跳到正文
cccskills
免费在 GitHub 公开

oce-field-ops

Field operations in OpenConstructionERP: punch list, daily diary, HSE observations and task tracking on site. Use when automating construction site workflows (deficiencies, diaries, safety, site tasks).

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(1)

  • SKILL.md2.1 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Field Operations in OpenConstructionERP

Modules for the site

ModulePurposeTypical flow
punch_listDeficiencies / snag itemscreate item → assign → verify → close
daily_diaryDaily site reportsweather, workforce, progress, incidents
hseHealth, safety, environmentobservations, incidents, checklists
tasksSite task boardKanban, issues linked to BIM elements

Punch list workflow

  1. Inspector (or a photo) creates a punch item: location, trade, priority, due date, photo attachment.
  2. Item auto-assigns to the responsible trade (routing rules).
  3. Contractor marks fixed → inspector verifies → item closes.
  4. Closeout report: open vs closed per trade/zone, aging.

Daily diary automation

  • Prefill from the schedule: planned activities of the day.
  • Inputs: weather (integrated), workforce counts, deliveries, issues, photos.
  • Auto-summary to the weekly progress report (see oce-scheduling-4d5d roll-ups).

HSE

  • Safety observations: classify (PPE, fall protection, housekeeping…), severity, follow-up.
  • Incident reports with photo evidence and root-cause fields.
  • Checklists per trade and per regulation (OSHA / local).

API patterns

POST /api/v1/punch-list/          # create punch item
PATCH /api/v1/punch-list/{id}     # status/assignee
POST /api/v1/daily-diary/         # diary entry
GET  /api/v1/tasks/?project=...   # site tasks

(Endpoint names may vary by module version — check backend/app/modules/*/router.py for the authoritative surface.)

Best practices

  1. Link punch items to BIM elements — the 3D view shows open deficiencies in place.
  2. Make the daily diary the single source of actuals (it feeds variance reports).
  3. Photos on every issue: evidence beats memory in disputes.
  4. Close the loop — every observation ends in an action, not a note.

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3632026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题