4D Scheduling & 5D Cost Model in OpenConstructionERP

Concepts

  • 4D = schedule + BIM: every task can reference BIM elements so the sequence is visual.
  • 5D = schedule + cost: cost roll-ups per task/phase from linked BOQ lines.
  • Both live on the same task graph — one source of truth for time and money.

Workflow

  1. Build the task graph — tasks, durations, dependencies (FS/SS/FF), milestones, critical path.
  2. Link BIM elements to tasks (from oce-bim-takeoff) — visual sequencing and progress colouring.
  3. Link BOQ lines to tasks (from oce-estimate-boq) — each task carries its direct cost.
  4. Roll up — phase/project totals, cash-flow curves (cost over time), SPI/CPI views.
  5. Track — daily diary entries and punch items update actuals; variance reports compare plan vs actual.

Key endpoints

  • tasks: create/update, dependencies, assignees, status board
  • scheduling: timeline data for the Gantt, milestone markers
  • cost model: GET-side roll-ups per task/phase; export to XLSX/PDF reports

Integration rules

  • One region/currency per project — the cost model never blends currencies.
  • Quantity changes from BIM re-link update BOQ line quantities, which update the cost model in turn.
  • Re-validate the BOQ after bulk changes; schedule conflicts surface in the timeline.

Best practices

  1. Keep dependencies explicit — the critical path is only as good as the logic.
  2. Use milestones for payments/tender gates, not for activity progress.
  3. Compare plan vs actual weekly; adjust the forecast, not history.
  4. For multi-project portfolios, roll up by project and by currency group (never blended).

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3592026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题