Skip to content
cccskills
FreePublished on GitHub

vibe-cherry-pick-integration

Safely integrates commits from parallel agent branches using sequential cherry-pick. Use after parallel work completes in isolated branches or worktrees.

The English summary is being prepared. Showing the original description.

See how to install

Files included (1)

  • SKILL.md2.2 KB

SKILL.md (original)

Review the instructions the agent will receive before you install.

vibe-cherry-pick-integration

Parallel agents produce parallel branches. This skill integrates them safely without merge conflicts destroying work.

When to Use This Skill

  • Multiple agents completed work in isolated branches/worktrees
  • Need to combine parallel work onto a single integration branch
  • After vibe-parallel-task-decomposition dispatched work

When NOT to Use This Skill

  • Single branch with sequential work (just push)
  • Merge conflicts are expected and desired for resolution
  • The parallel work was all in the same files (this won't help — resolve manually)

Steps

  1. Inventory branches — List the branches and worktrees with completed work. Harnesses name them differently, so list rather than guess a pattern:

    git worktree list
    git branch --sort=-committerdate | head -20
    
  2. Determine integration order — Cherry-pick in dependency order:

    • Independent tasks first (any order within batch)
    • Dependent tasks after their dependencies
  3. For each branch: a. Identify commits to cherry-pick: git log main..branch-name --oneline b. Cherry-pick onto integration branch: git cherry-pick <commit-hash> c. If conflict:

    • Examine both sides
    • Resolve keeping the semantic intent of both
    • git cherry-pick --continue d. Run tests after each cherry-pick: [test command] e. If tests fail: fix before proceeding to next branch
  4. Verify integration — Run full test suite after all cherry-picks

  5. Clean up — Remove integrated branches if desired

Output Format

Cherry-Pick Integration

Branches integrated: X Commits cherry-picked: Y Conflicts resolved: Z Tests: PASS/FAIL after integration

BranchCommitsConflictsTests After
agent/auth-stream30PASS
agent/api-stream21PASS

Conflict Resolutions

  1. [File]: [How it was resolved]

Final Status

  • All tests passing: Yes/No
  • Integration branch: [name]
  • Ready to merge: Yes/No

Reviews

No reviews yet. Tell others what you thought.

Comments

No login needed. Share how it worked for you, ask a question, or note where it did not run.

No comments yet. Be the first to write one.

Comments are published right away. Do not include personal information such as email addresses or phone numbers. Up to 2 URLs.

0 / 1,000 characters

This form is protected by reCAPTCHA, and the Google Privacy Policy and Terms of Service apply.

More skills from this repository

Validates completed work against defined acceptance criteria. Use after completing a task that has specific success criteria defined in issues, specs, or task descriptions.

The English summary is being prepared. Showing the original description.

ash1794/vibe-engineering164Updated Oct 8, 2026

Generates edge case, failure mode, and spec-driven test cases. Covers boundary values, nil inputs, concurrency, resource exhaustion, malformed data, and requirement-linked traceability tests. Use after happy-path tests exist and before claiming coverage is complete, when requirements lack tests, or before a security review.

The English summary is being prepared. Showing the original description.

ash1794/vibe-engineering164Updated Oct 8, 2026

Catches shortcuts and reward hacking — weakening or deleting tests to make them pass, hard-coding expected outputs, silently dropping requirements, or claiming work is done without running it. Use before declaring a task complete and whenever a test or requirement feels like it's in the way.

The English summary is being prepared. Showing the original description.

ash1794/vibe-engineering164Updated Oct 8, 2026

Audits tests for concurrency safety — race conditions, shared mock state, cleanup ordering. Use when writing tests that involve goroutines, async operations, or shared mutable state.

The English summary is being prepared. Showing the original description.

ash1794/vibe-engineering164Updated Oct 8, 2026

Enforces tiered test coverage standards with three dimensions — line coverage by tier, spec-to-test traceability, and spec-to-code implementation mapping. Use before claiming code is complete.

The English summary is being prepared. Showing the original description.

ash1794/vibe-engineering164Updated Oct 8, 2026

Extracts and records architectural decisions from diffs, conversation context, and explicit choices. Supports automatic extraction from staged changes, deduplication against prior decisions, and persistent ADR-format logging with spec traceability. Use after a significant design or architecture choice, before committing a diff that embeds implicit decisions, or when the same question keeps resurfacing.

The English summary is being prepared. Showing the original description.

ash1794/vibe-engineering164Updated Oct 8, 2026

See all skills by ash1794

Report a problem with this skill