Use this skill when building, reviewing, or refreshing a RACI (Responsible / Accountable / Consulted / Informed) matrix for a Salesforce project so that every Salesforce-specific decision — data model change, automation tier choice, security model, integration boundary, deployment, license/edition — has exactly one accountable owner and a documented escalation path that downstream agents can route to. Trigger keywords: RACI matrix salesforce project, stakeholder authority salesforce, escalation path salesforce decisions, who approves data model change, salesforce decision rights, REFUSAL_NEEDS_HUMAN_REVIEW routing. NOT for the change advisory board operating model itself (use admin/change-management-and-deployment). NOT for end-user training rollout plans (use admin/change-management-and-training). NOT for the technical mechanics of permission set assignment authority (use admin/permission-set-architecture). NOT for pure stakeholder requirements elicitation (use admin/requirements-gathering-for-sf). More trigger keywords: who approves a sandbox refresh, who signs off a data load, release update activation owner, delegated admin authority vs RACI, multi-org decision rights, escalation time-box.

インストール方法を見る

含まれるファイル(9)

  • SKILL.md29.6 KB
  • references/examples.md12.1 KB
  • references/gotchas.md16.8 KB
  • references/llm-anti-patterns.md7.6 KB
  • references/well-architected.md8.4 KB
  • references/worked-examples.md27.8 KB
  • scripts/check_raci.py20.9 KB
  • templates/raci-matrix.md11.8 KB
  • templates/stakeholder-raci-for-sf-projects-template.md3.9 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

Stakeholder RACI for Salesforce Projects

This skill activates when a Business Analyst, project manager, or admin lead needs a deterministic method for assigning decision authority on a Salesforce project — and a routing table that the repository's runtime agents can use when they emit REFUSAL_NEEDS_HUMAN_REVIEW. The output is a RACI matrix tailored to the Salesforce decision surface (data model, automation tier, security, integration, deployment, licensing) with explicit escalation rules per accountable cell.


Before Starting

Gather this context before drafting the matrix:

  • Phase and version-lock cadence. A RACI for discovery is not the RACI for build, and neither is the RACI for hypercare. The matrix must be version-locked per phase or it becomes stale within weeks. Confirm the phase you are modelling and the next planned re-review date.
  • Named individuals vs. roles. Salesforce projects fail when "the architect" or "the admin" is a placeholder — a single physical person must carry the A. Confirm whether the project is staffed enough that every stakeholder role on the canonical list maps to a named person; if not, surface the gap rather than papering over it.
  • Customer vs. partner ownership boundary. On consulting-led implementations, the most damaging RACI mistake is leaving A-cells with the systems integrator after go-live. Establish up front which A-cells transfer to the customer at hypercare and document the transfer date.
  • Regulatory overlay. HIPAA, FINRA, PCI, GDPR, SOX each impose a non-negotiable A on a compliance officer for specific decisions (PHI access, trade record retention, cardholder data, data subject rights, financial reporting controls). The compliance officer's A is not negotiable, even if a sponsor wants to push it elsewhere.
  • Existing CAB. If the org has a change advisory board, the CAB is typically C (consulted) on deployment decisions and may hold A on production deploys for high-blast-radius changes. Capture its cadence and quorum rules — RACI escalations that miss CAB cadence stall.

Questions to Ask Before Configuring

Ask these before drafting a single cell. Each one exists because a specific failure recurs — the matching gotcha is named in the last column so you can see what the answer is protecting you from.

AskWhy it mattersWhat a good answer adds
"Who loses something when the sandbox is refreshed, and who schedules it?"A refresh replaces the org; the person who runs it is rarely the person whose UAT evidence or seeded data disappearsSeparate A (data owner) and R (release manager) on the refresh row, with a blocking trigger — gotchas.md §9
"Who signs off a data load — the person who runs the tool, or the person who owns the records?"Hard-deleted records cannot be recovered from the Recycle Bin, and a failed bulk job leaves a partial state someone must adjudicateAn A on the data owner and an escalation trigger on hard delete and row-count overrun — gotchas.md §13
"Who decides when we activate a Release Update, and against which enforcement release?"Release Updates carry an availability release and an enforcement release; unowned, the platform activates on its dateA release-update row with A on the release manager and a time-box measured in releases — gotchas.md §12
"Which delegate groups exist today, and do they match what this matrix says about permissions?"Delegated administration is the decision-rights model made deployable — the org grants what the metadata says, not what the deck saysA retrieve-and-diff step at each phase review — gotchas.md §14
"Is 'the Salesforce admin' one column or several roles one person happens to fill?"One column means one bottleneck and no successor; the platform itself splits admin authorityA register that records the double-hatting instead of merging the columns — gotchas.md §10
"Which running integrations does this org already have, and who owns each one?"API allocations and concurrency limits are org-wide and shared; an unlisted integration can fail your rehearsed loadNamed owners for existing integrations as C on the integration row — gotchas.md §11
"If this is a multi-org programme, does each role mean the same person in every org?"Roles, delegate groups, and release managers are org-scoped; one column hides two different authoritiesOrg-scoped columns (RM_A, RM_B) and a steerco A on cross-org decisions — gotchas.md §15

What a proper matrix adds over just naming an owner per workstream: every irreversible Salesforce action — refresh, load, hotfix, release-update activation — has exactly one named person who can authorise it, a clock that fires when they do not, and a decision log an auditor can read a year later.


Core Concepts

The Salesforce Decision Surface

A generic project RACI lists deliverables. A Salesforce RACI lists decisions — because a Salesforce build is a stack of irreversible-or-expensive-to-reverse decisions, not a stack of artifacts. The canonical decision categories every Salesforce RACI must cover:

  1. Data model change — adding/changing/deleting standard or custom objects, fields, relationships, record types, or external IDs. A decision here ripples through reports, integrations, and security.
  2. Automation tier — picking Flow vs. Apex vs. Agentforce vs. Approvals vs. Platform Events for a given requirement (see standards/decision-trees/automation-selection.md).
  3. Security model — OWD, role hierarchy, sharing rules, profiles, permission sets, permission set groups, restriction rules, and field-level security (see standards/decision-trees/sharing-selection.md).
  4. Integration boundary — REST vs. Bulk vs. Platform Events vs. CDC vs. Pub/Sub vs. Salesforce Connect vs. MuleSoft (see standards/decision-trees/integration-pattern-selection.md), plus the contract with the source/target system.
  5. Deployment — what gets promoted, when, with what backout plan, and through which sandboxes (see admin/sandbox-strategy).
  6. License + edition — which user license, which add-on (Service Cloud, Sales Cloud, Agentforce, CPQ, OmniStudio, Experience Cloud), edition tier, and feature license assignment.

Every row in the matrix is one of these categories — or a sub-row scoped to a specific object, integration, or release. Resist adding deliverable rows ("build the Account page layout") — those belong in a work-breakdown structure, not a RACI.

The Ten Required Activity Rows

The six categories above are how you think about the surface. The rows you actually write are the ten activities below — the ones that are irreversible, expensive to reverse, or driven by a date Salesforce sets rather than one you set. scripts/check_raci.py requires every slug to appear at least once; a missing slug is an error, because a required decision with no row is a decision with no owner.

Activity slugCategoryTypical AExecuted by
data-model-changeData modelData steward or process owneragents/object-designer/AGENT.md, agents/field-impact-analyzer/AGENT.md
sharing-model-changeSecuritySecurity architectagents/access-path-explainer/AGENT.md
permission-set-changeSecurityCRM admin leadagents/permission-set-architect/AGENT.md
integration-changeIntegrationIntegration architectagents/integration-catalog-builder/AGENT.md
release-go-no-goDeploymentBusiness sponsoragents/release-readiness-reviewer/AGENT.md
sandbox-refresh-approvalDeploymentData owner (not the refresher)agents/sandbox-strategy-designer/AGENT.md
production-hotfixDeploymentRelease manageragents/deployment-risk-scorer/AGENT.md, agents/changeset-builder/AGENT.md
data-load-approvalData modelData stewardagents/data-loader-pre-flight/AGENT.md, agents/data-migration-reconciler/AGENT.md
release-update-activationDeploymentRelease manageragents/change-impact-planner/AGENT.md, agents/org-health-assessor-v2/AGENT.md
seasonal-release-previewDeploymentRelease manageragents/release-train-planner/AGENT.md

Sub-rows share a slug: a regulated programme writes two data-model-change rows (regulated data and everything else) with different As. The automation-tier and license/edition categories stay as optional extra rows — they are decisions, but they are reversible, so they do not carry the same "nobody owns this and the platform is about to act" risk the ten do. A filled version of all ten, with escalation rules and the executing agent per row, is in references/worked-examples.md.

The Canonical Salesforce Stakeholder Roster

The matrix columns come from a fixed roster:

RoleTypical titleOwns A onOwns C on
Business sponsorVP Sales / VP Service / CFO / CIOScope, budget, go/no-go gateAlmost everything else
Process ownerDirector of the affected business functionBusiness process changes, UAT sign-offData model changes that affect their process
Data stewardMDM lead / data governance leadData model changes, picklist values, dedupe rules, retentionReports, integrations
Security architectInfoSec / IAM leadSecurity model, profile/PSG architecture, sharingIntegrations, data model with PII
Integration architectEnterprise architect / iPaaS leadIntegration boundary + contractData model, security
CRM admin leadSalesforce admin / lead BADay-to-day config, declarative automationAll technical decisions
Release managerDevOps / release engineerDeployment, sandbox strategy, environment hygieneAutomation tier when it affects packaging
AppExchange ownerThe internal sponsor of any installed managed packageDecisions touching the package's namespaceData model, security
Compliance officerPrivacy / risk / compliance leadRegulatory controls, audit trail, retentionData model, security, integrations
End-user representativePower user from the affected teamUAT, adoption, training feedbackProcess changes

Keep architects split across Security architect and Integration architect — collapsing them into a single "Architecture" role is one of the most common RACI mistakes on Salesforce projects.

R / A / C / I — and the One-A Rule

LetterMeaning
R (Responsible)Does the work. There can be many Rs per row.
A (Accountable)Owns the outcome and is the single decision-maker. Exactly one A per row. This is the load-bearing rule of any RACI; multiple As mean nobody is accountable.
C (Consulted)Two-way conversation before the decision is made. Their input is required, not optional.
I (Informed)One-way notification after the decision is made.

Additional rules specific to Salesforce projects:

  • No A on a Consulted role. If someone is C, they cannot also be A — that contradicts the one-A rule.
  • Every row must have at least one R. A row with only A/C/I means the work is unowned.
  • An advisory body (CAB, steerco, design authority) is C, never A. They review; the named accountable person decides.
  • The data steward is C at minimum on every data model row, even when a process owner holds A.

Escalation Rules: The "When Does This Go Up?" Question

A RACI without escalation rules is a wall poster. For every A-cell, document:

  • Trigger — what condition forces escalation (e.g., A and C disagree, time-box exceeded, blast radius exceeds threshold).
  • Target — who the next-level decision-maker is (typically the sponsor or steerco).
  • Time-box — how long the A has to decide before escalation auto-fires (e.g., "data model change pending >5 business days escalates to sponsor").

Escalation rules without a time-box silently rot — the project blocks but no alarm trips.

Mapping RACI to Agent Refusal Codes

The repository's runtime agents emit refusal codes from agents/_shared/REFUSAL_CODES.md when they hit a condition that explicitly requires human judgment. The RACI is the routing table that converts a refusal code into a named person.

Canonical mapping:

Refusal codeDecision category in RACIWho the BA pings (the A)
REFUSAL_NEEDS_HUMAN_REVIEWThe category named in the refusal messageThe A on the matching row
REFUSAL_INPUT_AMBIGUOUSWhichever category the input concernsThe A on that row
REFUSAL_SECURITY_GUARDSecurity modelSecurity architect
REFUSAL_POLICY_MISMATCHWhichever decision category the policy spansThe A on that row + sponsor (informed)
REFUSAL_MANAGED_PACKAGELicense + edition (managed package scope)AppExchange owner
REFUSAL_COMPETING_ARTIFACTData model or automation tier (depends on artifact)The A on the matching row
REFUSAL_DATA_QUALITY_UNSAFEData modelData steward
REFUSAL_FEATURE_DISABLEDLicense + editionBusiness sponsor (cost) + CRM admin lead (enablement)

Every BA / admin runtime agent's escalation step should look up the refusal code, find the row, and ping the A — with the C on the same row in the loop.


Common Patterns

Pattern: Greenfield Sales Cloud RACI

When to use: First Salesforce implementation, single-org, no managed packages, single-region.

How it works: Sponsor (CRO) holds A on scope and license. Process owner (VP Sales Ops) holds A on data model and automation tier. Security architect holds A on security. Integration architect holds A on the one or two inbound feeds. CRM admin lead holds A on day-to-day config. Compliance officer is C on data model and security; not on the critical path.

Why not the alternative: Rolling A on the data model into the sponsor in a greenfield is tempting but wrong — sponsors do not have time to decide on every field, and the data steward / process owner is closer to the data semantics.

Pattern: Regulated Industry RACI (HIPAA / FINRA / PCI)

When to use: Health Cloud, Financial Services Cloud, payment-card-handling, or any project where audit findings could be material.

How it works: Compliance officer holds A on retention, audit trail, and any decision touching regulated data. Security architect holds A on FLS and sharing for regulated objects. Data steward is C on every row touching regulated data and may hold A on data classification. Sponsor's A on scope must include explicit acceptance that the compliance officer can veto a feature.

Why not the alternative: Treating compliance as C on regulated data lets the project ship with a control gap — and the audit catches it six months later. Compliance gets A on the controls; the process owner still owns the business outcome.

Pattern: M&A Multi-Org RACI

When to use: Two or more existing Salesforce orgs being merged or federated post-acquisition.

How it works: Two business sponsors (one per legacy org) reporting to a combined steerco; the steerco holds A on org-strategy decisions (merge vs. federate vs. coexist). Each org keeps its own CRM admin lead and process owner with split A on day-to-day decisions. Integration architect holds A on the cross-org integration pattern. A new "data steward (master)" role emerges to hold A on the master data model post-merger.

Why not the alternative: Naming a single sponsor too early in an M&A causes one side's stakeholders to disengage. The split-A pattern is uncomfortable but mirrors the actual organizational state until the merger is complete.


Decision Guidance

SituationRecommended ApproachReason
Sponsor wants A on every rowPush back; sponsor holds A on scope/budget/go-no-go onlySponsors cannot decide field-by-field; A loses meaning if everywhere
No data steward exists in the orgSurface as a project risk, not a config; ask sponsor to name oneData model decisions without a steward become technical debt within months
Architecture is a single roleSplit into security architect and integration architectSalesforce architecture decisions span domains; one head cannot hold A on both
Implementation partner is A on production deployTransfer A to internal release manager before hypercare endsPartners leave; A must live with the customer permanently
AppExchange package is in scopeAdd AppExchange owner as a column; A on namespace-touching decisionsManaged-package namespace constraints are not negotiable
Compliance is C on every regulated rowPromote compliance to A on the regulatory control rowsC is not enough for audit-grade decisions
Escalation rule has no time-boxAdd one (typically 3–5 business days)Escalations without a clock silently stall projects
Agent emits REFUSAL_NEEDS_HUMAN_REVIEWLook up the decision category in the refusal map; ping the AThis is the runtime use of the matrix

Recommended Workflow

  1. Fill the intake sheet and build the register. Copy templates/stakeholder-raci-for-sf-projects-template.md; record phase, org topology, regulatory overlay, managed packages, delegate groups already in the org, and the partner's hypercare exit date, working the ## Questions to Ask Before Configuring table into it. Then name a person for every roster role with org unit, Salesforce persona, user licence, and decision rights — the six columns in references/worked-examples.md §1. An unnamed role is a project risk to escalate, not a placeholder to fill later.
  2. Write the ten activity rows. Copy templates/raci-matrix.md, keep the ten required slugs, and add sub-rows only where a category needs splitting. Apply the one-A rule, the no-A-on-a-C rule, and the every-row-has-an-R rule as you fill cells.
  3. Attach an escalation rule to every A, and an escalation path to the programme. Trigger, target, time-box per row; level, forum, chair, time-box per escalation level. references/gotchas.md §4 is why the time-box is not optional.
  4. Map each R to its executor. Fill executed_by with the repo path of the agent, skill, or decision tree that carries out the row — see the table in ## Core Concepts and references/worked-examples.md §5.
  5. Lint the artefact. Run python3 scripts/check_raci.py --file <path>/raci.yaml --repo-root <repo> --strict. Errors are structural (missing A, missing R, missing required activity, missing escalation, unresolved executed_by); fix them before circulating. Warnings are judgement calls — read them, then decide.
  6. Reconcile the matrix against the org. Retrieve the delegate groups and diff them against the permission row (references/worked-examples.md §6). A difference is a decision made outside the governance path.
  7. Review, version-lock, log. Capture the sponsor sign-off date, the next review date, and the phase in the artefact header. Record decisions as they are made in the decision_log shape — the next phase gets a new version, not an in-place edit.

Review Checklist

Run through these before publishing the matrix:

  • All ten required activity slugs have a row (check_raci.py errors on a missing one)
  • Every row has exactly one A
  • No row has A on a C role
  • Every row has at least one R
  • Every R/A/C/I value is from the enum (R, A, C, I) — no blanks, no commentary
  • Every A cell has a written escalation rule with trigger + target + time-box
  • The escalation target on each row is someone other than that row's A
  • A programme-level escalation_path exists with level, forum, chair, and time-box per level
  • Every executed_by path resolves to a real agent, skill, or decision tree in the repo
  • Delegate groups in the org have been retrieved and diffed against the permission row
  • Every refusal code in agents/_shared/REFUSAL_CODES.md that requires human review resolves to a named A
  • No A is held by the implementation partner past the planned hypercare exit date
  • Compliance officer holds A (not just C) on regulatory-control rows for HIPAA/FINRA/PCI/GDPR/SOX projects
  • Data steward is at minimum C on every data-model row
  • Architecture is split into security and integration columns — not collapsed
  • Phase and version are stamped on the matrix
  • Sponsor + steerco review date is captured, next review date is scheduled

Salesforce-Specific Gotchas

Non-obvious project-governance behaviors that cause real production problems:

  1. A migrated to the consulting partner and never transferred back. During implementation the SI's lead architect carries A on integration and security because they own the design. If A does not transfer to a named customer employee before hypercare ends, the customer has no decision-maker post-go-live and every change request blocks until a partner is re-engaged.

  2. Compliance officer demoted to C on regulated data. Project teams find compliance's review cycle slow and quietly leave them as C. The system ships, audit fires, and the gap forces a remediation project that costs more than the original build.

  3. Single-sponsor RACI on an M&A. Naming one sponsor too early disenfranchises the other org's stakeholders. They disengage from steerco, requirements drift, and the merger fails to consolidate. Use a steerco-as-A pattern until the legal merger closes.

  4. AppExchange owner missing from the matrix. Decisions touching a managed-package namespace (Conga, DocuSign, CPQ, FSL, NPSP) require the package owner's input — they know what the next package release will break. Omitting them produces decisions that get reversed by the next package upgrade.

  5. Escalation paths without time-boxes. "Escalate to sponsor if blocked" with no clock means the team waits indefinitely for the A to decide. A 3–5 business-day time-box should be the default, with shorter for security and longer for license-tier decisions.

Seven more — the sandbox refresh approved by someone who does not own the data in it, "the Salesforce admin" as A for everything, integrations whose owners are outside the matrix, release-update activation owned by nobody, the data load signed off by the tool operator instead of the record owner, delegate groups that contradict the permission row, and one role meaning two different people in a multi-org programme — are in references/gotchas.md §9–§15, each with the platform behaviour that makes it bite.


Output Artifacts

ArtifactDescription
Stakeholder registerOne row per role: named person, org unit, Salesforce persona, user licence, decision rights
RACI matrix (markdown)The circulated view — one row per activity, one column per stakeholder role; cells contain R/A/C/I
RACI matrix (YAML)The artefact of record, linted by scripts/check_raci.py. JSON with the same keys is accepted
Escalation rules + escalation pathPer-row trigger / target / time-box, plus programme-level levels, forums, chairs
R-to-executor mapexecuted_by per row: the agent, skill, or decision tree that carries out the work
Refusal-code-to-stakeholder mapMapping from REFUSAL_* codes to the named A who should be paged
Decision logPer decision: date, activity, decision, decided by, consulted, alternatives rejected, reversal cost, evidence
Review logSponsor / steerco review date, attendees, version stamp, next review date

Reference Files

FileRead it when
references/worked-examples.mdYou need the filled artefacts — register, ten-row matrix in markdown and YAML, escalation path, decision log, R-to-executor map, and the DelegateGroup / CustomMetadata XML that makes the matrix deployable
references/examples.mdYou need a matrix shaped for a specific programme type — greenfield, regulated (HIPAA), or M&A multi-org — or the sponsor-as-universal-A anti-pattern with the linter output
references/gotchas.mdBefore publishing, and any time a cell feels obvious — 15 failure modes with what happens / when it occurs / how to avoid
references/well-architected.mdYou are justifying the matrix to an architecture review, or need the pillar mapping and the source list
references/llm-anti-patterns.mdAn AI assistant is generating or reviewing the matrix — the seven ways it goes wrong
scripts/check_raci.pyEvery time the artefact changes: --file <raci.yaml> --repo-root <repo> --strict
templates/raci-matrix.mdYou are producing the deliverable — the matrix, escalation, refusal map, and YAML shape to fill
templates/stakeholder-raci-for-sf-projects-template.mdYou are starting an engagement — the intake sheet that captures context before any cell is filled

Related Skills

  • admin/requirements-gathering-for-sf — use first, to identify the stakeholders before assigning their authority
  • admin/change-management-and-deployment — covers the CAB operating model that the RACI references
  • admin/change-management-and-training — covers end-user adoption, which is downstream of the RACI
  • admin/permission-set-architecture — covers the technical authority model for permission set assignment
  • admin/delegated-administration — the permission row made concrete: the delegate group that either matches this matrix or contradicts it
  • devops/release-management — the release train the go/no-go, hotfix, release-update, and preview rows sit inside
  • admin/sandbox-strategy — feeds the deployment-row decisions on which sandboxes a change traverses
  • standards/decision-trees/automation-selection.md — the tree the automation-tier A cell consults
  • standards/decision-trees/sharing-selection.md — the tree the security-model A cell consults
  • standards/decision-trees/integration-pattern-selection.md — the tree the integration-boundary A cell consults
  • agents/_shared/REFUSAL_CODES.md — the refusal-code enum the matrix maps to
  • agents/_shared/AGENT_CONTRACT.md — why an agent's Citations block and confidence score are usable as decision-log evidence
  • agents/org-health-assessor-v2/AGENT.md — reports the pending release updates and org-level findings the matrix must assign owners to
  • agents/release-readiness-reviewer/AGENT.md — produces the evidence the go/no-go A signs

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Use this skill when writing test-first, behavior-driven acceptance criteria in Given/When/Then format for a Salesforce user story. Covers happy path, edge cases, negative paths, permission boundaries, and data-state preconditions so the AC block can drive UAT scripts and Apex test design downstream. Trigger keywords: given when then, gherkin, behavior driven AC, test first acceptance criteria, scenario outline, BDD acceptance criteria. NOT for the user-story format itself (use admin/user-story-writing-for-salesforce). NOT for UAT script writing (use admin/uat-test-case-design). NOT for Apex test method generation (use agents/test-class-generator). NOT for high-level UAT planning (use admin/uat-and-acceptance-criteria). More triggers: acceptance criteria record, ac_id, req_id on a criterion, artefact under test, negative case for a rule-type requirement, no-match fall-through criterion, oracle for a Then clause, test type apex flow manual, criteria linter, check_ac_format.py, --manifest-dir.

日本語の概要は準備中です。原文の説明を表示しています。

PranavNagrecha/AwesomeSalesforceSkills192026年10月4日 更新

Task and Event objects: polymorphic WhatId/WhoId, Activity object model, ActivityHistory vs OpenActivity, activity timeline customization, bulk task creation, Einstein Activity Capture boundaries. NOT for turning on EAC or calendar sync — use admin/einstein-activity-capture-setup. NOT for Email-to-Case — use admin/case-management-setup. Covers ActivitiesSettings metadata, enableActivities, shared Task/Event custom fields and FLS, TaskStatus value sets, Shared Activities and TaskRelation/EventRelation, recurring and child activities, and partial-success bulk DML on Task.

日本語の概要は準備中です。原文の説明を表示しています。

PranavNagrecha/AwesomeSalesforceSkills192026年10月4日 更新

Design Invocable Apex actions that return deterministic, agent-friendly errors instead of surfacing raw exceptions to the LLM. NOT for authoring the action itself — @InvocableMethod schema, labels, security context — use agentforce/custom-agent-actions-apex. NOT for the Apex tests that force each error branch — use agentforce/agent-action-unit-tests.

日本語の概要は準備中です。原文の説明を表示しています。

PranavNagrecha/AwesomeSalesforceSkills192026年10月4日 更新

Use when designing how an Agentforce agent extracts structured input parameters (slots) from a user's natural-language utterance to invoke an action. Triggers: 'agent extract date from user', 'agent action argument extraction', 'agentforce slot filling', 'agent invocable input mapping', 'agent fails to fill required parameter'. NOT for action authoring (use agentforce/agent-actions) or for prompt-template variable binding (use agentforce/prompt-builder-templates).

日本語の概要は準備中です。原文の説明を表示しています。

PranavNagrecha/AwesomeSalesforceSkills192026年10月4日 更新

Apex test patterns for @InvocableMethod agent actions: per-reason-code branch coverage, bulk safety, callout mocking, deterministic assertions. NOT for testing whether the agent routes to the right topic or answers well — use agentforce/agent-testing-and-evaluation. NOT for designing the error envelope the tests assert on — use agentforce/agent-action-error-handling.

日本語の概要は準備中です。原文の説明を表示しています。

PranavNagrecha/AwesomeSalesforceSkills192026年10月4日 更新

Designing or reviewing Agentforce actions: Flow actions, Apex invocable actions, prompt-template actions, action naming, input and output contracts, confirmation requirements, and safe error behavior. Triggers: 'agent actions', 'build an agent that can look up an order', 'make the agent able to check order status', 'give the agent a capability', 'agent that can retrieve a record', 'flow action for agent', 'agent invocable action', 'action schema design'. NOT for writing the Apex class itself — use agentforce/custom-agent-actions-apex. NOT for the reason_code error envelope that stops an agent retry loop — use agentforce/agent-action-error-handling.