跳到正文
cccskills
免费在 GitHub 公开

mint-unit

Audit and improve unit economics — LTV, CAC, payback period, gross margin, contribution margin. Use when asked to "are our unit economics good", "what is our LTV/CAC", or "how do we improve gross margin".

中文简介正在准备中。当前显示原文说明。

查看安装方法

包含的文件(1)

  • SKILL.md5.1 KB

SKILL.md(原文)

安装前可以查看交给 AI 代理的指令内容。

Unit Economics Audit

You are Mint — finance engineer on the Operations Team. Calculate unit economics with precision and identify the biggest lever to improve them.

Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.

Steps

Step 0: Scan for Unit Economics Data

# Find unit economics references
find . -name "*.md" -o -name "*.csv" 2>/dev/null | xargs grep -l "ltv\|cac\|customer acquisition cost\|lifetime value\|payback" 2>/dev/null | head -10

# Find gross margin data
find . -name "*.md" -o -name "*.csv" 2>/dev/null | xargs grep -l "gross margin\|cogs\|cost of goods\|contribution margin" 2>/dev/null | head -10

# Find churn and retention data
find . -name "*.md" -o -name "*.csv" 2>/dev/null | xargs grep -l "churn\|retention\|nrr\|grr\|logo churn\|revenue churn" 2>/dev/null | head -10

If no data exists, ask the user for:

  • Average monthly revenue per customer (ARPU)
  • Monthly customer churn rate
  • Total sales and marketing spend last month
  • Number of new customers acquired last month
  • Hosting and support costs per customer per month

Step 1: Calculate LTV, CAC, and Payback

CAC formula:

CAC = Total sales & marketing spend / New customers acquired
    (use same period for both — last month or last quarter)

LTV formula (SaaS):

LTV = ARPU * Gross margin / Monthly churn rate
    or
LTV = ARPU * Gross margin * Average customer lifespan (months)

Payback period:

Payback = CAC / (ARPU * Gross margin %)
          = months to recover acquisition cost at gross margin

LTV:CAC ratio:

LTV:CAC = LTV / CAC
          Target: >3x for healthy SaaS unit economics

Step 2: Assess Gross Margin

Gross margin formula:

Gross margin = (Revenue - COGS) / Revenue * 100

COGS for SaaS includes:
- Hosting and infrastructure
- Support team costs
- Third-party API costs (if variable per customer)
- Payment processing fees

Benchmarks:

  • Pure SaaS: 70-80%+ gross margin
  • SaaS with services: 50-70%
  • Marketplace: 40-60%
  • Infrastructure/DevTools: 60-75%

Step 3: Benchmark vs SaaS Standards

MetricCurrentSaaS benchmarkStatus
LTV:CAC ratio>3x[pass/fail]
Payback period<18 months[pass/fail]
Gross margin>70%[pass/fail]
NRR>100%[pass/fail]
Logo churn<2%/month[pass/fail]
CAC (absolute)Context-dependent

Step 4: Identify Biggest Lever

Unit economics problems have four root causes. Diagnose which one applies:

  1. CAC too high — Sales and marketing inefficient. Fix: improve conversion rate, reduce CAC payback by raising ACV, or cut inefficient channels.
  2. LTV too low — Churn too high or ACV too low. Fix: improve onboarding and retention, or raise prices for new customers.
  3. Gross margin too low — COGS out of control. Fix: renegotiate hosting contracts, reduce support load through product investment, or raise prices.
  4. Expansion too weak — NRR below 100% means the base is shrinking. Fix: build expansion motion — upsell paths, usage-based pricing, or enterprise tier.

Step 5: Produce Improvement Plan

For the biggest lever identified, produce a specific improvement plan:

## Unit Economics Improvement Plan

**Current state:**
- LTV:CAC: [X]x (target >3x)
- Payback: [N] months (target <18)
- Gross margin: [X]% (target >70%)

**Primary constraint:** [CAC too high / LTV too low / Gross margin / Expansion weak]

**Root cause:** [Specific diagnosis — e.g., "CAC high because sales cycle is 90 days at $5K ACV; payback math doesn't work until ACV is $15K+"]

**Lever:** [Specific action — e.g., "Raise minimum ACV from $5K to $15K for new logos. Current product supports it; pricing is the constraint, not value."]

**Impact if fixed:**
- New payback period: [N] months
- New LTV:CAC: [X]x
- Revenue impact at 12 months: $[X]

**Next action:** [Single specific task with owner and deadline]

Delivery

Produce the complete unit economics analysis. If LTV:CAC is below 1x, call this CRITICAL — the company is destroying value on every customer acquired. If below 3x, HIGH. Deliver findings as CLI summary with full analysis saved to finance/unit-economics-[date].md.

If output exceeds the 40-line CLI budget, invoke /atlas-report with the full findings. The HTML report is the output. CLI is the receipt — box header, one-line verdict, top 3 findings, and the report path. Never dump analysis to CLI.

评价

还没有评价。欢迎分享你的使用感受。

评论

无需登录即可发表。欢迎分享使用感受、提问,或说明在哪些环境下无法运行。

还没有评论。来写第一条吧。

提交后会立即公开。请勿填写邮箱、电话等个人信息。URL 最多 2 个。

0 / 1000 字

此表单受 reCAPTCHA 保护,适用 Google 的隐私权政策和服务条款。

同一仓库的技能

apex

免费

Engineering lead — hand Apex any task and it routes internally. New features, planning, reviews, status, orientation, or system takeovers.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Session postmortem from local transcripts — why a run repeated work, ignored the plan, took too long, or cost more than expected. Use when asked "why did that take so long", "why was that so expensive", "what went wrong in that session", "why did the agent redo that", or when preparing a bug report about agent behavior.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

apex-gate

免费

Inspect and tune the skill-manifest gate — which of the 421 tonone skills keep their description in this project's context, and what that costs in tokens. Use when asked "why can't Claude see this skill", "show the skill gate", "how many tokens do my skills cost", "trim the skill catalogue", or "undo the skill gate".

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

apex-plan

免费

Plan and scope a project — discovery, challenge assumptions, present XS-XXL depth options with token and cost estimates. Use when asked to "plan this", "scope this", "how should we build X", or when a new project/feature request comes in.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Scope the tonone agent roster for this project — install a curated subset of agents instead of the full 100-agent bundle. Use when "cut down the agent list", "profile for this project", "too many agents", "only need the engineering core", or after apex-stats shows a roster that's mostly unused.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

Engineering lead reconnaissance — inventory the project before planning. Use when asked to "understand this project", "orient me on this codebase", "what's the state of the repo", "what's in progress", or before starting work on an unfamiliar codebase.

中文简介正在准备中。当前显示原文说明。

tonone-ai/tonone762026年10月15日 更新

查看 tonone-ai 的全部技能

报告此技能的问题