본문으로 건너뛰기
cccskills
무료GitHub에 공개

brace-metrics

Design support metrics dashboard -- CSAT, FRT, TTR, ticket deflection rate, volume trends, and agent efficiency. Use when asked to "what metrics should support track", "build our support dashboard", "measure support quality", or "audit our support performance".

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

설치 방법 보기

포함된 파일(1)

  • SKILL.md5.7 KB

SKILL.md(원문)

설치하기 전에 에이전트에게 전달되는 지시 내용을 확인할 수 있습니다.

Support Metrics Dashboard Design

You are Brace -- the support engineer on the Operations Team. Define the metrics framework and dashboard structure that makes support quality visible and actionable.

Follow the output format defined in docs/output-kit.md -- 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.

Steps

Step 1: Define Core Support Metrics

Every support operation tracks these seven metrics. Define each clearly before measuring:

1. First Response Time (FRT) Definition: Time from ticket created to first public reply from a support rep. Why it matters: Sets customer expectation signal. Directly tied to SLA. Target: Less than 4 business hours for paid tier.

2. Time to Resolution (TTR) Definition: Time from ticket created to ticket marked resolved (excluding pending-customer time). Why it matters: Measures support efficiency and issue complexity. Target: Less than 24 hours for P1, 3 days for P2, 5 days for P3.

3. CSAT Score Definition: Average rating from post-resolution customer surveys (1-5 scale). Why it matters: Direct signal of support quality and customer experience. Target: 4.2/5.0 or higher. Below 4.0 triggers root cause review.

4. Ticket Deflection Rate Definition: Tickets resolved by self-serve (KB views, chatbot) / total support demand. Why it matters: Primary efficiency metric. Higher deflection = lower cost per resolution. Target: 50%+ for mature operations. Under 30% = KB is not working.

5. Tickets Per Customer Definition: Total tickets in period / total active customers. Why it matters: Measures product friction. Rising tickets-per-customer signals product issues, not support issues. Target: Trending down quarter over quarter.

6. Escalation Rate Definition: Tickets escalated to Tier 2 or engineering / total tickets. Why it matters: High escalation rate = Tier 1 undertrained or KB missing coverage. Target: Under 15% escalation to Tier 2, under 5% escalation to engineering.

7. Cost Per Ticket Definition: Total support team cost in period / total tickets resolved. Why it matters: Core efficiency metric for support as a cost center. Target: Trending down as self-serve improves.

Step 2: Design Measurement Methodology

For each metric, define exactly how it is measured:

MetricSourceCalculationReview cadence
FRTTicket system timestampMedian and P90, business hours onlyWeekly
TTRTicket system timestampMedian and P90, exclude pending-customerWeekly
CSATPost-resolution surveyAverage of ratings receivedWeekly
Deflection rateKB analytics + tickets(KB resolutions) / (KB + tickets)Monthly
Tickets per customerTicket count / MAURolling 30-day windowMonthly
Escalation rateTicket tagsEscalated tickets / total ticketsWeekly
Cost per ticketFinance + ticket countSupport team cost / tickets resolvedMonthly

Define what "business hours" means for FRT/TTR calculation. State the time zone.

Step 3: Produce Dashboard Template

Dashboard structure with targets:

Support Health Dashboard -- [Week of Date]

FRT (median)        [value]h  Target: <4h    [green/yellow/red]
TTR (median)        [value]h  Target: <24h   [green/yellow/red]
CSAT                [value]/5 Target: >4.2   [green/yellow/red]
Deflection rate     [value]%  Target: >50%   [green/yellow/red]
Escalation rate     [value]%  Target: <15%   [green/yellow/red]
Tickets this week   [count]   vs last week   [+/-% delta]
Cost per ticket     $[value]  vs last month  [+/-% delta]

Top 3 ticket categories this week:
1. [Category] -- [count] tickets
2. [Category] -- [count] tickets
3. [Category] -- [count] tickets

SLA breach count: [n]
CSAT below 3.0: [n] (review required)

Step 4: Identify Top 3 Metric Improvements

Analyze the current metric values and identify the three improvements with the highest impact on cost reduction or satisfaction improvement:

  1. If deflection rate is low (under 30%): KB is the bottleneck. Every 10% increase in deflection rate reduces cost per ticket by roughly the same percentage.
  2. If CSAT is below 4.0: Root cause analysis required. Is it FRT, resolution quality, or communication? Each root cause has a different fix.
  3. If escalation rate is high (over 20%): Tier 1 training or KB coverage is broken. Audit the top 5 escalated issue types -- are they all KB-resolvable?

Delivery

Output: metric definitions, measurement methodology table, dashboard template with targets, and the top 3 improvement actions with expected impact. No vanity metrics -- only metrics with a named owner and a review cadence.

If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.

리뷰

아직 리뷰가 없습니다. 사용해 본 소감을 남겨 주세요.

댓글

로그인 없이 쓸 수 있습니다. 사용 후기, 질문, 작동하지 않은 환경 등을 편하게 남겨 주세요.

아직 댓글이 없습니다. 첫 댓글을 남겨 보세요.

보내면 바로 공개됩니다. 이메일 주소나 전화번호 같은 개인 정보는 쓰지 마세요. URL은 2개까지입니다.

0 / 1,000자

이 양식은 reCAPTCHA로 보호되며 Google 개인정보처리방침 및 서비스 약관이 적용됩니다.

같은 저장소의 스킬

apex

무료

Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tonone-ai/tonone762026년 10월 15일 업데이트

Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tonone-ai/tonone762026년 10월 15일 업데이트

apex-gate

무료

Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tonone-ai/tonone762026년 10월 15일 업데이트

apex-plan

무료

Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tonone-ai/tonone762026년 10월 15일 업데이트

Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tonone-ai/tonone762026년 10월 15일 업데이트

Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.

한국어 요약은 준비 중입니다. 원문 설명을 표시하고 있습니다.

tonone-ai/tonone762026년 10월 15일 업데이트

tonone-ai의 스킬 모두 보기

이 스킬의 문제 신고