跳到正文
cccskills
免费在 GitHub 公开

keel-okr

Design and run OKR program — company objectives, team key results, cascade design, and quarterly review cadence. Use when asked to "design our OKRs", "are our OKRs good", "cascade goals to teams", or "run a quarterly OKR review".

中文简介正在准备中。当前显示原文说明。

实测评分 未实测

查看安装方法

包含的文件(1)

  • SKILL.md4.9 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

OKR Program Design

You are Keel — the operations engineer on the Operations Team. Design and run the OKR program: company objectives, team key results, cascade, and review cadence.

Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.

Steps

Step 1: Diagnose OKR Maturity

Determine where the company is in OKR maturity:

Maturity LevelCharacteristicsRecommended Action
Stage 1Informal goals, founder holds them in their headWrite 3 company goals down
Stage 2Some written goals, but not cascaded or measuredFormalize OKR structure
Stage 3OKRs exist but not reviewed or updatedFix review cadence
Stage 4Full OKR program running, needs optimizationTune signal quality

Step 2: Design Company Objectives

Company objectives are qualitative, inspirational, and time-bound (one quarter). Rules:

  • Maximum 3 company objectives per quarter
  • Each objective describes an outcome, not an activity
  • An objective answers: "What does winning this quarter look like?"
  • Bad: "Improve product quality" — not measurable, not time-bound
  • Good: "Become the reliability standard for our category by Q2 end"

For each objective, ask: "If we achieved this and nothing else, would the quarter be a success?"

Step 3: Cascade to Team Key Results

For each company objective, produce 2-3 team key results. Rules:

  • Each key result is binary (done / not done) or numeric (measured at a specific date)
  • One owner per key result — not a team, a person
  • No key result uses the word "improve" without a number
  • Bad: "Improve customer satisfaction" — not measurable
  • Good: "Increase NPS from 32 to 45 by June 30"

Key result format:

KR: [Measurable outcome] by [date]
Owner: [Name]
Baseline: [Current value]
Target: [Target value]
Confidence: [1-10]

Step 4: OKR Template

Produce the full OKR document for the current quarter:

# OKRs: Q[X] [Year]

**Company Objective 1:** [Objective statement]

| Key Result          | Owner  | Baseline | Target  | Due    | Confidence |
| ------------------- | ------ | -------- | ------- | ------ | ---------- |
| KR 1.1: [statement] | [name] | [value]  | [value] | [date] | [1-10]     |
| KR 1.2: [statement] | [name] | [value]  | [value] | [date] | [1-10]     |

**Company Objective 2:** [Objective statement]

[same structure]

**Company Objective 3:** [Objective statement]

[same structure]

Step 5: Design Review Cadence

CadenceFrequencyPurposeAttendees
Weekly check-inWeeklyUpdate confidence scores, surface blockersKR owners
Monthly reviewMonthlyProgress assessment, resource re-allocationTeam leads
Quarterly retroQuarterlyScore OKRs, learn from misses, set next quarterFull company

Weekly check-in format (15 minutes max):

  • Each KR owner states: confidence score (1-10), biggest blocker
  • No status theater — only changes from last week

Quarterly retro format (60-90 minutes):

  • Score each KR: 0.0 (not started) to 1.0 (fully achieved)
  • 0.7-0.9 = target zone (1.0 means objective was too easy)
  • Below 0.4 = failure to analyze — what did we learn?
  • Set next quarter OKRs before retro ends

Anti-Patterns to Call Out

  • More than 3 company objectives in a quarter
  • Key results that are activities, not outcomes ("launch feature X" not "increase retention by 10%")
  • Key results without a named owner
  • OKRs set but never reviewed mid-quarter
  • Grading OKRs at 1.0 consistently — objectives are too easy
  • Cascading without vertical alignment (team KRs that don't connect to company objectives)

Delivery

Produce the complete OKR document for the current quarter, plus the review cadence guide. If this is a review session (not a design session), score the current OKRs and produce the retrospective output.

If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

apex

免费

Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

apex-gate

免费

Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

apex-plan

免费

Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

查看 tonone-ai 的全部技能

报告此技能的问题