Review a sprint or milestone by comparing planned work with actual results. Summarize completion, estimation gaps, and blockers, then produce a retrospective with specific improvement actions, owners, and deadlines for the next iteration.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

원문원문 설명 보기

Sprint or milestone retrospective from completed work, velocity, blockers. Actionable insights for the next iteration.

설치 방법 보기

이럴 때 유용합니다

  • Reviewing completed work at the end of a sprint
  • Investigating estimation gaps and carried-over tasks
  • Checking progress on previous improvement actions
  • Preparing improvement actions for the next iteration

포함된 파일(1)

  • SKILL.md12.1 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys automation,workflow,qa.level

Retrospective

Every AskUserQuestion call follows .claude/docs/automation-modes.md (collaborative asks always · guided major-only · autonomous logs and proceeds; automation_always_ask categories always prompt).

Insufficient input — check this before producing any report

If the inputs this skill needs do not exist, the answer is "could not run" — not a filled-in report. Check first, and stop if the check fails.

  1. List the inputs this skill reads (data files, prior reports, profiler output, test results, registries, source code).
  2. For each, record FOUND or ABSENT — not "assumed present".
  3. If any input required for a section is ABSENT, that section is NOT ASSESSED — NO DATA. Do not estimate it, do not infer it from an adjacent artifact, and do not leave a mandated cell to be filled by whoever reads the template next.
  4. If every required input is ABSENT, stop and report NOT ASSESSED — NO DATA as the whole verdict, naming what was missing and which skill produces it.

A verdict of NOT ASSESSED is a success. It is the correct, useful answer to "what does the data say?" when there is no data. The failure mode this prevents is specific: a report whose verdict enum has no "could not run" state produces false clean passes — an asset audit returning COMPLIANT on a project with no assets and no standards, or a performance profile reporting ">99% headroom against a 16.67ms budget" with zero profiler data and no budget ever set.

Absence of evidence is never evidence of absence. A scan that finds no matches because there are no files to scan has not verified anything. Say which of the two happened — a reader cannot tell from a green result.


Phase 1: Parse Arguments

Determine whether this is a sprint retrospective (sprint-N) or a milestone retrospective (milestone-name).


Phase 1b: Check for Existing Retrospective

Before loading any data, glob for an existing retrospective file:

  • For sprint retrospectives: production/retrospectives/retro-[sprint-slug]-*.md (also check production/sprints/sprint-[N]-retrospective.md as an alternate location)
  • For milestone retrospectives: production/retrospectives/retro-[milestone-name]-*.md

If a matching file is found, use AskUserQuestion:

  • Prompt: "An existing retrospective was found: [filename]. How do you want to proceed?"
  • Options:
    • [A] Update existing — load it and add/revise sections with new data
    • [B] Start fresh — generate a new retrospective (archive the old one)

If [A]: read the existing file and carry its content forward, revising sections with new data. If [B]: continue to Phase 2 with a blank slate. Before writing the new file, rename the existing one with a -archived-[date] suffix. That rename is a write too: it happens in Phase 5, only once the ask there — which names it — is approved.


Phase 2: Load Sprint or Milestone Data

Read the sprint or milestone plan from the appropriate location:

  • Sprint plans: production/sprints/
  • Milestone definitions: production/milestones/

Also check for production/sprint-status.yaml: if it exists, read it alongside the sprint plan. It is the authoritative source for actual story completion status (status: done, completed dates, blockers). Use it as the primary source for completion metrics in Phase 3. Fall back to markdown scanning only if the yaml does not exist. Note discrepancies between the yaml and the sprint plan (e.g., stories in yaml not in plan, or vice versa).

If the file does not exist or is empty, output:

"No sprint data found for [sprint/milestone]. Run /sprint-plan new to create a sprint (/sprint-status only reads one), or provide the sprint details manually."

At workflow: minimal (resolved above) there are no sprints: offer to look back over the stories closed so far instead (production/epics/*/story-*.md with Status: Complete). At qa.level: minimal (resolved above) tests are waived, so a story closed without one is not a finding; a Visual/Feel or UI story closed without its retained screenshot still is.

Then use AskUserQuestion to present these options ([C] only at workflow: minimal):

  • [A] Provide data manually — ask the user to paste or describe the sprint tasks, dates, and outcomes; use that as the source of truth for the retrospective.
  • [B] Stop — abort the skill. Verdict: BLOCKED — no sprint data available.
  • [C] Look back over the closed stories — use the stories with Status: Complete as the record of what was done.

If the user chooses [A], collect the data and continue to Phase 3 using what they provide. If the user chooses [B], stop here. If the user chooses [C], read those stories and continue to Phase 3. Sections that need sprint data (planned vs actual, velocity, carryover, estimation accuracy) are NOT ASSESSED — NO DATA.

Extract: planned tasks, estimated effort, owners, and goals.

Run git log for the sprint period to understand what was actually committed and when. Use the Bash tool (which uses Git Bash on Windows — the 2>/dev/null is bash syntax, not PowerShell):

Bash: git log --oneline --since="4 weeks ago" 2>/dev/null || git log --oneline -20

Adjust the --since date to match the sprint duration if known from the sprint plan.


Phase 3: Analyze Completion and Trends

Scan for completed and incomplete tasks by comparing the plan against actual deliverables. Check for:

  • Tasks completed as planned
  • Tasks completed but modified from the plan
  • Tasks carried over (not completed)
  • Tasks added mid-sprint (unplanned work)
  • Tasks removed or descoped

Every story with status: blocked in production/sprint-status.yaml goes under Blockers Encountered, with its blocker field as the Blocker, and gets an action item in Action Items for Next Iteration.

Scan the codebase for TODO/FIXME trends:

  • Count current TODO/FIXME/HACK comments
  • Compare to previous sprint counts if available (check previous retrospectives)
  • Note whether technical debt is growing or shrinking

Read previous retrospectives (if any) from production/retrospectives/ to check:

  • Were previous action items addressed?
  • Are the same problems recurring?
  • How has velocity trended?

With no earlier sprint or retrospective, Velocity Trend keeps only the current sprint's row and reads NOT ASSESSED — NO DATA, and Previous Action Items Follow-Up is that one line — no invented earlier rows, no empty table.


Phase 4: Generate the Retrospective

## Retrospective: [Sprint N / Milestone Name]
Period: [Start Date] -- [End Date]
Generated: [Date]

### Metrics

| Metric | Planned | Actual | Delta |
|--------|---------|--------|-------|
| Tasks | [X] | [Y] | [+/- Z] |
| Completion Rate | -- | [Z%] | -- |
| Story Points / Effort Days | [X] | [Y] | [+/- Z] |
| Bugs Found | -- | [N] | -- |
| Bugs Fixed | -- | [N] | -- |
| Unplanned Tasks Added | -- | [N] | -- |
| Commits | -- | [N] | -- |

### Velocity Trend

| Sprint | Planned | Completed | Rate |
|--------|---------|-----------|------|
| [N-2] | [X] | [Y] | [Z%] |
| [N-1] | [X] | [Y] | [Z%] |
| [N] (current) | [X] | [Y] | [Z%] |

**Trend**: [Increasing / Stable / Decreasing — or `NOT ASSESSED — NO DATA` with no earlier sprint to compare]
[One sentence explaining the trend]

### What Went Well
- [Observation backed by specific data or examples]
- [Another positive observation]
- [Recognize specific contributions or decisions that paid off]

### What Went Poorly
- [Specific issue with measurable impact -- e.g., "Feature X took 5 days
  instead of estimated 2, blocking tasks Y and Z"]
- [Another issue with impact]
- [Do not assign blame -- focus on systemic causes]

### Blockers Encountered

| Blocker | Duration | Resolution | Prevention |
|---------|----------|------------|------------|
| [What blocked progress] | [How long] | [How it was resolved] | [How to prevent recurrence] |

### Estimation Accuracy

| Task | Estimated | Actual | Variance | Likely Cause |
|------|-----------|--------|----------|--------------|
| [Most overestimated task] | [X] | [Y] | [+Z] | [Why] |
| [Most underestimated task] | [X] | [Y] | [-Z] | [Why] |

**Overall estimation accuracy**: [X%] of tasks within +/- 20% of estimate

[Analysis: Are we consistently over- or under-estimating? For which types of
tasks? What adjustment should we apply?]

### Carryover Analysis

| Task | Original Sprint | Times Carried | Reason | Action |
|------|----------------|---------------|--------|--------|
| [Task that was not completed] | [Sprint N-X] | [N] | [Why] | [Complete / Descope / Redesign] |

### Technical Debt Status
- Current TODO count: [N] (previous: [N])
- Current FIXME count: [N] (previous: [N])
- Current HACK count: [N] (previous: [N])
- Trend: [Growing / Stable / Shrinking]
- [Note any areas of concern]

### Previous Action Items Follow-Up

| Action Item (from Sprint N-1) | Status | Notes |
|-------------------------------|--------|-------|
| [Previous action] | [Done / In Progress / Not Started] | [Context] |

### Action Items for Next Iteration

| # | Action | Owner | Priority | Deadline |
|---|--------|-------|----------|----------|
| 1 | [Specific, measurable action] | [Who] | [High/Med/Low] | [When] |
| 2 | [Another action] | [Who] | [Priority] | [When] |

### Process Improvements
- [Specific change to how we work, with expected benefit]
- [Another improvement -- keep it to 2-3 actionable items, not a wish list]

### Summary
[2-3 sentence overall assessment: Was this a good sprint/milestone? What is
the single most important thing to change going forward?]

Phase 5: Save Retrospective

Present the retrospective and top findings to the user (completion rate, velocity trend, top blocker, most important action item).

Ask: "May I write this to production/retrospectives/retro-sprint-[N]-[date].md?" (or production/retrospectives/retro-[milestone-name]-[date].md for milestone retrospectives)

After Start fresh in Phase 1b, the same ask also names the rename: "…and rename [old file] to [old file name]-archived-[date].md?" On yes, rename first, then write; on no, neither happens.

If yes, write the file, creating the production/retrospectives/ directory if needed. Verdict: COMPLETE — retrospective saved.

If no, stop here. Verdict: BLOCKED — user declined write.


Phase 6: Next Steps

At workflow: minimal (resolved above), which has no sprints, skip this question: point to the retrospective file and say its action items go into the brief's build order.

Otherwise, use AskUserQuestion:

  • Prompt: "Retrospective complete. The action items and velocity data are ready. Would you like to start sprint planning now with this data pre-loaded?"
  • Options:
    • [A] Yes — open sprint planning with retro action items and velocity delta pre-populated
    • [B] No — I'll reference the retrospective file manually when I'm ready

If the user selects [A]: Proceed to invoke /sprint-plan new, passing the retrospective file path and a summary of the action items and velocity change so the sprint planner can reference them.

  • If this was a milestone retrospective, run /gate-check to formally assess readiness for the next phase.

Guidelines

  • Be honest and specific. Vague retrospectives ("communication could be better") produce vague improvements. Use data and examples.
  • Focus on systemic issues, not individual blame.
  • Limit action items to 3-5. More than that dilutes focus.
  • Every action item must have an owner and a deadline.
  • Check whether previous action items were completed. Recurring unaddressed items are a process smell.
  • If this is a milestone retrospective, also evaluate whether the milestone goals were achieved and what that means for the overall project timeline.

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

adopt

무료

Audit an existing project's design documents and supporting files to check whether their formats work with the template's skills. Get a numbered migration plan that prioritizes gaps and required changes, rather than simply listing what exists.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

  • Checking existing documents before adopting a project template
  • Auditing game design documents or architecture decision records
  • Prioritizing gaps in project tracking and configuration files
Donchitos/Claude-Code-Game-Studios2.7만2026년 10월 8일 업데이트

Document a technical decision in an architecture decision record, or ADR. Capture its context, alternatives, and consequences, assign a record number, and distinguish a proposed decision from an accepted one so dependent work reflects its actual status.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

  • Recording the reasons behind a technical choice
  • Documenting alternatives and consequences of a design decision
  • Creating numbered records alongside existing architecture decisions
Donchitos/Claude-Code-Game-Studios2.7만2026년 10월 8일 업데이트

Review whether game design requirements are covered by documented architecture decisions. Identify missing coverage, conflicting decisions, and engine compatibility concerns, with an optional matrix linking requirements to development stories and tests.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

  • Find game requirements without architecture decisions
  • Check for conflicts between architecture decisions
  • Review compatibility with the pinned engine version
Donchitos/Claude-Code-Game-Studios2.7만2026년 10월 8일 업데이트

art-bible

무료

Create a game's art direction document, defining its visual rules, mood, shapes, colors, and production standards. Review and approve sections individually, with guidance that connects character, environment, and interface design to the game's concept and technical constraints.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

  • Defining a game's core visual identity before asset production
  • Documenting character, environment, and interface design rules
  • Aligning asset standards with engine and performance limits
Donchitos/Claude-Code-Game-Studios2.7만2026년 10월 8일 업데이트

Audit game asset files for naming rules, size limits, formats, and broken references. Receive a report of measured violations and suggested fixes, with clear explanations of checks that lack data or cannot be assessed for the engine.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

  • Checking image and audio naming conventions
  • Finding files that exceed asset size limits
  • Investigating missing references and potentially unused assets
Donchitos/Claude-Code-Game-Studios2.7만2026년 10월 8일 업데이트

Turn game design documents and character profiles into asset specifications and image generation prompts. Define appearance, dimensions, file formats, and naming rules, then maintain an asset list that tracks progress and identifies shared assets.

한국어 요약은 준비 중입니다. 영어 요약을 표시하고 있습니다.

  • List the visual assets needed for a game
  • Define consistent character and environment asset specifications
  • Prepare image generation prompts from an art direction guide
Donchitos/Claude-Code-Game-Studios2.7만2026년 10월 8일 업데이트

Donchitos의 스킬 모두 보기

이 스킬의 문제 신고