LeanUX backlog management methodology - user story template, story sizing, story states, task types, Definition of Ready/Done, anti-pattern detection and remediation
The English summary is being prepared. Showing the original description.
See how to installReview the instructions the agent will receive before you install.
"A backlog is not a todo list. It's a collection of validated hypotheses waiting to become working software."
| State | Meaning | Entry Criteria |
|---|---|---|
| Draft | Idea captured, not validated | Has problem statement |
| Ready | Validated, has UAT, ready to build | All DoR items complete |
| In Progress | Actively being built | UAT test written (RED) |
| In Review | Code complete, awaiting review | All tests green |
| Done | Merged, deployed, validated | UAT passes in production |
| Blocked | Cannot proceed | Blocker documented |
Completable in 1-3 days | 3-7 UAT scenarios | Delivers demonstrable value | Explainable in 2 minutes
7 UAT scenarios | >3 days effort | Multiple distinct user outcomes | Cannot demonstrate in single session
Split by user outcome, not technical layer. Each resulting story delivers independently demonstrable value.
Example: "User Management" (20 scenarios) splits into:
Stories pass ALL 8 items before proceeding to DESIGN wave.
1. Problem statement clear and in domain language
2. User/persona identified with specific characteristics
3. At least 3 domain examples with real data
4. UAT scenarios in Given/When/Then (3-7 scenarios)
5. Acceptance criteria derived from UAT
6. Story right-sized (1-3 days, 3-7 scenarios)
7. Technical notes identify constraints
8. Dependencies resolved or tracked
## Definition of Ready Validation
### Story: {story-id}
| DoR Item | Status | Evidence/Issue |
|----------|--------|----------------|
| Problem statement clear | PASS/FAIL | {evidence or issue} |
| User/persona identified | PASS/FAIL | {evidence or issue} |
| 3+ domain examples | PASS/FAIL | {evidence or issue} |
| UAT scenarios (3-7) | PASS/FAIL | {evidence or issue} |
| AC derived from UAT | PASS/FAIL | {evidence or issue} |
| Right-sized | PASS/FAIL | {evidence or issue} |
| Technical notes | PASS/FAIL | {evidence or issue} |
| Dependencies tracked | PASS/FAIL | {evidence or issue} |
### DoR Status: PASSED / BLOCKED
When DoR fails:
DoD validation owned by acceptance-designer during DISTILL->DELIVER transition. Product-owner defines checklist, acceptance-designer enforces.
Checklist:
Flow from Ready story to Done story follows double-loop TDD:
| Category | Meaning | Guideline |
|---|---|---|
| Must Have | Required for MVP | Without this, release has no value |
| Should Have | Important for full product value | Significant value, workaround exists |
| Could Have | Nice-to-have for enhanced experience | Desirable if time/budget allows |
| Won't Have | Deferred to future releases | Acknowledged, explicitly out of scope |
Assign MoSCoW during Phase 2 (CRAFT) when multiple stories emerge from same requirements conversation.
| Low Effort | High Effort | |
|---|---|---|
| High Value | Quick wins -- do first | Strategic investments -- plan carefully |
| Low Value | Fill-ins -- do if time allows | Eliminate or defer |
Quick wins build momentum and stakeholder confidence. Strategic investments need baseline measurement and roadmap planning (see jtbd-workflow-selection skill).
During Phase 4 (HANDOFF), include brief risk assessment. Categorize:
Business Risks: market changes | regulatory changes | stakeholder availability | budget/timeline constraints Technical Risks: integration complexity | technology uncertainty | data migration | performance/security unknowns Project Risks: resource availability | scope creep potential | communication challenges | testing coverage gaps
For each risk: probability (low/medium/high) | impact (low/medium/high) | mitigation approach (avoid, mitigate, transfer, accept). Detailed risk management belongs to downstream waves -- product-owner surfaces risks, does not manage them.
When handing off to DESIGN wave (solution-architect), include:
No reviews yet. Tell others what you thought.
No login needed. Share how it worked for you, ask a question, or note where it did not run.
No comments yet. Be the first to write one.
Review dimensions for validating agent quality - template compliance, safety, testing, and priority validation
The English summary is being prepared. Showing the original description.
Review dimensions for validating agent quality - template compliance, safety, testing, and priority validation
The English summary is being prepared. Showing the original description.
Review dimensions for acceptance test quality - happy path bias, GWT compliance, business language purity, coverage completeness, walking skeleton user-centricity, priority validation, observable behavior assertions, traceability coverage, and walking skeleton boundary proof
The English summary is being prepared. Showing the original description.
Detailed 5-phase workflow for creating agents - from requirements analysis through validation and iterative refinement
The English summary is being prepared. Showing the original description.
5-layer testing approach for agent validation including adversarial testing, security validation, and prompt injection resistance
The English summary is being prepared. Showing the original description.
Architectural style selection decision matrices, trade-off analysis, structural enforcement rules, and combination patterns. Load when choosing or evaluating architecture styles.
The English summary is being prepared. Showing the original description.