gao-cost

Knowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/risk in depth (see the GAO Schedule Assessment Guide), agency-specific cost models, or the full text of referenced standards (EIA-748, MIL-STD-881D, the Green Book) — these are named, not reproduced.

インストール方法を見る

含まれるファイル(14)

  • SKILL.md16.1 KB
  • chapters/ch01-gao-cost-fundamentals-credible-estimates.md19.3 KB
  • chapters/ch02-gao-cost-process-planning-program-definition.md21.9 KB
  • chapters/ch03-gao-cost-data-ground-rules-point-estimate.md25.8 KB
  • chapters/ch04-gao-cost-sensitivity-risk-uncertainty.md21.3 KB
  • chapters/ch05-gao-cost-document-present-update.md13.6 KB
  • chapters/ch06-gao-cost-auditing-validating.md13.0 KB
  • chapters/ch07-gao-cost-earned-value-management.md22.1 KB
  • chapters/ch08-gao-cost-specialized-techniques-internal-control.md24.0 KB
  • cheatsheet.md6.5 KB
  • glossary.md9.1 KB
  • LICENSE2.0 KB
  • PACK.yaml1.1 KB
  • patterns.md8.8 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

<!-- argument-hint: [characteristic, 12-step process step, estimating method, risk/uncertainty, EVM term, audit, software/learning-curve/AOA, chapter number] -->

GAO Cost Estimating and Assessment Guide (GAO-20-195G)

Source: GAO (US Government work, public domain) | Chapters: 8

When to use

Use this skill to develop, manage, or evaluate a program cost estimate: framing the estimate's purpose and scope, structuring it with a WBS, choosing estimating methods, turning a point estimate into a risk-adjusted budget, documenting and updating it, auditing it against GAO's reliability criteria, and connecting it to earned value management for execution. This is the cost-estimating companion to the GAO gao-schedule and gao-tra guides and the management-side counterpart to a program's life cycle cost estimate.

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below: the four characteristics + 18 best practices, the 12-step process, the estimating methods, risk/uncertainty, EVM, and the specialized techniques.
  • With a topic — ask about a characteristic ("credible"), a step ("ground rules and assumptions", "point estimate"), a method ("parametric", "learning curve"), a risk concept ("Monte Carlo", "confidence level", "contingency"), or an EVM term ("CPI", "EAC", "performance measurement baseline").
  • With a chapter — ch02/ch03/ch05 (the 12 steps), ch04 (risk/uncertainty), ch06 (auditing), ch07 (EVM), ch08 (specialized techniques).

Supporting files: glossary.md, patterns.md, cheatsheet.md.

One discipline, two uses. The Guide is both an authoring standard (how to build a reliable estimate) and an audit standard (how to grade one). The same four characteristics and 18 best practices serve both. EVM (ch07) is the execution-side bridge: the estimate says what a program could cost; EVM measures whether it is delivering against a baseline built from that estimate.

Core Frameworks & Mental Models

What a cost estimate is — and why reliability is a process, not luck

A cost estimate is the sum of individual cost elements, built from established methods and valid data, projecting what a program will cost in the future given what is known now. It is not a one-time deliverable — managing it means revising it as actuals arrive, adjusting it when the program changes, and analyzing the gaps. The Guide's central claim: reliability is the predictable output of a disciplined, repeatable process, not seniority or luck. A reliable estimate matters structurally for government — every dollar committed to one program is denied to another, so an unrealistic estimate can ripple cuts across a whole portfolio.

The Four Characteristics of a Reliable Cost Estimate

GAO's research identifies four characteristics that a reliable estimate exhibits. They are the assessment yardstick auditors apply, and the design targets an estimator engineers toward:

CharacteristicWhat it demands
Comprehensivefull life cycle + complete scope (a complete WBS); all GR&As documented; nothing omitted or double-counted
Well documentedsources, methods, and calculations captured so an unfamiliar analyst could rebuild it; traced to source data
Accurateunbiased (not optimistic or conservative); most-likely-cost basis; inflation-adjusted; reconciled to actuals
Crediblelimitations exposed via sensitivity and risk/uncertainty analysis; major drivers cross-checked; reconciled to an independent cost estimate (ICE)

The 18 best practices are the actionable steps that produce these characteristics; each best practice maps to one characteristic. An estimate that fully reflects all four is deemed reliable.

The 12-Step Cost Estimating Process

The procedural backbone, grouped into four phases:

  • Plan & define (Steps 1-4): (1) define the estimate's purpose — intended use fixes scope and detail; (2) develop the estimating plan — team, study plan, schedule; (3) define the program via a cost-free technical baseline description; (4) determine the estimating structure — the work breakdown structure (WBS), the product-oriented decomposition that ties cost, schedule, EVM, and risk together.
  • Build the number (Steps 5-7): (5) identify ground rules and assumptions (global + element-specific); (6) obtain the data — collect, validate, normalize (the most difficult, time-consuming step; data quality is the biggest lever); (7) develop the point estimate — select a method per WBS element, build the model, time-phase, sum, and cross-check against an ICE.
  • Quantify confidence (Steps 8-9): (8) sensitivity analysis (vary one input at a time); (9) risk and uncertainty analysis (vary many inputs together via simulation → probability distribution + confidence level).
  • Finalize & sustain (Steps 10-12): (10) document the estimate; (11) present it to management for formal approval (not finished until approved); (12) update it against actuals and program changes over the life cycle.

Each step's chapter closes with a "Survey of Step" — Process Tasks, Best Practices, and Likely Effects if criteria are not fully met — which is what makes each step auditable.

Estimating Methods

Choose by program maturity and available data; the method can differ per WBS element:

MethodUse whenTrade-off
Analogyearly; a close similar system existsfast, low data; weak without a good analog
Parametricdrivers + cost history, design still vaguerepeatable via cost estimating relationships (CERs); needs valid data range
Engineering build-upmature designmost accurate; slow and data-hungry

Supplemented by expert opinion, extrapolation from actuals (averages, EACs), and learning curves (Y = AX^b) for recurring production.

Risk and Uncertainty → a risk-adjusted budget

A point estimate alone carries no confidence information and tends to under-fund. Sensitivity analysis isolates one input at a time (ranked on a tornado chart) to find what the estimate is most responsive to. Risk and uncertainty analysis lets inputs vary together — via the three-point method (min/most-likely/max) and/or the risk-driver method (probability × cost effect, from the risk register) — driven by Monte Carlo simulation, producing a total-cost probability distribution. Reading the cumulative distribution (S curve) gives a defensible confidence level; contingency is sized as the gap between the point estimate and that level.

Earned Value Management (EVM) — measuring execution

Spending data alone misleads (the railroad example: looks under-budget while badly behind). EVM adds the missing third number — the value of work performed. Three measures: BCWS (planned value), BCWP (earned value), ACWP (actual cost). Derived indexes: CPI = BCWP/ACWP (cost), SPI = BCWP/BCWS (schedule), TCPI (efficiency needed on remaining work). The EAC forecasts total cost from cumulative CPI. The estimate is converted into a time-phased performance measurement baseline (PMB); an integrated baseline review (IBR) confirms it is executable — the crucial link between cost estimating and EVM. EVM systems are validated against EIA-748's 32 guidelines. OMB requires EVM for major acquisitions with development effort.

Specialized Techniques & Internal Control

Beyond the 12 steps: software cost estimating (size first via SLOC/function points/COSMIC, convert to effort; classify code new/reused/adapted/auto-generated); learning curves (unit vs. cumulative-average theory; Anderlohr/retrograde for production breaks); Analysis of Alternatives (AOA) (22 best practices in 5 phases; NPV where benefits monetize); WBS templates (MIL-STD-881D, NASA/DOE/PMI handbooks); and the Green Book (GAO-14-704G) internal-control framework (5 components, 17 principles) — because the cost estimating process is itself an internal control.


Chapter Index

#SectionKey content
ch01Fundamentals & the four characteristicsWhat a cost estimate is; reliability as process; the four characteristics; 18 best practices; 12-step process; LCCE; why government needs reliable estimates
ch02Steps 1-4: Planning & program definitionPurpose & scope; estimating plan/team; technical baseline description; the work breakdown structure (WBS)
ch03Steps 5-7: Ground rules, data, point estimateGlobal vs. element-specific GR&As; data collection/validation/normalization; estimating methods (analogy/parametric/build-up); cross-checks and the ICE
ch04Steps 8-9: Sensitivity, risk & uncertaintySensitivity (one-at-a-time, tornado chart); three-point & risk-driver methods; Monte Carlo; S curve, confidence level, contingency
ch05Steps 10-12: Document, present, updateDocumentation template & rationale; management approval; updating against actuals and program changes
ch06Auditing & validatingThe characteristics/best practices as gradable criteria; mapping practices to characteristics; assessing agency guidance against the 12 steps; audit criteria & data collection
ch07Earned value managementEIA-748 (32 guidelines); 13 EVM activities; PMB/IBR/CPR; BCWS/BCWP/ACWP; CPI/SPI/TCPI; EAC; OTB/OTS; EVM system acceptance
ch08Specialized techniques & internal controlSoftware cost estimating; learning curves (Anderlohr/retrograde); WBS templates; TRLs; AOA (22 practices); the Green Book (5 components, 17 principles)

Topic Index

  • 18 best practices → ch01, ch06, cheatsheet
  • Accurate (characteristic) → ch01, ch06
  • Analogy method → ch03, cheatsheet
  • Analysis of Alternatives (AOA) → ch08, ch01
  • Anderlohr / retrograde (production break) → ch08
  • Audit / validation of an estimate → ch06, patterns
  • CPI / SPI / TCPI (performance indexes) → ch07, cheatsheet
  • Comprehensive (characteristic) → ch01, ch06
  • Confidence level / S curve → ch04, cheatsheet
  • Contingency / management reserve → ch04, ch07
  • Cost estimating relationship (CER) → ch03, ch04
  • Credible (characteristic) → ch01, ch06
  • Data collection / validation / normalization → ch03
  • Documentation (Step 10) → ch05, patterns
  • Earned value management (EVM) → ch07, ch01, cheatsheet
  • EIA-748 / 32 guidelines → ch07
  • Engineering build-up method → ch03, cheatsheet
  • Estimate at completion (EAC) → ch07
  • Four characteristics (reliable estimate) → ch01, ch06, cheatsheet
  • Green Book / internal control → ch08
  • Ground rules & assumptions (GR&A) → ch03
  • Independent cost estimate (ICE) → ch03, ch05
  • Integrated baseline review (IBR) → ch07, ch08
  • Learning curve (Y = AX^b) → ch08, ch03
  • Life cycle cost estimate (LCCE) → ch01, ch02
  • Monte Carlo simulation → ch04
  • Parametric method → ch03, cheatsheet
  • Performance measurement baseline (PMB) → ch07
  • Point estimate (Step 7) → ch03
  • Present / management approval (Step 11) → ch05
  • Risk & uncertainty analysis (Step 9) → ch04, cheatsheet
  • Risk driver / risk register → ch04
  • Sensitivity analysis (Step 8) → ch04, cheatsheet
  • Software cost estimating → ch08
  • Technical baseline description (Step 3) → ch02
  • Technology readiness level (TRL) → ch08
  • Three-point estimate → ch04
  • Tornado chart → ch04
  • 12-step process → ch02, ch03, ch04, ch05, cheatsheet
  • Update the estimate (Step 12) → ch05
  • Well documented (characteristic) → ch01, ch05, ch06
  • Work breakdown structure (WBS) → ch02, ch08
  • WBS templates (MIL-STD-881D, NASA/DOE/PMI) → ch08

Supporting Files

  • glossary.md — key cost-estimating, risk, and EVM terms, alphabetical, with chapter references
  • patterns.md — reusable patterns (run the 12 steps; engineer toward the four characteristics; pick a method by maturity; convert the point estimate to a risk-adjusted budget; document/update; audit; pair with EVM; specialized techniques) with When/How/Trade-offs
  • cheatsheet.md — the 12 steps, four-characteristics table, method-selection table, risk toolkit, EVM index reference, and tells & smells

Scope & Limits

Covers: program cost estimating per the GAO Cost Estimating and Assessment Guide (GAO-20-195G, March 2020) — the four characteristics of a reliable estimate and the 18 best practices; the full 12-step cost estimating process; estimating methods (analogy, parametric, engineering build-up, learning curves); sensitivity, risk, and uncertainty analysis (Monte Carlo, confidence levels, contingency); documenting, presenting, and updating; auditing/validating an estimate against the characteristics; earned value management (EIA-748, the EVM measures and indexes, PMB, IBR, EAC forecasting, system acceptance); and specialized techniques (software cost estimating, Analysis of Alternatives, WBS templates, technology readiness levels, the Green Book internal-control framework).

Thin on / does not cover in depth: schedule estimating and schedule risk analysis — the Guide deliberately hands these to the GAO Schedule Assessment Guide (GAO-16-89G; see gao-schedule), and technology-maturity assessment to the Technology Readiness Assessment Guide (GAO-20-48G; see gao-tra). It does not reproduce the full text of referenced standards and frameworks — EIA-748, MIL-STD-881D, the Green Book (GAO-14-704G), ICEAA/AACEI/PMI standards — these are named and summarized, not copied. Embedded source figures and tables (discipline maps, WBS diagrams, worked method tables, EVM exhibits) are described/paraphrased here, not reproduced; redraw from the originals if a rendered exhibit is needed. The Guide is GAO best-practice guidance, oriented to US federal acquisitions and DoD/NASA examples; it is not a regulation, though several statutes (Weapon Systems Acquisition Reform Act, Nunn-McCurdy, FASA, Clinger-Cohen, the FAR/DFARS EVM provisions) make parts of it effectively mandatory for major acquisitions.

Jurisdiction: US Government public domain work. The guidance is voluntary best practice but is broadly adopted and partly mandated for federal major acquisitions; it is adaptable to non-federal programs.

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Signpost (not a knowledge pack) for the automotive standards landscape: ISO 26262, ASPICE, SAE J3016, UNECE R155, UNECE R156, and the NHTSA vehicle set. Contains NO source content: designation, edition, owner, status, and an official catalogue URL only. Use when you need to identify or locate an automotive standard. Most are paywalled or carry no redistribution grant and cannot be packaged; the one open path is the nhtsa-vehicle pack.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

cisa-cpg

無料

Knowledge base from CISA Cross-Sector Cybersecurity Performance Goals 2.0. Use for prioritized IT/OT baseline cyber goals aligned to NIST CSF 2.0 (including GOVERN), critical-infrastructure hygiene, MSP/supply-chain expectations, and board-friendly outcome language. Covers CPG 2.0 goals only; does not replace full CSF programs, sector-specific goals (SSGs), or CSET tooling detail.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from DAFMAN 63-119 (15 April 2021), Mission-Oriented Test Readiness Certification. Use for continuous MOTRC replacing single-point OTRR thinking: framework/applicability, Certification Official vs PM roles, review cycle and exit criteria, certification memo/decertify gates, DT&E/contractor evidence, ITT integration and cyber resiliency, and the 31-template matrix. DAF T&E readiness process only—does not replace DoDI 5000.89, AFI 99-103, or multi-service lead policies.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Systems Engineering Guidebook (OUSD R&E, February 2022). Use for the DoD SE process model — the 16 SE processes (8 technical management + 8 technical) mapped to ISO/IEC/IEEE 15288, the event-driven technical reviews and audits across the Major Capability Acquisition life cycle (ASR, SRR, SFR, PDR, CDR, SVR/FCA, PRR, PCA), the Systems Engineering Plan (SEP), risk/issue/opportunity management, TPMs and leading indicators, system-of-systems and digital engineering, and the 24 design considerations (RAM, system safety, HSI, system security engineering, MOSA, supportability, etc.). Acquisition-program oriented: thin on detailed cost estimating, contracting law, and non-DoD or commercial life cycles.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge pack from 'Towards Digital Engineering: The Advent of Digital Systems Engineering' (Huang et al., Old Dominion University, arXiv:2002.11672, 2020). Use when reasoning about digital engineering, the DoD Digital Engineering Strategy and its five goals, the Authoritative Source of Truth, digitalization vs. digitization, digital augmentation, digitalized models, provenance, unique identification, and the four-level (vision/strategy/action/foundation) DSE research framework. Covers the conceptual/vision layer of the field. SCOPE LIMITS: this is a single ~28-page vision paper, not a methods handbook — it is thin on step-by-step procedures, tooling, case studies, and quantitative evaluation, and it predates 2020 so it does not cover later digital-engineering standards or recent AI/LLM advances. Use the sebok pack for established SE canon and MBSE depth.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Digital Engineering Strategy (2018, OUSD/ODASD(SE)). Use for the Department of Defense's five digital engineering goals — (1) formalize the development, integration, and use of models; (2) provide an enduring authoritative source of truth; (3) incorporate technological innovation; (4) establish supporting infrastructure and environments; (5) transform the culture and workforce — plus their focus areas, the document-to-model and design-build-test→model-analyze-build shifts, model formalisms/provenance, governance and access control of the authoritative source of truth, and the coordinate→plan→pilot→sustain rollout. A vision-and-policy strategy, deliberately non-prescriptive. Does NOT provide a how-to method, tool tutorials, MBSE/SysML mechanics, or implementation-plan content; thin on metrics, acquisition-policy detail, and step-by-step procedure. Excludes the CAC-gated Digital Engineering Body of Knowledge (DEBoK).