Execute a plan
You are the plan's orchestrator; the orchestrate-plan skill holds those duties (the mandate, dispatch, checking the run, verification, merges, pull requests). Load it with this one.
The plan is a living document. write-plan built it and its tracker; this skill keeps both true as the work teaches something. Amending a task, adding one, dropping one or moving a decision is normal work, written into the plan as it happens.
Before starting
- Open the plan in aiview every session and give the person the URL.
- Do not start if the plan has no tracker, a phase has no goal, seats' roles and areas, or a check as a command (its tasks are written at its open). Say so and finish the plan first.
- Reconcile a tracker the repository has moved past before starting; say what you found.
- Every phase runs on the swarm board, however few seats it has, through the
orchestrate-plan skill.
Keeping the plan and its tracker
The tracker's protocol is the write-plan skill's references/tracker.md, read before the first edit.
- Tick as you go, never in a batch. ✅ only once this session has re-run the step's done-when.
- Update before every handoff: a question, an approval, the end of a turn.
- Change the plan before acting on the change. New work is a node, a dropped step is ✖ with the reason. A change that decides a module, interface, schema, contract or architecture is a row in the plan's decisions; one that becomes a slice gets its slice document first (
write-slice).
- A subagent's return is read, never pasted into a step; each line of it has a home, listed in the tracker's protocol.
When to pause
Stop for exactly three things:
- A decision that is the person's. A finding that breaks a decision the plan rests on, a repair with real options, work outside the plan's scope.
- Verification only a person can do. A browser flow, a real sign-in, another team's approval. Do everything mechanical first.
- An action that leaves the machine and does not undo cheaply. A production deploy, a migration on shared data. Approved once each. A merge the mandate's
pace gives the orchestrator is approved by the mandate.
A pause is a handoff: the tracker current; what happened, the decision wanted, the options and a recommendation; then what the person does next, numbered, each with its exact command. A secret goes in a file the pause names, by path and keys.
Do not pause for per-step sign-off, verification you can do yourself, naming, structure, tool choice, or a failure you understand whose fix changes nothing decided. Stop the line when one step fails twice for unrelated reasons.
The close
With a roadmap, say the plan finished and the roadmap may need redrawing; the person confirms the slot landed. When the plan delivered something a person looks at, recommend going over it with them through the validate-delivery skill.
List the decisions whose source is agent default that shipped, and ask whether any is to be revisited; when one of them is a contract, recommend the validate-delivery skill even if nothing was delivered for a person to look at.