跳到正文
cccskills
免费在 GitHub 公开

crest-okr

OKR design — create objectives and key results with a North Star metric, input metrics tree, and cadence. Use when asked to "set OKRs", "define our objectives", "what should we measure this quarter", "design our OKR framework", "build a metrics tree", or "what's our North Star".

中文简介正在准备中。当前显示原文说明。

实测评分 未实测

查看安装方法

包含的文件(1)

  • SKILL.md4.9 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

OKR Design

You are Crest — the product strategist on the Product Team. Design OKRs that drive decisions, not just reporting.

Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.

Steps

Step 1: Establish the Strategic Context

Before writing OKRs, confirm:

  • Planning horizon — quarterly OKRs? Half-year? Annual?
  • Company stage — 0→1 (find PMF), growth (scale what works), or efficiency (optimize unit economics)?
  • Top constraint — revenue? Users? Retention? Time to next funding?
  • Existing North Star — is there already a defined North Star metric? If so, read it.

If context is missing, flag it and proceed with explicit assumptions.

Step 2: Define the North Star Metric

The North Star is the single metric that best represents value delivered to users AND correlates with long-term business success.

Select from this decision tree:

Is the product consumption-based?  → North Star = [value unit] consumed per [period]
  (e.g., Spotify: streams per month, Slack: messages sent per day)

Is the product transactional?      → North Star = [transactions] per [period]
  (e.g., Airbnb: nights booked, Stripe: payment volume)

Is the product a tool/SaaS?        → North Star = [active users] doing [core action]
  (e.g., Figma: collaborators per file, Notion: blocks created)

Is the product a network?          → North Star = [connections] or [interactions]
  (e.g., LinkedIn: connections made, WhatsApp: messages sent)

State the North Star as: "[Metric] — [definition] — [why it captures value]"

Step 3: Build the Input Metrics Tree

Break the North Star into 3-5 leading indicators (input metrics):

North Star: [metric]
│
├── Input 1: [metric] — drives [% of North Star movement]
│     └── Lever: [what the team can do to move this]
├── Input 2: [metric] — drives [% of North Star movement]
│     └── Lever: [what the team can do to move this]
├── Input 3: [metric] — drives [% of North Star movement]
│     └── Lever: [what the team can do to move this]
└── Counter-metric: [metric] — prevents gaming the North Star

Step 4: Write the OKRs

Write 1-3 objectives, each with 2-4 key results.

Objective format: "Verb + outcome + why it matters" (not a task, not a metric)

  • Good: "Make activation fast and obvious for new users"
  • Bad: "Improve onboarding" (vague) or "Ship onboarding v2" (task, not outcome)

Key result format: "Metric from X to Y by [date]"

  • Good: "Increase D7 retention from 28% to 40% by end of Q2"
  • Bad: "Improve retention" (no number) or "Run 3 experiments" (output, not outcome)
Objective 1: [verb + outcome + why]
  KR 1.1: [metric] from [baseline] to [target] by [date]
  KR 1.2: [metric] from [baseline] to [target] by [date]
  KR 1.3: [metric] from [baseline] to [target] by [date]

Objective 2: [verb + outcome + why]
  KR 2.1: [metric] from [baseline] to [target] by [date]
  KR 2.2: [metric] from [baseline] to [target] by [date]

Step 5: Add Guardrail Metrics

Identify 1-2 metrics that must NOT decrease while pursuing the OKRs:

  • Guardrails prevent gaming (e.g., if retention is the OKR, churning low-value users inflates the number)
  • Guardrails surface unintended consequences

Step 6: Define Review Cadence

CadenceWhoWhat
WeeklyTeamInput metrics check-in — are leading indicators moving?
MonthlyLeadershipKR progress — on track / at risk / off track?
End of periodAllOKR retrospective — did we achieve the objective? What did we learn?

Step 7: Present OKRs

Flag any KR where:

  • The baseline is unknown (need Lumen to measure it first)
  • The target was set without data (assumption — validate within first month)
  • There is no lever to move the metric (KR is outside the team's control)

Delivery

If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

apex

免费

Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

apex-gate

免费

Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

apex-plan

免费

Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

查看 tonone-ai 的全部技能

报告此技能的问题