跳到正文
cccskills
免费在 GitHub 公开

generative-ai-design

Generative design for construction: text-to-BIM concepts, option generation, and AI-assisted design iteration with cost and carbon feedback. Use when exploring early design options with AI.

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(1)

  • SKILL.md2.4 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Generative AI Design for Construction (2026)

What is real in 2026

Generative design in construction is option generation with feedback, not autonomous architecture: given site constraints, program and budget, an AI generates massing/typology options and scores them on cost, carbon and buildability — the human designer selects and refines.

The loop

Constraints (site, program, budget)
        │
        ▼
Generate options (LLM/parametric/optimisation)
        │
        ▼
Quantify each option (BIM takeoff + CWICR cost + carbon)
        │
        ▼
Score & rank (cost/m², kgCO₂e/m², GFA efficiency)
        │
        ▼
Human selects → refine → detail

Toolchain

StageTools
Massing generationparametric tools (Rhino/Grasshopper, Dynamo) + LLM sketches
Text-to-conceptimage models (Midjourney/DALL·E) for moodboards; text-to-BIM is early-stage (Hypar, Finch, qbiq)
QuantificationOpenConstructionERP BIM takeoff (oce-bim-takeoff)
Cost scoringCWICR cost bases (oce-load-cost-bases)
Carbon scoringembodied-carbon-esg

Prompt pattern for concept generation

"Generate 3 massing options for a 12,000 m² residential building on a 30×60 m
plot, 6 storeys, max 40% glazing, Berlin climate. For each: GFA, FAR,
indicative structure, kgCO₂e/m² (A1-A3), €/m² construction cost."

Then quantify and rank:

OptionGFAFARCost/m²kgCO₂e/m²Verdict
A11,8002.91,050 €310lowest cost
B12,4003.11,180 €285lowest carbon
C12,1003.01,120 €295balanced

Guardrails

  • AI options are starting points, always human-reviewed and code-checked.
  • Cost/carbon scores come from real databases (CWICR + EPD), not LLM guesses.
  • Keep every option's inputs logged (reproducibility, AI Act transparency).
  • Text-to-BIM models are not yet permit-grade — treat outputs as concepts.

Resources

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题