comparing what?
├── Two means → 2-sample t-test
├── Multiple means → ANOVA
├── Proportions → Chi-square / Z-test
├── Relationship → Correlation / Regression
└── Factors/Interactions → DOE
Use this matrix to select appropriate tools based on DMAIC phase and purpose.
| Tool | Purpose | When to Use |
|---|---|---|
| Project Charter | Document project scope and goals | Every project |
| SIPOC | High-level process overview | Every project |
| VOC Analysis | Understand customer needs | Customer-focused projects |
| CTQ Tree | Translate needs to measurables | Customer-focused projects |
| Stakeholder Analysis | Identify and engage stakeholders | Complex/political projects |
| Tool | Purpose | When to Use |
|---|---|---|
| Data Collection Plan | Plan what/how to collect | Every project |
| MSA / Gage R&R | Validate measurement system | When data reliability is critical |
| Process Map | Document current process | Every project |
| Time Study | Measure cycle times | Cycle time projects |
| Pareto Chart | Prioritize categories | When categorizing problems |
| Tool | Purpose | When to Use |
|---|---|---|
| Fishbone Diagram | Brainstorm potential causes | Every project |
| 5 Whys | Drill to root cause | Simple cause-effect chains |
| Pareto Analysis | Identify vital few | Multiple problem categories |
| Scatter Plot | Visualize relationships | Exploring correlations |
| Hypothesis Testing | Statistically verify causes | Data-driven verification |
| Regression | Model relationships | Predictive modeling |
| Tool | Purpose | When to Use |
|---|---|---|
| Brainstorming | Generate solutions | Every project |
| Benchmarking | Learn from best practices | Seeking external ideas |
| Pugh Matrix | Select concepts | Multiple solution options |
| FMEA | Risk assessment | Implementing changes |
| Pilot Testing | Test solutions | Before full rollout |
| DOE | Optimize factors | Multiple factors to optimize |
| Tool | Purpose | When to Use |
|---|---|---|
| Control Plan | Document control system | Every project |
| Control Charts | Monitor process stability | Ongoing monitoring |
| Standard Work | Document best practices | Process standardization |
| Visual Management | Make status visible | Sustaining improvements |
| Mistake-Proofing | Prevent errors | Error-prone processes |
Use this workflow for learning and certification preparation.
Load appropriate curriculum from references/training/.
White Belt (4-8 hours):
references/training/white_yellow_belt.mdYellow Belt (1-2 days):
references/training/white_yellow_belt.mdGreen Belt (2-4 weeks):
references/training/green_belt_curriculum.mdBlack Belt (4-8 weeks):
references/training/black_belt_curriculum.mdGreen Belt Level:
Black Belt Level:
Load references/industries/manufacturing.md.
Common Applications:
Specific Tools Emphasis:
Load references/industries/services_transactional.md.
Common Applications:
Adaptation Notes:
Load references/industries/healthcare.md.
Common Applications:
Special Considerations:
Load references/industries/it_software.md.
Common Applications:
Integration with Agile/DevOps:
Methodology (references/methodology/):
01_dmaic_overview.md - Detailed DMAIC guidance02_dmadv_dfss.md - Design for Six Sigma03_lean_principles.md - Lean fundamentalsTools by Phase (references/tools-by-phase/):
Lean Tools (references/lean-tools/):
Statistics (references/statistics/):
Industries (references/industries/):
Training (references/training/):
assets/)project_charter_template.mdsipoc_template.mdcontrol_plan_template.mda3_report_template.mdfmea_template.mdtollgate_review_checklist.mdscripts/)sigma_calculator.py - DPMO, sigma level, yieldprocess_capability.py - Cp, Cpk, Pp, Ppkcontrol_chart_analysis.py - Control limits, out-of-control detection还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
Track and update action item status from natural language updates like 'Seanのメールには返信しておいた' or 'Lu対応予定'. Integrates with daily-comms-ops workflow. Use when managing action items across communication channels.
中文简介正在准备中。当前显示原文说明。
AI活用提案の専門コンサルタントスキル。LLM・AIエージェントの活用事例知識を基に、業界別、部門別、シーン別に最適なAI導入提案を行います。システム化、業務改善、効率化を得意とし、具体的な活用事例、期待効果、導入ステップを含む実践的な提案を提供します。Use when proposing AI/LLM adoption strategies for specific industries, departments, or business scenarios.
中文简介正在准备中。当前显示原文说明。
Generate AI-powered BPO service proposals for Japanese companies in the US market. Use when creating outsourcing proposals with AI service menus, ROI estimation, implementation roadmaps, and bilingual (JA/EN) proposal documents for 在米日系企業向けAI実装.
中文简介正在准备中。当前显示原文说明。
AI(LLM)が生成した日本語テキストの「AI臭」を検出・診断し、人間らしい文章にリライトするスキル。 Use when: 「AIっぽい文章を直して」「人間らしくリライトして」「AI臭を消して」「この文章をもっと自然にして」 「テキストのAI感を減らして」「機械っぽさを取りたい」 "make this sound more human", "remove AI tone", "humanize this text", "detect if this is AI-generated". 6つのAI特有パターン(視覚的マーカー、単調なリズム、マニュアル的構成、非コミット姿勢、抽象語の濫用、 定型メタファー)を正規表現ベースで検出し、0-100のAI臭スコアを算出。3つの人間化技法 (バランスを崩す・客観を崩す・論理を崩す)でリライトを実行する。 Note: 検出スクリプトは日本語テキスト専用。英語テキストの場合はClaude自身がreferences/を参照して分析・リライトする。
中文简介正在准备中。当前显示原文说明。
Generate audit-ready internal control design documents from As-Is business process inventories. Produces control IDs, assertion mappings, procedures, SoD analysis, KPIs, materiality thresholds, and implementation roadmaps. Use when building internal controls for new audit engagements, SOX/J-SOX compliance, or process improvement initiatives.
中文简介正在准备中。当前显示原文说明。
Review audit-related documents (control design documents, bottleneck analyses, requirements definitions, etc.) for quality, scoring them 0-100 with a severity-rated findings list. Use when reviewing audit documents, checking control design quality, or verifying cross-document consistency. Supports documents governed by US GAAP, IFRS, or J-GAAP.
中文简介正在准备中。当前显示原文说明。