Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
中文简介正在准备中。当前显示原文说明。
Process and manage construction change orders. Track costs, approvals, and impact on schedule and budget.
中文简介正在准备中。当前显示原文说明。
安装前可以查看交给 AI 代理的指令内容。
Change orders cause project disruption:
Streamlined change order processing with cost analysis, approval workflow, and impact tracking.
import pandas as pd
from datetime import datetime, date, timedelta
from typing import Dict, Any, List, Optional
from dataclasses import dataclass, field
from enum import Enum
class ChangeOrderStatus(Enum):
"""Change order status."""
DRAFT = "draft"
PENDING_REVIEW = "pending_review"
PENDING_APPROVAL = "pending_approval"
APPROVED = "approved"
REJECTED = "rejected"
VOID = "void"
class ChangeType(Enum):
"""Type of change."""
OWNER_REQUESTED = "owner_requested"
DESIGN_CHANGE = "design_change"
FIELD_CONDITION = "field_condition"
CODE_COMPLIANCE = "code_compliance"
VALUE_ENGINEERING = "value_engineering"
ERROR_OMISSION = "error_omission"
class ImpactType(Enum):
"""Impact categories."""
COST_INCREASE = "cost_increase"
COST_DECREASE = "cost_decrease"
TIME_INCREASE = "time_increase"
TIME_DECREASE = "time_decrease"
NO_IMPACT = "no_impact"
@dataclass
class CostItem:
"""Change order cost item."""
description: str
quantity: float
unit: str
unit_cost: float
total_cost: float
category: str # labor, material, equipment, subcontractor
markup_percent: float = 0.0
@dataclass
class ApprovalRecord:
"""Approval workflow record."""
approver_name: str
approver_role: str
action: str # approved, rejected, returned
action_date: datetime
comments: str = ""
@dataclass
class ChangeOrder:
"""Change order record."""
co_number: str
title: str
description: str
change_type: ChangeType
status: ChangeOrderStatus
created_date: date
created_by: str
# Cost
cost_items: List[CostItem] = field(default_factory=list)
direct_cost: float = 0.0
overhead_cost: float = 0.0
profit_cost: float = 0.0
total_cost: float = 0.0
# Schedule
schedule_impact_days: int = 0
affected_activities: List[str] = field(default_factory=list)
# Workflow
approvals: List[ApprovalRecord] = field(default_factory=list)
approved_date: Optional[date] = None
approved_by: str = ""
# References
rfi_reference: str = ""
spec_section: str = ""
drawing_reference: str = ""
location: str = ""
def to_dict(self) -> Dict[str, Any]:
return {
'co_number': self.co_number,
'title': self.title,
'change_type': self.change_type.value,
'status': self.status.value,
'created_date': self.created_date.isoformat(),
'direct_cost': self.direct_cost,
'overhead_cost': self.overhead_cost,
'profit_cost': self.profit_cost,
'total_cost': self.total_cost,
'schedule_impact': self.schedule_impact_days,
'approved_date': self.approved_date.isoformat() if self.approved_date else None
}
class ChangeOrderProcessor:
"""Process and manage change orders."""
DEFAULT_OVERHEAD_RATE = 0.10
DEFAULT_PROFIT_RATE = 0.10
def __init__(self, project_name: str, original_contract: float,
overhead_rate: float = None, profit_rate: float = None):
self.project_name = project_name
self.original_contract = original_contract
self.overhead_rate = overhead_rate or self.DEFAULT_OVERHEAD_RATE
self.profit_rate = profit_rate or self.DEFAULT_PROFIT_RATE
self.change_orders: Dict[str, ChangeOrder] = {}
self._co_counter = 0
def create_change_order(self,
title: str,
description: str,
change_type: ChangeType,
created_by: str,
rfi_reference: str = "",
location: str = "") -> ChangeOrder:
"""Create new change order."""
self._co_counter += 1
co_number = f"CO-{self._co_counter:04d}"
co = ChangeOrder(
co_number=co_number,
title=title,
description=description,
change_type=change_type,
status=ChangeOrderStatus.DRAFT,
created_date=date.today(),
created_by=created_by,
rfi_reference=rfi_reference,
location=location
)
self.change_orders[co_number] = co
return co
def add_cost_item(self, co_number: str,
description: str,
quantity: float,
unit: str,
unit_cost: float,
category: str,
markup_percent: float = 0.0):
"""Add cost item to change order."""
if co_number not in self.change_orders:
raise ValueError(f"Change order {co_number} not found")
co = self.change_orders[co_number]
total = quantity * unit_cost * (1 + markup_percent)
item = CostItem(
description=description,
quantity=quantity,
unit=unit,
unit_cost=unit_cost,
total_cost=total,
category=category,
markup_percent=markup_percent
)
co.cost_items.append(item)
self._recalculate_totals(co)
def _recalculate_totals(self, co: ChangeOrder):
"""Recalculate change order totals."""
co.direct_cost = sum(item.total_cost for item in co.cost_items)
co.overhead_cost = co.direct_cost * self.overhead_rate
co.profit_cost = (co.direct_cost + co.overhead_cost) * self.profit_rate
co.total_cost = co.direct_cost + co.overhead_cost + co.profit_cost
def set_schedule_impact(self, co_number: str, days: int,
affected_activities: List[str] = None):
"""Set schedule impact."""
if co_number not in self.change_orders:
raise ValueError(f"Change order {co_number} not found")
co = self.change_orders[co_number]
co.schedule_impact_days = days
co.affected_activities = affected_activities or []
def submit_for_review(self, co_number: str):
"""Submit change order for review."""
if co_number not in self.change_orders:
raise ValueError(f"Change order {co_number} not found")
co = self.change_orders[co_number]
if co.status != ChangeOrderStatus.DRAFT:
raise ValueError("Can only submit draft change orders")
co.status = ChangeOrderStatus.PENDING_REVIEW
def submit_for_approval(self, co_number: str, reviewer: str, comments: str = ""):
"""Submit for approval after review."""
if co_number not in self.change_orders:
raise ValueError(f"Change order {co_number} not found")
co = self.change_orders[co_number]
if co.status != ChangeOrderStatus.PENDING_REVIEW:
raise ValueError("Must be in review status")
co.approvals.append(ApprovalRecord(
approver_name=reviewer,
approver_role="Reviewer",
action="reviewed",
action_date=datetime.now(),
comments=comments
))
co.status = ChangeOrderStatus.PENDING_APPROVAL
def approve_change_order(self, co_number: str, approver: str,
approver_role: str, comments: str = ""):
"""Approve change order."""
if co_number not in self.change_orders:
raise ValueError(f"Change order {co_number} not found")
co = self.change_orders[co_number]
co.approvals.append(ApprovalRecord(
approver_name=approver,
approver_role=approver_role,
action="approved",
action_date=datetime.now(),
comments=comments
))
co.status = ChangeOrderStatus.APPROVED
co.approved_date = date.today()
co.approved_by = approver
def reject_change_order(self, co_number: str, rejector: str,
reason: str):
"""Reject change order."""
if co_number not in self.change_orders:
raise ValueError(f"Change order {co_number} not found")
co = self.change_orders[co_number]
co.approvals.append(ApprovalRecord(
approver_name=rejector,
approver_role="Approver",
action="rejected",
action_date=datetime.now(),
comments=reason
))
co.status = ChangeOrderStatus.REJECTED
def get_summary(self) -> Dict[str, Any]:
"""Generate change order summary."""
cos = list(self.change_orders.values())
by_status = {}
by_type = {}
total_approved = 0
total_pending = 0
total_schedule_impact = 0
for co in cos:
# By status
status = co.status.value
by_status[status] = by_status.get(status, 0) + 1
# By type
change_type = co.change_type.value
by_type[change_type] = by_type.get(change_type, 0) + co.total_cost
# Totals
if co.status == ChangeOrderStatus.APPROVED:
total_approved += co.total_cost
total_schedule_impact += co.schedule_impact_days
elif co.status in [ChangeOrderStatus.PENDING_REVIEW, ChangeOrderStatus.PENDING_APPROVAL]:
total_pending += co.total_cost
current_contract = self.original_contract + total_approved
return {
'project': self.project_name,
'original_contract': self.original_contract,
'approved_changes': total_approved,
'current_contract': current_contract,
'pending_changes': total_pending,
'potential_contract': current_contract + total_pending,
'total_change_orders': len(cos),
'by_status': by_status,
'by_type': by_type,
'total_schedule_impact_days': total_schedule_impact,
'change_percent': round(total_approved / self.original_contract * 100, 1) if self.original_contract > 0 else 0
}
def get_pending_approvals(self) -> List[ChangeOrder]:
"""Get change orders pending approval."""
return [co for co in self.change_orders.values()
if co.status in [ChangeOrderStatus.PENDING_REVIEW, ChangeOrderStatus.PENDING_APPROVAL]]
def export_log(self, output_path: str):
"""Export change order log to Excel."""
with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
# Summary
summary = self.get_summary()
summary_df = pd.DataFrame([
{'Metric': 'Original Contract', 'Value': summary['original_contract']},
{'Metric': 'Approved Changes', 'Value': summary['approved_changes']},
{'Metric': 'Current Contract', 'Value': summary['current_contract']},
{'Metric': 'Pending Changes', 'Value': summary['pending_changes']},
{'Metric': 'Change %', 'Value': f"{summary['change_percent']}%"},
{'Metric': 'Schedule Impact (days)', 'Value': summary['total_schedule_impact_days']}
])
summary_df.to_excel(writer, sheet_name='Summary', index=False)
# Change order list
co_data = [co.to_dict() for co in self.change_orders.values()]
pd.DataFrame(co_data).to_excel(writer, sheet_name='Change Orders', index=False)
# Cost details
cost_data = []
for co in self.change_orders.values():
for item in co.cost_items:
cost_data.append({
'CO Number': co.co_number,
'Description': item.description,
'Quantity': item.quantity,
'Unit': item.unit,
'Unit Cost': item.unit_cost,
'Total': item.total_cost,
'Category': item.category
})
if cost_data:
pd.DataFrame(cost_data).to_excel(writer, sheet_name='Cost Details', index=False)
return output_path
# Initialize processor
processor = ChangeOrderProcessor(
project_name="Office Tower",
original_contract=50000000
)
# Create change order
co = processor.create_change_order(
title="Additional Electrical Outlets",
description="Add 50 electrical outlets per owner request",
change_type=ChangeType.OWNER_REQUESTED,
created_by="Project Manager"
)
# Add cost items
processor.add_cost_item(co.co_number, "Electrical outlets", 50, "EA", 150, "material")
processor.add_cost_item(co.co_number, "Installation labor", 25, "HR", 85, "labor")
# Set schedule impact
processor.set_schedule_impact(co.co_number, days=5)
# Submit for approval
processor.submit_for_review(co.co_number)
processor.submit_for_approval(co.co_number, "Reviewer", "Cost verified")
processor.approve_change_order(co.co_number, "Owner Rep", "Owner", "Approved per request")
summary = processor.get_summary()
print(f"Contract value: ${summary['current_contract']:,.0f}")
print(f"Change %: {summary['change_percent']}%")
processor.export_log("change_order_log.xlsx")
还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
中文简介正在准备中。当前显示原文说明。
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
中文简介正在准备中。当前显示原文说明。
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
中文简介正在准备中。当前显示原文说明。
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
中文简介正在准备中。当前显示原文说明。
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
中文简介正在准备中。当前显示原文说明。
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
中文简介正在准备中。当前显示原文说明。