跳到正文
cccskills
免费在 GitHub 公开

embodied-carbon-esg

Estimate embodied carbon and produce ESG/climate reporting for construction: LCA per work item, material-based carbon factors, EU taxonomy and CSRD alignment. Use when a project needs carbon estimates or sustainability reporting.

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(1)

  • SKILL.md2.6 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Embodied Carbon & ESG for Construction (2026)

Why it matters now

From 2026 the EU CSRD (Corporate Sustainability Reporting Directive) and EU Taxonomy force contractors and developers to report embodied carbon (A1–A5 life-cycle modules), not just operational energy. Estimators need carbon numbers next to price numbers at the BOQ line level.

Method

Carbon = quantity × carbon factor, applied per material resource line — exactly parallel to quantity × unit price = cost.

work item → components[] → material lines → quantity × EF (kg CO₂e / unit) → line carbon
BOQ roll-up: Σ line carbon = project embodied carbon (A1–A3) + transport/waste (A4–A5)

Data sources for factors

SourceCoverageLicense
ÖKOBAUDAT (DE)building materialsopen
INIES (FR) FDESproductsopen
ICE Database (UK)embodied carbonfree registration
EPD libraries (ECO Platform)manufacturer EPDsvaries

The CWICR bases already carry per-resource quantity and unit — attach an EF (kg CO₂e/unit) column for the materials and the roll-up is automatic.

What to compute per project

  • A1–A3 embodied carbon per BOQ section and per trade (from material lines).
  • A4–A5 transport + site waste assumptions (distance bands, waste rates per material).
  • kg CO₂e / m² and / m³ intensity benchmarks for early design.
  • Hotspot report: top 10 carbon lines (usually concrete, steel, aluminium, insulation).

EU Taxonomy / CSRD alignment

  • Map each work item to the taxonomy activity (construction of new buildings 7.1, renovation 7.2, …).
  • Report DNSH (Do No Significant Harm) screening: circularity, waste, water for the top materials.
  • Keep the evidence trail: factor source + version per line (auditors ask).

Honest limits

  • Carbon factors are regional and versioned — never mix databases without noting it.
  • BIM takeoff gives geometry; carbon needs material takeoff (from CWICR resource_name + resource_quantity).
  • Early-phase estimates are ±30–50%; label them as such.

Resources

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题