跳到正文
cccskills
免费在 GitHub 公开

n8n-cost-estimation

Build n8n pipeline for automated cost estimation from Revit/IFC using DDC CWICR database and LLM classification.

中文简介正在准备中。当前显示原文说明。

集成工具Exceln8n
查看安装方法

包含的文件(3)

  • SKILL.md6.7 KB
  • claw.json525 B
  • instructions.md1.2 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Automated Cost Estimation Pipeline

Business Case

Problem Statement

Traditional cost estimation requires:

  • Manual work item lookup in price databases
  • Time-consuming element classification
  • Expert knowledge of pricing standards
  • Repetitive data entry

Solution

Free open-source n8n pipeline that converts CAD (Revit 2015-2026) files into full cost and time estimates using AI (LLM) and vector database with 55,000+ work items.

Business Value

Traditional RoleAutomated Alternative
BIM Manager manually exports dataPipeline auto-classifies elements
Junior Estimator searches databasesVector search finds matches in ms
Senior Estimator maps assembliesLLM identifies quantity parameters
Foreman calculates labor hoursDDC CWICR contains documented norms
Project Manager aggregates costsPipeline outputs phased breakdown

Processing speed: 3-10 seconds per element group

Technical Implementation

Pipeline Architecture

┌─────────────┐    ┌─────────────┐    ┌─────────────┐
│ Revit/IFC   │───>│ CAD2DATA    │───>│ Structured  │
│ File        │    │ Converter   │    │ Excel/CSV   │
└─────────────┘    └─────────────┘    └─────────────┘
                                             │
                                             ▼
┌─────────────┐    ┌─────────────┐    ┌─────────────┐
│ Cost Report │<───│ Price Match │<───│ LLM Class.  │
│ HTML/Excel  │    │ DDC CWICR   │    │ + QTO       │
└─────────────┘    └─────────────┘    └─────────────┘

n8n Pipeline Steps

1. File Conversion Node

// Execute CAD converter
const filePath = $input.first().json.file_path;
const outputDir = filePath.replace(/\.[^.]+$/, '');

const command = `RvtExporter.exe "${filePath}" complete bbox`;

// Returns: { xlsx_path, dae_path }

2. Load Elements

// Read converted Excel into n8n
const xlsx = $node["Read Binary Files"].json;
const elements = xlsx.sheets["Elements"];

// Group by category for processing
const grouped = elements.reduce((acc, el) => {
  const cat = el.Category;
  if (!acc[cat]) acc[cat] = [];
  acc[cat].push(el);
  return acc;
}, {});

return Object.entries(grouped).map(([category, items]) => ({
  json: {category, items, count: items.length}
}));

3. LLM Classification

// Prompt for Claude/GPT classification
const prompt = `
You are a construction estimator. Given these BIM elements:
Category: ${$input.first().json.category}
Sample elements: ${JSON.stringify($input.first().json.items.slice(0,5))}

1. Identify the construction work type
2. List relevant quantity parameters (Volume, Area, Length, Count)
3. Suggest standard work items from construction norms

Return as JSON:
{
  "work_type": "...",
  "quantity_params": ["Volume", "Area"],
  "suggested_items": ["Concrete foundation", "Formwork"]
}
`;

4. Vector Search in CWICR

// Search DDC CWICR database for matching work items
const qdrantClient = require('@qdrant/js-client-rest');

const searchResults = await qdrantClient.search('cwicr_en_v3', {
  vector: await getEmbedding($input.first().json.work_description),
  limit: 10,
  score_threshold: 0.7
});

return searchResults.map(r => ({
  json: {
    work_code: r.payload.work_item_code,
    description: r.payload.description,
    unit: r.payload.unit,
    unit_price: r.payload.unit_price,
    similarity: r.score
  }
}));

5. Calculate Costs

// Match quantities to prices
const elements = $node["Load Elements"].json;
const prices = $node["Vector Search"].json;

let totalCost = 0;
const breakdown = [];

for (const el of elements.items) {
  const matchedPrice = prices.find(p => p.similarity > 0.8);
  if (matchedPrice) {
    const quantity = el.Volume || el.Area || 1;
    const cost = quantity * matchedPrice.unit_price;
    totalCost += cost;

    breakdown.push({
      element: el.Name,
      quantity: quantity,
      unit: matchedPrice.unit,
      unit_price: matchedPrice.unit_price,
      total: cost
    });
  }
}

return [{json: {totalCost, breakdown}}];

6. Generate Report

// Create HTML report
const data = $input.first().json;

const html = `
<!DOCTYPE html>
<html>
<head>
  <title>Cost Estimate Report</title>
  <style>
    body { font-family: Arial, sans-serif; margin: 20px; }
    table { border-collapse: collapse; width: 100%; }
    th, td { border: 1px solid #ddd; padding: 8px; text-align: left; }
    th { background-color: #4CAF50; color: white; }
    .total { font-size: 1.5em; font-weight: bold; }
  </style>
</head>
<body>
  <h1>Cost Estimate Report</h1>
  <p class="total">Total: $${data.totalCost.toLocaleString()}</p>
  <table>
    <tr><th>Element</th><th>Quantity</th><th>Unit</th><th>Price</th><th>Total</th></tr>
    ${data.breakdown.map(row => `
      <tr>
        <td>${row.element}</td>
        <td>${row.quantity.toFixed(2)}</td>
        <td>${row.unit}</td>
        <td>$${row.unit_price.toFixed(2)}</td>
        <td>$${row.total.toFixed(2)}</td>
      </tr>
    `).join('')}
  </table>
</body>
</html>
`;

return [{json: {html, filename: 'estimate_report.html'}}];

Real-World Results

Example project (rac_basic_sample.rvt):

  • Processing time: ~30 minutes with ChatGPT
  • Elements analyzed: 500+
  • Automatic classification: 95% accuracy
  • Manual review needed: 5% edge cases

Key Insight from Community

"My subjective take: professionals who ignore workflow automation and AI-agents today have roughly 5 years before the construction industry moves past them. The tools are free and open. The data is open. The only question is who learns to use them first."

Prerequisites

  • n8n (local or hosted)
  • DDC CAD converters
  • DDC CWICR database
  • OpenAI/Anthropic API key
  • Qdrant vector database

Resources

  • GitHub: cad2data Pipeline repository
  • Database: OpenConstructionEstimate-DDC-CWICR
  • Community: n8n Workflows for Construction (Telegram)

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题