Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Create 4D construction simulations by linking BIM models with project schedules.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
실행 점수 미검증
설치 방법 보기설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.
import pandas as pd
from datetime import date, datetime
from typing import Dict, Any, List
from dataclasses import dataclass, field
from enum import Enum
class SimulationStatus(Enum):
SETUP = "setup"
READY = "ready"
RUNNING = "running"
COMPLETE = "complete"
@dataclass
class TimeSlice:
slice_date: date
visible_elements: List[str]
active_activities: List[str]
completed_activities: List[str]
@dataclass
class Simulation4D:
simulation_id: str
name: str
start_date: date
end_date: date
interval_days: int
status: SimulationStatus
time_slices: List[TimeSlice] = field(default_factory=list)
class BIMSchedule4DSimulation:
def __init__(self, project_name: str):
self.project_name = project_name
self.elements: Dict[str, Dict[str, Any]] = {}
self.activities: Dict[str, Dict[str, Any]] = {}
self.links: Dict[str, List[str]] = {} # activity_id: [element_ids]
self.simulations: Dict[str, Simulation4D] = {}
def add_element(self, element_id: str, name: str, category: str, level: str):
self.elements[element_id] = {
'id': element_id, 'name': name, 'category': category, 'level': level
}
def add_activity(self, activity_id: str, name: str, start: date, end: date):
self.activities[activity_id] = {
'id': activity_id, 'name': name, 'start': start, 'end': end
}
def link_elements(self, activity_id: str, element_ids: List[str]):
self.links[activity_id] = element_ids
def create_simulation(self, name: str, start: date, end: date,
interval_days: int = 7) -> Simulation4D:
sim_id = f"SIM-{len(self.simulations) + 1:03d}"
simulation = Simulation4D(
simulation_id=sim_id,
name=name,
start_date=start,
end_date=end,
interval_days=interval_days,
status=SimulationStatus.SETUP
)
self.simulations[sim_id] = simulation
return simulation
def generate_time_slices(self, sim_id: str):
if sim_id not in self.simulations:
return
sim = self.simulations[sim_id]
sim.time_slices = []
current = sim.start_date
while current <= sim.end_date:
visible = []
active = []
completed = []
for act_id, act in self.activities.items():
if act['end'] < current:
completed.append(act_id)
if act_id in self.links:
visible.extend(self.links[act_id])
elif act['start'] <= current <= act['end']:
active.append(act_id)
if act_id in self.links:
visible.extend(self.links[act_id])
slice = TimeSlice(
slice_date=current,
visible_elements=list(set(visible)),
active_activities=active,
completed_activities=completed
)
sim.time_slices.append(slice)
from datetime import timedelta
current += timedelta(days=sim.interval_days)
sim.status = SimulationStatus.READY
def get_slice_at_date(self, sim_id: str, target_date: date) -> TimeSlice:
if sim_id not in self.simulations:
return None
sim = self.simulations[sim_id]
for slice in sim.time_slices:
if slice.slice_date == target_date:
return slice
return None
def export_simulation(self, sim_id: str, output_path: str):
if sim_id not in self.simulations:
return
sim = self.simulations[sim_id]
data = [{
'Date': s.slice_date,
'Visible Elements': len(s.visible_elements),
'Active Activities': len(s.active_activities),
'Completed': len(s.completed_activities)
} for s in sim.time_slices]
pd.DataFrame(data).to_excel(output_path, index=False)
sim = BIMSchedule4DSimulation("Office Tower")
sim.add_element("E001", "Footing", "Foundation", "B1")
sim.add_activity("A100", "Foundation", date(2024, 1, 1), date(2024, 2, 28))
sim.link_elements("A100", ["E001"])
simulation = sim.create_simulation("Construction Sequence", date(2024, 1, 1), date(2024, 12, 31))
sim.generate_time_slices(simulation.simulation_id)
아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.
로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.
아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.