跳到正文
cccskills
免费在 GitHub 公开

schedule-cost-link

Link schedule activities to cost items. Create cost-loaded schedules, generate cash flow curves, and track earned value.

中文简介正在准备中。当前显示原文说明。

集成工具Excel
查看安装方法

包含的文件(3)

  • SKILL.md13.5 KB
  • claw.json501 B
  • instructions.md1.2 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Schedule-Cost Linker

Business Case

Problem Statement

Integrating schedule and cost requires:

  • Linking activities to budget items
  • Creating cost-loaded schedules
  • Generating cash flow forecasts
  • Tracking earned value metrics

Solution

Systematic linkage between schedule activities and cost data to enable integrated project control.

Technical Implementation

import pandas as pd
import numpy as np
from typing import Dict, Any, List, Optional, Tuple
from dataclasses import dataclass, field
from datetime import date, timedelta
from enum import Enum
from collections import defaultdict


class LoadingMethod(Enum):
    UNIFORM = "uniform"          # Even distribution
    FRONT_LOADED = "front_loaded"
    BACK_LOADED = "back_loaded"
    BELL_CURVE = "bell_curve"


@dataclass
class ScheduleActivity:
    activity_id: str
    name: str
    start_date: date
    finish_date: date
    duration: int
    percent_complete: float = 0


@dataclass
class CostItem:
    cost_code: str
    description: str
    budgeted_cost: float
    labor_cost: float
    material_cost: float
    equipment_cost: float


@dataclass
class ActivityCostLink:
    activity_id: str
    cost_code: str
    budgeted_cost: float
    loading_method: LoadingMethod


@dataclass
class EarnedValueMetrics:
    data_date: date
    bcws: float  # Budgeted Cost of Work Scheduled (PV)
    bcwp: float  # Budgeted Cost of Work Performed (EV)
    acwp: float  # Actual Cost of Work Performed (AC)
    sv: float    # Schedule Variance
    cv: float    # Cost Variance
    spi: float   # Schedule Performance Index
    cpi: float   # Cost Performance Index
    eac: float   # Estimate at Completion
    etc: float   # Estimate to Complete
    vac: float   # Variance at Completion


class ScheduleCostLinker:
    """Link schedule activities to cost items."""

    def __init__(self, project_name: str, budget_at_completion: float):
        self.project_name = project_name
        self.bac = budget_at_completion
        self.activities: Dict[str, ScheduleActivity] = {}
        self.cost_items: Dict[str, CostItem] = {}
        self.links: List[ActivityCostLink] = []
        self.actual_costs: Dict[str, float] = {}  # activity_id -> actual cost

    def add_activity(self,
                     activity_id: str,
                     name: str,
                     start_date: date,
                     finish_date: date,
                     percent_complete: float = 0):
        """Add schedule activity."""

        duration = (finish_date - start_date).days + 1

        self.activities[activity_id] = ScheduleActivity(
            activity_id=activity_id,
            name=name,
            start_date=start_date,
            finish_date=finish_date,
            duration=duration,
            percent_complete=percent_complete
        )

    def add_cost_item(self,
                      cost_code: str,
                      description: str,
                      budgeted_cost: float,
                      labor_pct: float = 0.4,
                      material_pct: float = 0.5,
                      equipment_pct: float = 0.1):
        """Add cost item."""

        self.cost_items[cost_code] = CostItem(
            cost_code=cost_code,
            description=description,
            budgeted_cost=budgeted_cost,
            labor_cost=budgeted_cost * labor_pct,
            material_cost=budgeted_cost * material_pct,
            equipment_cost=budgeted_cost * equipment_pct
        )

    def link_activity_cost(self,
                           activity_id: str,
                           cost_code: str,
                           loading_method: LoadingMethod = LoadingMethod.UNIFORM):
        """Link activity to cost item."""

        if activity_id not in self.activities:
            return

        cost_item = self.cost_items.get(cost_code)
        budgeted = cost_item.budgeted_cost if cost_item else 0

        self.links.append(ActivityCostLink(
            activity_id=activity_id,
            cost_code=cost_code,
            budgeted_cost=budgeted,
            loading_method=loading_method
        ))

    def record_actual_cost(self, activity_id: str, actual_cost: float):
        """Record actual cost for activity."""
        self.actual_costs[activity_id] = actual_cost

    def _distribute_cost(self,
                          cost: float,
                          start_date: date,
                          duration: int,
                          method: LoadingMethod) -> Dict[date, float]:
        """Distribute cost over activity duration."""

        daily_costs = {}

        if duration <= 0:
            return {start_date: cost}

        if method == LoadingMethod.UNIFORM:
            daily = cost / duration
            for i in range(duration):
                daily_costs[start_date + timedelta(days=i)] = daily

        elif method == LoadingMethod.FRONT_LOADED:
            total_weight = sum(range(duration, 0, -1))
            for i in range(duration):
                weight = (duration - i) / total_weight
                daily_costs[start_date + timedelta(days=i)] = cost * weight

        elif method == LoadingMethod.BACK_LOADED:
            total_weight = sum(range(1, duration + 1))
            for i in range(duration):
                weight = (i + 1) / total_weight
                daily_costs[start_date + timedelta(days=i)] = cost * weight

        elif method == LoadingMethod.BELL_CURVE:
            # Simplified bell curve
            mid = duration / 2
            for i in range(duration):
                distance = abs(i - mid)
                weight = 1 - (distance / mid) * 0.5
                daily_costs[start_date + timedelta(days=i)] = cost * weight / duration

        return daily_costs

    def generate_cost_loaded_schedule(self) -> pd.DataFrame:
        """Generate cost-loaded schedule."""

        data = []

        for link in self.links:
            activity = self.activities.get(link.activity_id)
            cost_item = self.cost_items.get(link.cost_code)

            if activity and cost_item:
                data.append({
                    'Activity ID': activity.activity_id,
                    'Activity Name': activity.name,
                    'Cost Code': link.cost_code,
                    'Description': cost_item.description,
                    'Start': activity.start_date,
                    'Finish': activity.finish_date,
                    'Duration': activity.duration,
                    'Budget': link.budgeted_cost,
                    '% Complete': activity.percent_complete,
                    'Earned Value': link.budgeted_cost * activity.percent_complete / 100,
                    'Loading': link.loading_method.value
                })

        return pd.DataFrame(data)

    def generate_cash_flow(self,
                           project_start: date = None,
                           project_end: date = None) -> pd.DataFrame:
        """Generate cash flow curve."""

        if not self.links:
            return pd.DataFrame()

        # Get date range
        if project_start is None:
            project_start = min(self.activities[l.activity_id].start_date for l in self.links)
        if project_end is None:
            project_end = max(self.activities[l.activity_id].finish_date for l in self.links)

        # Aggregate daily costs
        daily_totals = defaultdict(float)

        for link in self.links:
            activity = self.activities.get(link.activity_id)
            if not activity:
                continue

            daily_costs = self._distribute_cost(
                link.budgeted_cost,
                activity.start_date,
                activity.duration,
                link.loading_method
            )

            for day, cost in daily_costs.items():
                daily_totals[day] += cost

        # Build cash flow data
        data = []
        cumulative = 0
        current = project_start

        while current <= project_end:
            daily = daily_totals.get(current, 0)
            cumulative += daily

            data.append({
                'Date': current,
                'Daily': round(daily, 2),
                'Cumulative': round(cumulative, 2),
                'Cumulative %': round(cumulative / self.bac * 100, 1) if self.bac > 0 else 0
            })

            current += timedelta(days=1)

        return pd.DataFrame(data)

    def calculate_earned_value(self, data_date: date) -> EarnedValueMetrics:
        """Calculate earned value metrics at data date."""

        # BCWS - Planned Value through data date
        bcws = 0
        for link in self.links:
            activity = self.activities.get(link.activity_id)
            if not activity:
                continue

            daily_costs = self._distribute_cost(
                link.budgeted_cost,
                activity.start_date,
                activity.duration,
                link.loading_method
            )

            for day, cost in daily_costs.items():
                if day <= data_date:
                    bcws += cost

        # BCWP - Earned Value (budget * % complete)
        bcwp = 0
        for link in self.links:
            activity = self.activities.get(link.activity_id)
            if activity:
                bcwp += link.budgeted_cost * activity.percent_complete / 100

        # ACWP - Actual Cost
        acwp = sum(self.actual_costs.values())

        # Variances
        sv = bcwp - bcws
        cv = bcwp - acwp

        # Indices
        spi = bcwp / bcws if bcws > 0 else 0
        cpi = bcwp / acwp if acwp > 0 else 0

        # Forecasts
        eac = self.bac / cpi if cpi > 0 else self.bac
        etc = eac - acwp
        vac = self.bac - eac

        return EarnedValueMetrics(
            data_date=data_date,
            bcws=round(bcws, 2),
            bcwp=round(bcwp, 2),
            acwp=round(acwp, 2),
            sv=round(sv, 2),
            cv=round(cv, 2),
            spi=round(spi, 2),
            cpi=round(cpi, 2),
            eac=round(eac, 2),
            etc=round(etc, 2),
            vac=round(vac, 2)
        )

    def get_monthly_cash_flow(self) -> pd.DataFrame:
        """Aggregate cash flow by month."""

        daily = self.generate_cash_flow()
        if daily.empty:
            return pd.DataFrame()

        daily['Month'] = pd.to_datetime(daily['Date']).dt.to_period('M')
        monthly = daily.groupby('Month').agg({
            'Daily': 'sum',
            'Cumulative': 'last'
        }).reset_index()

        monthly.columns = ['Month', 'Monthly Cost', 'Cumulative']
        return monthly

    def export_to_excel(self, output_path: str) -> str:
        """Export integrated data to Excel."""

        with pd.ExcelWriter(output_path, engine='openpyxl') as writer:
            # Cost-loaded schedule
            schedule = self.generate_cost_loaded_schedule()
            schedule.to_excel(writer, sheet_name='Cost-Loaded Schedule', index=False)

            # Cash flow
            cash_flow = self.generate_cash_flow()
            if not cash_flow.empty:
                cash_flow.to_excel(writer, sheet_name='Cash Flow', index=False)

            # Monthly
            monthly = self.get_monthly_cash_flow()
            if not monthly.empty:
                monthly.to_excel(writer, sheet_name='Monthly', index=False)

            # Earned Value
            evm = self.calculate_earned_value(date.today())
            evm_df = pd.DataFrame([{
                'Data Date': evm.data_date,
                'BCWS (PV)': evm.bcws,
                'BCWP (EV)': evm.bcwp,
                'ACWP (AC)': evm.acwp,
                'SV': evm.sv,
                'CV': evm.cv,
                'SPI': evm.spi,
                'CPI': evm.cpi,
                'EAC': evm.eac,
                'ETC': evm.etc,
                'VAC': evm.vac
            }])
            evm_df.to_excel(writer, sheet_name='Earned Value', index=False)

        return output_path

Quick Start

from datetime import date, timedelta

# Initialize linker
linker = ScheduleCostLinker("Office Building", budget_at_completion=5000000)

# Add activities
linker.add_activity("A-001", "Foundation", date(2024, 6, 1), date(2024, 6, 30), percent_complete=100)
linker.add_activity("A-002", "Structure", date(2024, 7, 1), date(2024, 9, 30), percent_complete=60)
linker.add_activity("A-003", "MEP", date(2024, 8, 1), date(2024, 11, 30), percent_complete=30)

# Add cost items
linker.add_cost_item("01-FOUND", "Foundation Work", 500000)
linker.add_cost_item("02-STRUCT", "Structural Work", 2000000)
linker.add_cost_item("03-MEP", "MEP Systems", 1500000)

# Link
linker.link_activity_cost("A-001", "01-FOUND")
linker.link_activity_cost("A-002", "02-STRUCT", LoadingMethod.BELL_CURVE)
linker.link_activity_cost("A-003", "03-MEP", LoadingMethod.BACK_LOADED)

# Record actuals
linker.record_actual_cost("A-001", 520000)
linker.record_actual_cost("A-002", 1300000)

Common Use Cases

1. Earned Value Analysis

evm = linker.calculate_earned_value(date.today())
print(f"CPI: {evm.cpi}")
print(f"SPI: {evm.spi}")
print(f"EAC: ${evm.eac:,.2f}")

2. Cash Flow Forecast

cash_flow = linker.generate_cash_flow()
print(cash_flow.tail(10))

3. Monthly Breakdown

monthly = linker.get_monthly_cash_flow()
print(monthly)

Resources

  • DDC Book: Chapter 4.2 - Schedule-Cost Integration

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

Create 4D construction simulations by linking BIM elements to project schedules. Generate time-based visualizations, sequence analysis, and construction phasing with Gantt integration.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Analyze 5000+ IFC and Revit projects at scale for patterns, benchmarks, and insights. Big data analysis for construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Check construction AI systems against the EU AI Act (Regulation 2024/1689): classify risk of estimation, scheduling, CV and agent tools, document transparency, keep human oversight. Use when deploying or auditing AI in construction.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Orchestrate multiple AI agents for construction workflows: estimator, scheduler, document, QA and safety agents coordinated by a supervisor agent, with human checkpoints. Use when automating end-to-end project processes with agentic AI.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Create Apache Airflow DAGs for construction data pipelines. Orchestrate ETL, validation, and reporting workflows.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

Automate as-built documentation and digital handover for construction. Compile project records, generate O&M manuals, create asset databases, and ensure complete project closeout.

中文简介正在准备中。当前显示原文说明。

datadrivenconstruction/DDC_Skills_for_AI_Agents_in_Construction3682026年10月20日 更新

查看 datadrivenconstruction 的全部技能

报告此技能的问题