Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
中文简介正在准备中。当前显示原文说明。
CAD/BIM takeoff in OpenConstructionERP: upload Revit/IFC/DWG/DGN models, browse elements, bulk-link them to BOQ lines, measure DWG drawings and PDF plans, and push quantities into the estimate. Use for any model-based quantification workflow.
中文简介正在准备中。当前显示原文说明。
实测评分 未实测
查看安装方法安装前可以查看交给 AI 代理的指令内容。
| Format | In | Out |
|---|---|---|
| RVT (Revit) | upload | canonical JSON, GLB, thumbnails |
| IFC | upload (no IfcOpenShell required) | JSON/GLB |
| DWG | upload + layer browse | measured entities |
| DGN | upload | JSON/GLB |
| plan upload | vector/room measurements, dimension text (OCR optional) | |
| LAS/LAZ/COPC | point-cloud viewer | decimated THREE.Points buffers |
Conversions run in-process via the bundled DDC converters; artifacts persist under data/bim/{project_id}/{model_id}/.
POST /api/v1/bim/...).POST /api/v1/costs/suggest-for-element ranks cost items for a BIM element body (type, material, dimensions, classification).cad2data-Revit-IFC-DWG-DGN-pipeline).keep_original_cad); artifacts are always retained.还没有评价。欢迎分享你的使用感受。
无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。
还没有评论。来写第一条吧。
Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.
中文简介正在准备中。当前显示原文说明。
Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.
中文简介正在准备中。当前显示原文说明。
Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.
中文简介正在准备中。当前显示原文说明。
Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.
中文简介正在准备中。当前显示原文说明。
Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.
中文简介正在准备中。当前显示原文说明。
Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.
中文简介正在准备中。当前显示原文说明。