23-category product-building OS. CF Workers+Hono, React 19+Vite / Angular 22+Spartan, D1, Drizzle, Clerk, Square/Stripe. 149 reference docs, 28 agents.
中文简介正在准备中。当前显示原文说明。
编码规范、框架、重构、代码审查(1.8万 个)
23-category product-building OS. CF Workers+Hono, React 19+Vite / Angular 22+Spartan, D1, Drizzle, Clerk, Square/Stripe. 149 reference docs, 28 agents.
中文简介正在准备中。当前显示原文说明。
Study unfamiliar codebases and produce evidence-backed knowledge artifacts. Use for repository orientation, architecture mapping, subsystem tracing, onboarding, or codebase documentation.
中文简介正在准备中。当前显示原文说明。
Frappe backend guidance for Python and backend-adjacent JavaScript surfaces such as client interaction patterns, hooks, APIs, patches, scheduler logic, reports, and server-side review. Use when implementing or reviewing Frappe backend behavior.
中文简介正在准备中。当前显示原文说明。
Frappe frontend guidance for Vue and React, including desk pages, `www` pages, `frappe-ui`, Doppio-style frontends, client scripts, and external SPA integrations. Use when building or reviewing Frappe UI work.
中文简介正在准备中。当前显示原文说明。
Use for local Granola archive search, sync freshness, notes/transcripts/panels, Markdown export, snapshots, Keychain-safe source debugging, and Graincrawl repo/release work.
中文简介正在准备中。当前显示原文说明。
Investigate and fix bugs, failing tests, regressions, build failures, or unexpected behavior using boundary localization, evidence, and bounded hypotheses.
中文简介正在准备中。当前显示原文说明。
Choose, reuse, restore, park, or clean up Git workspaces while preserving work and host ownership. Create isolation only when it resolves a real conflict; inspection does not authorize creation or deletion.
中文简介正在准备中。当前显示原文说明。
Preserve an approved specification through a complete implementation plan and execution. Use for major refactors, migrations, or multi-session work when a confirmed spec is authoritative; keep scope and order changes explicit.
中文简介正在准备中。当前显示原文说明。
Finish a development change safely by inspecting the final tree, verifying at the right scope, and performing only the requested Git or PR actions.
中文简介正在准备中。当前显示原文说明。
Build structured vendor/tool evaluation matrices with weighted scoring, TCO analysis, and recommendation memos. Covers criteria definition, deal-breaker identification, and negotiation points. Use when selecting SaaS tools, evaluating technology vendors, or making build-vs-buy decisions.
中文简介正在准备中。当前显示原文说明。
Reference implementation of a v2 CodexKit skill. Copy this folder as a starting point for new skills. Demonstrates all 10 required sections, 4C verification, and the tier-2 folder structure.
中文简介正在准备中。当前显示原文说明。
Facilitate and document Sprint Retrospectives per Scrum Guide 2020. Choose format by team maturity, structure the session, capture action items, and track improvement across sprints. Use after every sprint. Do not use for individual performance reviews, blame sessions, or annual assessments.
中文简介正在准备中。当前显示原文说明。
Map existing business processes using BPMN 2.0 notation or simplified swimlane diagrams. Identify waste, handoffs, decision points, and improvement opportunities using Lean principles (8 Wastes). Use when documenting workflows for SOP creation, automation assessment, or process improvement. Do not use for software architecture diagrams — use architecture tools instead.
中文简介正在准备中。当前显示原文说明。
Draft standard operating procedures with scope, roles, steps, controls, exceptions, and review cadence. Use when a recurring business process needs clear repeatable instructions.
中文简介正在准备中。当前显示原文说明。
Analyze survey and feedback data with statistical distributions, cross-tabulations, significance testing, and open-ended theme extraction. Produces executive-ready survey reports with segment comparisons and action recommendations. Use when processing NPS, CSAT, employee engagement, or market research surveys.
中文简介正在准备中。当前显示原文说明。
Write structured Requests for Proposal (RFP) or Requests for Quotation (RFQ) aligned with ISO 20400 sustainable procurement principles. Cover scope, technical requirements, evaluation methodology, and commercial terms. Use when sourcing vendors, services, or equipment.
中文简介正在准备中。当前显示原文说明。
Build and maintain a Stakeholder Register per PMBOK 8 Stakeholder Performance Domain. Identify stakeholders, analyze using Power/Interest grid, plan engagement strategies, and define communication cadence. Use at project initiation and whenever stakeholder landscape changes.
中文简介正在准备中。当前显示原文说明。
Facilitate sprint planning by organizing backlog items, estimating effort, balancing capacity, identifying dependencies, and producing a sprint commitment summary. Use when teams need structured sprint planning output. Do not use for strategic roadmap planning, annual budgeting, or product vision work.
中文简介正在准备中。当前显示原文说明。
Write and cascade OKRs (Objectives and Key Results) for company, department, team, or project level. Ensure objectives are inspiring and key results are measurable outcomes. Includes weekly check-in template. Use at the start of each quarter or when aligning strategy to execution. Do not use for KPI performance reviews or daily task tracking.
中文简介正在准备中。当前显示原文说明。
Convert scattered progress notes, RAID changes, and milestone movement into a clean weekly or biweekly status update. Use when the work is routine status packaging or steering prep. Do not use for project governance design, root cause analysis, or deep portfolio risk assessment.
中文简介正在准备中。当前显示原文说明。
Create practical role-specific onboarding checklists with owners, timing, access needs, and first-week milestones. Use for new hire, contractor, client, or team onboarding.
中文简介正在准备中。当前显示原文说明。
Format recurring KPI snapshots, exception flags, and owner follow-ups for weekly operations reviews. Use when the work is routine packaging of operational metrics and exceptions. Do not use for root cause analysis, process redesign, or full performance diagnosis.
中文简介正在准备中。当前显示原文说明。
Conduct strategic analysis using Porter's Five Forces, PESTEL, and SWOT frameworks. Assess competitive dynamics, macro environment, and internal capabilities. Synthesize into strategic implications with ranked options. Use when entering new markets, evaluating competitive position, or strategic planning.
中文简介正在准备中。当前显示原文说明。
Calculate and interpret Earned Value Management (EVM) metrics per PMBOK 8 Measurement Performance Domain. Compute SPI, CPI, EAC, ETC, TCPI, and generate variance narratives with corrective action recommendations. Use during project execution to assess schedule and cost performance.
中文简介正在准备中。当前显示原文说明。