Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.

インストール方法を見る

含まれるファイル(14)

  • SKILL.md15.0 KB
  • chapters/ch01-gao-schedule-introduction-reliable-schedule.md14.6 KB
  • chapters/ch02-gao-schedule-capturing-and-sequencing-activities.md26.3 KB
  • chapters/ch03-gao-schedule-resources-and-durations.md21.6 KB
  • chapters/ch04-gao-schedule-traceability-and-critical-path.md26.9 KB
  • chapters/ch05-gao-schedule-total-float-and-risk-analysis.md27.1 KB
  • chapters/ch06-gao-schedule-updating-baseline-four-characteristics.md36.9 KB
  • chapters/ch07-gao-schedule-auditing-key-questions.md25.9 KB
  • chapters/ch08-gao-schedule-evm-forward-backward-pass-reference-data.md32.5 KB
  • cheatsheet.md5.7 KB
  • glossary.md8.3 KB
  • LICENSE1.8 KB
  • PACK.yaml1.5 KB
  • patterns.md7.6 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

<!-- argument-hint: [best practice number, critical path, total float, schedule risk analysis (SRA), resource loading, duration, traceability, baseline, statusing, status date, forward/backward pass, EVM, four characteristics, audit, chapter number] -->

GAO Schedule Assessment Guide (GAO-16-89G, 2015)

Source: US Government Accountability Office (GAO) — US Government work, public domain | Chapters: 8

When to use

Use this skill when you need to build, explain, assess, or critique a program's integrated master schedule (IMS) and judge whether its forecast dates can be trusted: applying or auditing the ten best practices, computing or interpreting a critical path and total float, running or reviewing a schedule risk analysis, resource-loading and setting realistic durations, statusing against a controlled baseline, or interrogating someone else's schedule with GAO's audit questions. This is GAO's cross-government best-practice authority on schedule reliability — the time-domain companion to its Cost Estimating and Assessment Guide and to the agency SE handbooks (NASA, DoD).

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below for an overview of the ten best practices, the four characteristics, CPM, and schedule risk analysis.
  • With a topic — ask about a best practice, the critical path, total float, a schedule risk analysis, resource loading, durations, traceability, the baseline, statusing, the forward/backward pass, or EVM scheduling.
  • With a chapter — ask for ch02 (capture & sequence), ch03 (resources & durations), ch04 (traceability & critical path), ch05 (float & risk analysis), ch06 (updating, baseline & four characteristics), ch07 (auditing), or ch08 (EVM, CPM arithmetic & reference data).

Supporting files: glossary.md, patterns.md, cheatsheet.md.

Core Frameworks & Mental Models

The reliable schedule (the thesis)

A program's success rests on an integrated master schedule (IMS) — a single, dynamic network covering all effort (government, contractor, subcontractor, vendor, external) from program start to finish. The schedule is the operating instrument of program management: a route map, a progress yardstick, an early-warning system, the basis for a time-phased budget, and the foundation for cost/schedule/scope tradeoffs. The through-line of the whole guide: the reliability of the schedule determines the credibility of the dates the program forecasts — every downstream decision inherits the schedule's reliability (or lack of it).

The Ten Best Practices

GAO's central framework: ten practices "associated with a high-quality and reliable schedule," stated in no particular order and explicitly not a step-by-step build recipe.

  1. Capturing all activities — every WBS element (all parties) appears as at least one activity.
  2. Sequencing all activities — justified predecessor/successor logic so the network forecasts dates automatically.
  3. Assigning resources to all activities — labor, material, equipment, facilities, travel loaded and checked for feasibility.
  4. Establishing the duration of all activities — durations derived from effort/resources/productivity, not from a desired finish date.
  5. Verifying horizontal and vertical traceability — logical hand-offs across activities; consistent dates/status/scope across schedule levels.
  6. Confirming the critical path is valid — the path that truly drives the finish, recomputed each cycle.
  7. Ensuring reasonable total float — float that is plausible, not a symptom of broken logic.
  8. Conducting a schedule risk analysis — simulate duration uncertainty (Monte Carlo) to price the completion date and size contingency.
  9. Updating using actual progress and logic — status the schedule to a real status date so the forecast stays true.
  10. Maintaining a baseline schedule — a CM-controlled target the current schedule is measured against.

The Four Characteristics (the ten practices roll up into four)

GAO's top-level synthesis — a reliable schedule is:

  • Comprehensive — captures all activities, resources, durations (BP1, BP3, BP4).
  • Well-constructed — sound sequencing, valid critical path, reasonable float (BP2, BP6, BP7).
  • Credible — traceable and risk-informed (BP5, BP8).
  • Controlled — statused and measured against a controlled baseline (BP9, BP10).

These four are the audit lens: is everything in it? is the logic sound? does it trace and is it risk-informed? is it kept current and controlled?

Critical Path Method (CPM)

The schedule is a calculable model. The forward pass (EF = ES + duration − 1) and backward pass (LS = LF − duration + 1) deterministically yield early/late dates, total float (TF = LS − ES), and the critical path — the longest continuous chain that sets the earliest finish. Total float is both the measure of slack and a diagnostic: unreasonable float (large positive or any negative) usually means missing or invalid logic, not real room to maneuver. Near-critical activities sit just above critical-path float and can become critical with a small slip. When constraints, multiple calendars, out-of-sequence progress, or leveled resources distort float, trace the driving (longest) path back from the finish milestone instead of trusting the software-flagged path. "Critical" is precise — it means drives the finish date, never "important" or "long."

Schedule Risk Analysis (SRA)

Durations are forecasts, not facts, so the program duration is uncertain — and summing deterministic durations runs optimistic because of merge bias (converging paths multiply, not average). An SRA feeds quantified risks and uncertainties into a Monte Carlo simulation to produce an S-curve of completion dates, from which the program picks a confidence-priced date, sizes schedule contingency, and ranks the risks driving the exposure. Inputs are three-point durations and risk drivers (combine both). Contingency is PM-owned reserve under change control — categorically distinct from total float.

Statusing and the controlled baseline

A schedule earns trust only when it is continuously reconciled with reality and measured against a controlled commitment. Statusing loads actuals to a status date (the actuals/forecast boundary) and updates by remaining duration, not typed-in percent complete; out-of-sequence progress is handled with conservative retained logic. The baseline is the configuration-managed target, backed by a living schedule basis document; performance is the variance between baseline and current schedule — and that variance is only as valid as the schedule is reliable. Limit baseline changes to scope change or formal replanning; frequent rebaselining is a red flag.


Chapter Index

#SectionKey content
ch01Introduction & the Reliable ScheduleWhy schedules matter, the IMS as focal point, schedule reliability thesis, the ten best practices overview, CPM/total float/near-critical, planning vs. scheduling, the cyclic reliability process, rolling-wave planning
ch02Capturing & Sequencing Activities (BP 1–2)WBS as cornerstone, capturing all parties' work, milestones vs. detail activities, F–S logic, forbidden logic types, constraints/lags/leads, path convergence, dangling logic
ch03Resources & Durations (BP 3–4)Resource loading, effort vs. duration interdependence, BOE reconciliation, resource leveling within float, deriving durations from effort, calendars, inch-stones (QBD), durations sized to the reporting period
ch04Traceability & Critical Path (BP 5–6)Horizontal (hand-offs) and vertical (level-to-level) traceability, roll-up into the program schedule, validating the critical path each cycle, driving (longest) path, keeping the path clean, near/risk-critical paths
ch05Total Float & Risk Analysis (BP 7–8)Total/free/independent/interfering float, reasonable-float judgment, merge bias, Monte Carlo SRA & S-curve, three-point durations vs. risk drivers, contingency vs. float, remove-one-and-rerun prioritization
ch06Updating, Baseline & Four Characteristics (BP 9–10)Statusing vs. revising, status date, remaining-duration updates, retained logic vs. progress override, baseline & basis document, BEI/trend analysis, recovery/acceleration techniques, the four-characteristics mapping
ch07Auditing a Schedule (App. I–II)GAO methodology/provenance, the Appendix II audit triad (Key Questions → Key Documentation → Likely Effects), coupling of practices, documentation as proof, constraints as logic-overrides to justify
ch08EVM, CPM Arithmetic & Reference Data (App. III–IX)EVM scheduling considerations & ANSI/EIA-748 mapping, forward/backward pass math, date-constraint names & effects, quantitative health measures (no tripwires), industry/agency comparisons, the 15 artifacts to request

Topic Index

  • As-built schedule / fragnet → ch06
  • Audit triad (Key Questions / Documentation / Likely Effects) → ch07, patterns, cheatsheet
  • Baseline / baseline schedule → ch06, cheatsheet
  • Baseline Execution Index (BEI) / trend analysis → ch06
  • Best practices (the ten) → ch01, cheatsheet
  • Calendars → ch03
  • Constraints (date) / lags / leads → ch02, ch08, cheatsheet
  • Contingency (schedule reserve) → ch05, cheatsheet
  • Critical path / critical path method (CPM) → ch04, ch08, cheatsheet
  • Driving path (longest path) → ch04, cheatsheet
  • Durations (establishing) → ch03
  • Earned value management (EVM) scheduling → ch08
  • Float (total / free / independent / interfering) → ch05, cheatsheet
  • Forward / backward pass → ch08, cheatsheet
  • Four characteristics (comprehensive / well-constructed / credible / controlled) → ch06, ch01, cheatsheet
  • Horizontal traceability → ch04
  • Integrated Master Schedule (IMS) → ch01, ch02
  • Industry/agency comparisons (DCMA 14PA, NDIA PASEG, NASA, DHS) → ch08
  • Level of effort (LOE) → ch02, ch04
  • Merge bias → ch05
  • Milestones → ch02
  • Monte Carlo simulation → ch05
  • Near-critical activities → ch01, ch04
  • Out-of-sequence progress (retained logic vs. progress override) → ch06
  • Path convergence → ch02, ch05
  • Planning vs. scheduling → ch01
  • Quantitative schedule health measures → ch08
  • Rebaselining / replanning → ch06
  • Recovery & acceleration (crashing, fast tracking) → ch06
  • Resource loading / leveling → ch03, cheatsheet
  • Rolling-wave planning → ch01, ch03
  • Schedule basis document → ch06
  • Schedule narrative → ch06
  • Schedule risk analysis (SRA) → ch05, cheatsheet
  • Sequencing / logic → ch02, cheatsheet
  • Status date (data date) → ch06, cheatsheet
  • Statusing vs. revising → ch06
  • Tells & smells (unreliable schedule) → cheatsheet, ch07
  • Total float (reasonable) → ch05, cheatsheet
  • Vertical traceability → ch04
  • Work breakdown structure (WBS) → ch02, ch01

Supporting Files

  • glossary.md — key scheduling terms (IMS, CPM, total float, SRA, the four characteristics, status date, baseline, merge bias), alphabetical, with chapter references
  • patterns.md — seven reusable patterns (capture from the WBS, sequence with sound logic, resource-load & set durations, validate the critical/driving path, run an SRA & size contingency, status & control the baseline, audit with the Appendix II triad) with When/How/Trade-offs
  • cheatsheet.md — the ten best practices table, four-characteristics mapping, CPM arithmetic, logic/constraint rules, statusing & SRA quick rules, tells & smells, quantitative health & industry comparisons

Scope & Limits

Covers: GAO best practices for schedule reliability per GAO-16-89G — the integrated master schedule as the focal point of program management; the ten best practices (capturing, sequencing, resourcing, durations, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline maintenance); the four characteristics (comprehensive, well-constructed, credible, controlled); critical-path-method arithmetic (forward/backward pass, total float, the driving path); schedule risk analysis (Monte Carlo, merge bias, contingency); statusing and configuration-controlled baselines; EVM scheduling considerations; and the Appendix II audit instrument (Key Questions / Key Documentation / Likely Effects).

Does not cover in depth: cost estimating — the dollar side (see gao-cost / GAO-09-3SP, which this guide defers to for EVM and cost detail); the full systems-engineering process (see dau-se-guidebook, nasa-se-handbook, nasa-npr-7123); agile schedule assessment (see GAO's separate Agile Assessment Guide); risk management as a discipline (the guide consumes a risk register for the SRA but is not a risk-management framework — see nasa-risk); technology readiness (see gao-tra); and detailed operation of any specific scheduling tool (the guide is tool-agnostic and names tool behaviors only as cautions). The guide is also thin on portfolio/multi-program scheduling and on procurement/contracting mechanics beyond what the IMS must integrate.

Jurisdiction: US Government public domain work (GAO). The best practices are cross-government and adoptable by any organisation; they are guidance, not binding requirements outside an agency that adopts them.

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Signpost (not a knowledge pack) for the automotive standards landscape: ISO 26262, ASPICE, SAE J3016, UNECE R155, UNECE R156, and the NHTSA vehicle set. Contains NO source content: designation, edition, owner, status, and an official catalogue URL only. Use when you need to identify or locate an automotive standard. Most are paywalled or carry no redistribution grant and cannot be packaged; the one open path is the nhtsa-vehicle pack.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

cisa-cpg

無料

Knowledge base from CISA Cross-Sector Cybersecurity Performance Goals 2.0. Use for prioritized IT/OT baseline cyber goals aligned to NIST CSF 2.0 (including GOVERN), critical-infrastructure hygiene, MSP/supply-chain expectations, and board-friendly outcome language. Covers CPG 2.0 goals only; does not replace full CSF programs, sector-specific goals (SSGs), or CSET tooling detail.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from DAFMAN 63-119 (15 April 2021), Mission-Oriented Test Readiness Certification. Use for continuous MOTRC replacing single-point OTRR thinking: framework/applicability, Certification Official vs PM roles, review cycle and exit criteria, certification memo/decertify gates, DT&E/contractor evidence, ITT integration and cyber resiliency, and the 31-template matrix. DAF T&E readiness process only—does not replace DoDI 5000.89, AFI 99-103, or multi-service lead policies.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Systems Engineering Guidebook (OUSD R&E, February 2022). Use for the DoD SE process model — the 16 SE processes (8 technical management + 8 technical) mapped to ISO/IEC/IEEE 15288, the event-driven technical reviews and audits across the Major Capability Acquisition life cycle (ASR, SRR, SFR, PDR, CDR, SVR/FCA, PRR, PCA), the Systems Engineering Plan (SEP), risk/issue/opportunity management, TPMs and leading indicators, system-of-systems and digital engineering, and the 24 design considerations (RAM, system safety, HSI, system security engineering, MOSA, supportability, etc.). Acquisition-program oriented: thin on detailed cost estimating, contracting law, and non-DoD or commercial life cycles.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge pack from 'Towards Digital Engineering: The Advent of Digital Systems Engineering' (Huang et al., Old Dominion University, arXiv:2002.11672, 2020). Use when reasoning about digital engineering, the DoD Digital Engineering Strategy and its five goals, the Authoritative Source of Truth, digitalization vs. digitization, digital augmentation, digitalized models, provenance, unique identification, and the four-level (vision/strategy/action/foundation) DSE research framework. Covers the conceptual/vision layer of the field. SCOPE LIMITS: this is a single ~28-page vision paper, not a methods handbook — it is thin on step-by-step procedures, tooling, case studies, and quantitative evaluation, and it predates 2020 so it does not cover later digital-engineering standards or recent AI/LLM advances. Use the sebok pack for established SE canon and MBSE depth.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Digital Engineering Strategy (2018, OUSD/ODASD(SE)). Use for the Department of Defense's five digital engineering goals — (1) formalize the development, integration, and use of models; (2) provide an enduring authoritative source of truth; (3) incorporate technological innovation; (4) establish supporting infrastructure and environments; (5) transform the culture and workforce — plus their focus areas, the document-to-model and design-build-test→model-analyze-build shifts, model formalisms/provenance, governance and access control of the authoritative source of truth, and the coordinate→plan→pilot→sustain rollout. A vision-and-policy strategy, deliberately non-prescriptive. Does NOT provide a how-to method, tool tutorials, MBSE/SysML mechanics, or implementation-plan content; thin on metrics, acquisition-policy detail, and step-by-step procedure. Excludes the CAC-gated Digital Engineering Body of Knowledge (DEBoK).