본문으로 건너뛰기
cccskills
무료GitHub에 공개

spec-chain

Preserve an approved specification through a complete implementation plan and execution. Use for major refactors, migrations, or multi-session work when a confirmed spec is authoritative; keep scope and order changes explicit.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(4)

  • SKILL.md8.3 KB
  • agents/openai.yaml399 B
  • assets/icon-400.png1.4 KB
  • assets/icon.svg1.1 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

Spec Chain

Preserve an approved specification from planning through execution. The specification defines the required outcome and acceptance contract; the plan defines implementation order and technique.

Authority

  • Treat the accepted specification as the canonical authority for what must be implemented, why it exists, and how completion is accepted.
  • Agent-authored specifications, plans, decision logs, handoffs, PR descriptions, and implementation commits are derived material. An agent-authored artifact does not become approved authority merely because it is newer, more detailed, executable, or already implemented; require evidenced applicable approval when it changes programme order, trust boundaries, or product meaning.
  • A plan presented as the implementation plan for that specification must cover its entire accepted implementation scope.
  • A phase, milestone, or current tranche may subdivide execution, but it may not replace the complete implementation plan or be presented as though it covers the whole specification.
  • Keep explicit non-goals excluded. Keep unresolved decisions inside the full plan as decision-closing prerequisites or blockers; do not make them disappear by narrowing the plan.
  • Preserve settled semantics such as naming, cardinality, ownership, compatibility, and migration behavior. Implementation convenience is not authority to reopen them.

Establish the source contract

Before planning or editing, identify:

  • Canonical specification path
  • Accepted revision or commit
  • Approval state and any named open decisions
  • Repository baseline the specification was grounded against
  • Current implementation state where it may have moved
  • Present consumer, current requirement, and authorization provenance when the specification proposes a generalized protocol, new infrastructure, or a programme reorder

Use a stable path plus revision or commit. Do not calculate a hash unless an actual identity or integrity decision needs it.

If several documents contribute requirements, name one primary specification and list the exact normative companions. Do not silently choose whichever document makes the next slice smaller.

If artifacts disagree, resolve their authority rather than using recency or implementation completeness as a proxy for approval. A research implementation may remain valuable evidence while staying outside the accepted product programme.

Build the complete implementation plan

When the request is for the full specification, create one program-level plan over the full accepted scope. An explicitly bounded tranche request needs only its applicable requirements, dependencies, and stopping point. Link an existing complete plan; if absent, note that fact and resolve only dependencies that block the tranche. Do not expand the request into whole-program planning. Retain the existing status of other requirements; do not replan them or imply they were delivered in this request.

For a full-spec plan:

  1. Extract normative requirements, settled decisions, acceptance criteria, migrations, compatibility obligations, and retained non-goals.
  2. Refer to existing IDs or headings instead of copying specification prose. When the specification lacks stable identifiers, create compact plan-local IDs tied to its headings.
  3. Map every accepted requirement to an implementation slice and verification outcome.
  4. Order slices by real dependencies. A different order from the specification is allowed only when the plan records the dependency rationale and preserves the same outcome.
  5. Identify the current execution tranche without removing later slices from the program plan.
  6. Include decision-closing work before any slice that depends on an unresolved product or destructive choice.

The plan may use several PRs, releases, or sessions. Full coverage does not require a mega-PR.

Required plan contract

For a full-spec plan, keep the artifact compact and include the sections below. A tranche-only request uses the applicable subset and specification links; it does not need a whole-program coverage ledger or sequence.

Spec authority

  • Canonical path and accepted revision
  • Normative companion documents, if any
  • Repository baseline and freshness note

Complete coverage ledger

For each requirement or acceptance ID, record:

  • Intended outcome
  • Owning implementation slice
  • Dependency or decision gate
  • Verification evidence
  • Status: planned, blocked-decision, in-progress, implemented, or verified

planned may be scheduled later. An accepted requirement cannot be marked out of scope merely because it is outside the current tranche.

Dependency order

Show the full program sequence or dependency graph. Distinguish definition, enforcement, migration, activation, and deployment when the specification distinguishes them.

Scope and order deltas

List every proposed added, removed, narrowed, or reordered item with:

  • Affected specification IDs
  • Reason and impact
  • Whether it changes product meaning or only implementation technique
  • Required decision owner

No entry means no delta. Never hide a scope change inside “minimal,” “first slice,” “later,” or “implementation detail.” Obtain explicit approval before adopting a product or acceptance delta.

Execution tranches

Name the current tranche and its stopping point. Keep later accepted scope reachable through the specification or existing complete plan. Label a tranche document Execution Tranche, not “the implementation plan for the specification.” Link the complete plan when one exists; otherwise link the relevant specification anchors and state the planning boundary.

Full acceptance

Define completion against the specification coverage ledger, not only the current tranche checklist.

Execute without losing the specification

At execution entry, read:

  • The accepted specification and normative companions
  • The complete implementation plan when it exists or the request requires one
  • The current execution tranche, when separate
  • Current repository instructions and directly affected code/tests

Before editing, check coverage against the requested scope. A full-spec plan must still cover the complete accepted specification. Repair a partial phase plan masquerading as the full plan before relying on that claim; an explicitly bounded tranche needs its applicable requirements and settled dependencies.

During implementation:

  • Adapt file paths, internal abstractions, and test mechanics when repository evidence supports the same contract.
  • Record any scope, meaning, acceptance, or dependency change as an explicit delta before proceeding.
  • Update the coverage ledger as evidence lands.
  • Report tranche completion separately from full-spec completion.
  • Keep implementation, merge, migration, deployment, and live-state activation as separate authorization gates.

Do not claim the specification is implemented until every accepted coverage item is implemented and verified at the appropriate risk level.

One continuing record

Reuse the selected task plan for this coverage and its route, evidence and continuation; do not create a second requirement ledger when Plan adds persistence. Plan governs record creation, resumption, material updates, maintainer ownership and closure. Link a separate accepted specification rather than turn it into an execution log. Evidence and implementation must be reconciled on recovery before reusing old coverage states.

Token discipline

  • Link to specification anchors; do not restate the document.
  • Maintain one coverage ledger instead of duplicating requirements across checklists.
  • Record deltas only when they exist.
  • Do not add separate reviewers, hashes, or ceremonial checkpoints by default.
  • Automate coverage checks only when stable IDs and repeated use make the script cheaper than manual reconciliation.

Regression guard

If a specification settles one public operation over a package of one or many items, a plan may not implement single-item behavior first and defer package cardinality unless the specification is explicitly amended. More generally, an easier subset is not an implementation plan for the whole contract.

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

debug

무료

Investigate and fix bugs, failing tests, regressions, build failures, or unexpected behavior using boundary localization, evidence, and bounded hypotheses.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

IndelibleVivi/servotab262026년 10월 15일 업데이트

delegate

무료

Choose responsibility for substantial work before deep execution: keep one responsibility's coupled parts in a single lane, and hand a bounded or independent lane to a worker when clean context, an unknown cause, independent review, or coordinator attention materially improves the outcome.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

IndelibleVivi/servotab262026년 10월 15일 업데이트

design

무료

Turn a rough feature, product interaction, or architecture idea into a concrete design. Use when meaningful decisions remain open; avoid for already-clear local edits.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

IndelibleVivi/servotab262026년 10월 15일 업데이트

execute

무료

Implement a settled request or current execution strategy through connected slices, feed observations into the same task record, and revise affected work when evidence changes.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

IndelibleVivi/servotab262026년 10월 15일 업데이트

finish

무료

Finish a development change safely by inspecting the final tree, verifying at the right scope, and performing only the requested Git or PR actions.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

IndelibleVivi/servotab262026년 10월 15일 업데이트

Assess, adapt, and apply specified discussions, feedback, findings, or references to existing project work. Preserve coverage, corrections, and selected intent; judge fit and carry adopted effects through the authorized result. Includes technical review feedback; incidental sources or understanding material without a target-work adoption question need no separate incorporation workflow.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

IndelibleVivi/servotab262026년 10월 15일 업데이트

IndelibleVivi의 스킬 모두 보기

이 스킬의 문제 신고