跳到正文
cccskills
免费在 GitHub 公开

oce-property-dev

Property development lifecycle in OpenConstructionERP: lead to SPA to handover — feasibility, budgeting from cost bases, sales tracking and construction handover. Use for residential/commercial development projects.

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(1)

  • SKILL.md1.8 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Property Development in OpenConstructionERP

Lifecycle

Lead → Feasibility → Design → SPA (sale) → Construction → Handover
StageWhat the platform does
Leadland/opportunity record, key metrics
Feasibilityrough budget from CWICR cost bases (m² rates), margin check
DesignBIM model, BOQ, detailed estimate
SPAsale/presale tracking, payment milestones
ConstructionBOQ + schedule + field modules (see oce-field-ops)
Handovercloseout report, as-built docs, punch closeout

Feasibility estimation

Use cost-base intensity rates (per m²) from a loaded base:

# rough budget: GFA × regional m² rate from CWICR items
gfa_m2 = 12_000
m2_rate = 1_050  # TRY/m², from cost-base roll-ups for residential
budget = gfa_m2 * m2_rate

Then refine with a real BOQ as design progresses. Early-phase estimates carry ±30% — label them.

Sales & SPA

  • Track units, price lists, sold/reserved/available.
  • Payment milestones tied to construction progress (SPA installments).
  • Cash-flow: sales inflow vs construction outflow over the schedule.

Handover

  • Punch-list closeout (see oce-field-ops).
  • As-built package: final BOQ, models, docs, warranties.
  • Defect liability tracking post-handover.

Best practices

  1. Keep feasibility numbers honest — they set the land price.
  2. Tie SPA milestones to construction gates, not calendar guesses.
  3. One project currency for the development; report to investors in their currency separately.
  4. Retain the as-built package in the project record — it is the warranty baseline.

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题