本文へ移動
cccskills
無料GitHub で公開

mil-hdbk-61

Knowledge base from MIL-HDBK-61B, the DoD Configuration Management (CM) guidance handbook (7 April 2020, cataloged with Change 1, 2025). Use for defense CM across the acquisition and sustainment life cycle: the five CM functions (planning, identification, control/change management, status accounting, verification & audit), the three configuration baselines (FBL/ABL/PBL) and FCD→ACD→PCD documentation, configuration items (CIs/HWCI/CSCI), change instruments (ECP/NOR/RFV), the CCB and Class I/II classification, CDCA/AA authority, FCA/PCA audits, data management and data rights (CDRL/DID, DFARS rights ladder, master/authoritative source), and tailoring CM by phase (EIA-649-1 R/T/NR matrix, Appendix C templates), plus digital-era CM (digital twin, viewpoints, MOSA). NOTE: 61B is advisory guidance that adopts and points to the SAE EIA-649 / EIA-649-1 / GEIA-HB-649 suite for the authoritative CM requirements — this pack names and describes that suite but does not reproduce its copyrighted requirement text. Thin on: the EIA-649 requirement clauses themselves, form-level detail (DD-form field instructions, full DID content), and non-DoD/commercial CM frameworks.

インストール方法を見る

含まれるファイル(14)

  • SKILL.md18.9 KB
  • chapters/ch01-mil-hdbk-61-scope-fundamentals-definitions.md13.8 KB
  • chapters/ch02-mil-hdbk-61-lifecycle-management-planning.md14.6 KB
  • chapters/ch03-mil-hdbk-61-configuration-identification.md19.9 KB
  • chapters/ch04-mil-hdbk-61-configuration-control-change-management.md13.1 KB
  • chapters/ch05-mil-hdbk-61-configuration-status-accounting.md8.5 KB
  • chapters/ch06-mil-hdbk-61-configuration-verification-audit.md13.8 KB
  • chapters/ch07-mil-hdbk-61-data-management-emerging-technologies.md20.8 KB
  • chapters/ch08-mil-hdbk-61-tailoring-cm-templates-by-phase.md15.7 KB
  • cheatsheet.md8.2 KB
  • glossary.md11.3 KB
  • LICENSE2.3 KB
  • PACK.yaml1.5 KB
  • patterns.md10.3 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

<!-- argument-hint: [CM function, baseline FBL/ABL/PBL, CI, ECP/NOR/RFV, CCB, Class I/II, CDCA, FCA/PCA, data rights/CDRL, MOSA, tailoring/phase, chapter number] -->

MIL-HDBK-61B — Configuration Management

Source: DoD (US Government work, public domain; Distribution A) | Chapters: 8

When to use

Use this skill when you need to apply MIL-HDBK-61B guidance on DoD Configuration Management (CM) across the acquisition and sustainment lifecycle. It covers the five CM functions (planning, identification, control, status accounting, and verification and audit), the three configuration baselines (FBL, ABL, and PBL) and their documentation sets, configuration item selection and management, change instruments (ECP, NOR, and RFV), CCB authority and Class I/II classification, FCA/PCA audits, data management and DFARS data rights, and tailoring CM by phase using the EIA-649-1 framework. Use it when establishing or reviewing a CM program on a DoD acquisition, when classifying a proposed engineering change, or when planning configuration audits.

Prerequisites: none, plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the Core Frameworks below: the five CM functions, the three baselines, the change instruments, the audit pair, and how DM/tailoring frame them.
  • With a topic — ask about a function (identification, control, CSA, audit), a baseline (FBL/ABL/PBL), a change instrument (ECP/NOR/RFV), an authority (CCB/CDCA/AA), an audit (FCA/PCA), data rights/CDRL, MOSA, or phase tailoring (R/T/NR).
  • With a chapter — ch01 (fundamentals/definitions), ch03 (identification/baselines), ch04 (control/change), ch06 (verification/audit), ch07 (data management/digital), ch08 (tailoring/templates).

Supporting files: glossary.md, patterns.md, cheatsheet.md.

Guidance, not a requirement. 61B is advisory — it cannot be cited as a contractual obligation. DoD has adopted the SAE EIA-649 suite (EIA-649 principles, EIA-649-1 contract requirements, GEIA-HB-649 implementation guide) as its CM baseline; 61B is the DoD application-and-tailoring layer on top. For what CM requires, go to the EIA-649 suite; for how DoD applies and tailors it, stay in 61B.

Core Frameworks & Mental Models

What CM is

Configuration Management is the management process for keeping a product's performance, functional, and physical attributes consistent with its requirements, design, and operational information across its whole life — so everyone works from correct, current, traceable information. The mental model: CM guarantees a one-to-one correspondence among the physical/digital thing, the documents that define it, and the requirements it must satisfy. It is the product's single source of truth, applied across both acquisition and sustainment.

A foundational principle: responsibility cannot be delegated; authority can. The Government Program Manager owns the configuration outcome no matter how the work is parceled out to configuration managers, contractors, and oversight agencies. CM is one shared process common to Government and contractor; planning decides how the functional activities are allocated, not whether each side runs a separate process.

The five CM functions (one process, five activities)

  1. Management & Planning — the central Government activity that plans, establishes, manages, and improves the CM program and coordinates the other four. Plan the next phase during the current one.
  2. Configuration Identification — the foundation. Select CIs, document their performance/functional/physical attributes (and interfaces), assign identifiers, release documentation, and establish baselines. Everything else consumes its products.
  3. Configuration Control / Change Management — the visible heart of CM: prepare, justify, evaluate, coordinate, disposition, and implement changes and variances against CIs and their baselines.
  4. Configuration Status Accounting (CSA) — the knowledge base. Record and report the approved configuration, change status, variance status, audit results, and effectivity. CSA accumulates as a by-product of CM transactions — exhaust, not extra work.
  5. Configuration Verification & Audit — prove the built item matches its documentation and performs: FCA + PCA.

Configuration Items (CIs)

A CI is the unit of CM — an aggregation of hardware, software, or both, designated for CM and managed as a single entity that satisfies an end-use function. HWCI / CSCI are the hardware/software specializations (software items are almost always CIs because they typically control system functionality). Key discipline: defining and controlling system performance does not require designating every component as a CI. Government control reaches a lower level only when a change there would affect a Government-baselined CI specification. CI selection is an early, high-leverage, long-lived decision that sets the level of Government control for the whole life cycle.

The three baselines (the spine)

The Government takes control of configuration documentation in three progressive stages, each with its documentation set and a strict order of precedence:

BaselineCapturesDoc setEstablished
FBL (Functional)System-level performance, interoperability, interface + verificationFCDWhen FCD approved; always Government-controlled
ABL (Allocated)CI-level performance/functional/interface allocated from aboveACDPer CI; Government or contractor control
PBL (Product)Complete functional + physical definition for production/re-procurementPCDInitial per CI at CDR; finalized & validated at PCA

Order of precedence on conflict: FCD → ACD → PCD, always. The developmental configuration is the contractor's internal, evolving design before it is baselined as a PBL. Crucially, control authority is now an independent variable from the baseline itself — who approves changes (Government or contractor) is chosen per acquisition approach, phase, support, and interface needs. Control to the level necessary, no further.

Change instruments and authority

  • ECP (Engineering Change Proposal, DD 1692) — the change itself; typed Class I (Major — touches approved functional/allocated/product requirements, cost, warranties, or milestones → CCB + contract modification) or Class II (Minor — any other approved-doc change → local Government representative concurrence).
  • NOR (Notice of Revision) — pins down the precise documentary edits tied to an ECP.
  • RFV (Request for Variance, DD 1694) — bounded permission to deliver/install something off-baseline; classified minor/major/critical. Approval of all RFVs is an inherently Governmental, non-delegable function (FAR 7.503), requiring negotiated consideration (FAR 46.407).
  • CCB (Configuration Control Board) — the chartered body that dispositions Class I ECPs and major/critical variances; the PM owns CCB disposition and issues a CCBD.
  • CDCA (Current Document Change Authority) — exactly one per document; the sole content authority. AAs (Application Activities) may participate/comment but never authorize.

Routing rule: a Government-baseline document touched, or a contractor-document change affecting contractually specified performance/supportability of a Government CI → Government decides; the contractor's own documents not touching a Government baseline → contractor decides. Recurring RFVs against the same characteristic are a warning sign — fix the requirement with a Class I ECP, don't keep granting exceptions.

Verification & audit

Verification is continuous; audit is a settlement. Build configuration verification (functional + physical) into the contractor's own process — a process the Government can validate may substitute for independent physical inspection. Then audit as the program-level accounting:

  • FCA (Functional Configuration Audit) — "does it perform?" Verifies actual performance against the performance specification.
  • PCA (Physical Configuration Audit) — "does the documentation match what we deliver and support?" Verifies design documentation vs. delivered design, validates production processes, and locks down the PBL.

Run audits in three phases (pre-audit → audit → post-audit); not done until every action item closes. Expect audits in EMD and early production, not MSA/TMRR.

Data management and data rights

DM is the supply chain; CM is the warehouse. CM controls the configuration-defining subset of data; Data Management governs the full life cycle of all product-related data — what to acquire, the rights to use it, and how to store and share it. Three separate gates: order data via CDRL/DID tied to a SOW task; secure the rights (FFF and OMIT data unlimited automatically; otherwise funding source sets unlimited / Government purpose / limited-restricted); and hold the official master in a Government PDM-type system. Never substitute access for delivery. Designate one authoritative master and keep derived/transformed copies in sync. In the digital era the CM principle is constant while the artifacts widen — models, viewpoints, datasets, digital artifacts, reuse libraries, digital twins (as-built + as-maintained), and MOSA modules whose interfaces must be held under strict configuration control.

Tailoring CM by phase

CM is a menu to select from and scale, not a fixed bundle. Tailoring is subtraction from a vetted maximum, not addition from zero: start from EIA-649-1's full "shall" catalog and remove what the phase does not need, using the Figure B-1 R/T/NR matrix (Recommended / Tailorable / Not Recommended, read per phase) and the Annex A Tailoring Worksheet (usable directly in contracts). Requirements drive cost. CM intensity is a curve: process stand-up in TMRR → baselines first established and CCB online in EMD → baseline maintenance in Production → maintenance-driven recording in O&S. There is no MSA template (CM not applicable pre-Milestone A); audits are central in EMD/Production but absent in TMRR and O&S.


Chapter Index

#SectionKey content
ch01Scope, Fundamentals & DefinitionsWhat 61B is (advisory guidance adopting EIA-649); CM definition; configuration & baselines; CI/HWCI/CSCI; the five functions; Class I/II; ECP/CCB/CCBD/NOR/RFV; CDCA; nonconformance/repair/rework/retrofit; form-fit-function/interface/ICWG; digital-era terms
ch02Life-Cycle Management & PlanningCM as non-delegable Government responsibility; one shared process; CM process implementation view; top-level activity model; FBL→ABL→PBL progression; CM in SE and logistics; metrics from CSA; planning the next phase; RFP/Section L as CM levers
ch03Configuration IdentificationThe foundational activity; seven recurring tasks; CI selection; configuration documentation; the three baselines + developmental configuration; FCD→ACD→PCD precedence; identifiers (CAGE, serial/lot/part numbers); engineering release; interface management
ch04Configuration Control & Change ManagementSpan of control; why changes arise; who approves what; ECP Class I/II; RFV mechanics, approval, and consideration (FAR 7.503/46.407); NOR; CDCA and AA; control formality scaling with phase; pre-ECP communication
ch05Configuration Status Accounting (CSA)CSA as the configuration knowledge base; inputs/outputs model; activity model; the core records and reports; as-designed/built/delivered/modified views; Government vs. contractor data split; warranty data; phase inheritance; commercial CM/PDM tools
ch06Configuration Verification & AuditVerification (functional + physical) vs. audit; change verification and implementation; the three audit phases; FCA (performance) and PCA (design/documentation); audit timing by phase; certifications decoupled in performance-based buys; ISO 9000/10007 alignment
ch07Data Management & Emerging TechnologiesDM vs. CM; the three DM cost drivers; CDRL/DID; data-rights ladder (DFARS); access ≠ delivery; master/authoritative source; data as a corporate asset; model-based paradigm; digital artifacts, viewpoints, digital twins; reuse libraries; MOSA CM/DM
ch08Tailoring & CM Templates by PhaseEIA-649-1 R/T/NR applicability matrix (Figure B-1); Annex A Tailoring Worksheet; CM lifecycle requirements flow; Appendix C phase templates (TMRR/EMD/P&D/O&S); requirements drive cost; tailoring factors; benefits-vs-risks framing; no MSA template

Topic Index

  • Allocated Baseline (ABL) / ACD → ch03, ch02
  • Application Activity (AA) → ch04
  • As-built / as-delivered / as-maintained / as-designed → ch05, ch07
  • Audit (configuration), three phases → ch06
  • Baselines (FBL / ABL / PBL) → ch03, ch02, cheatsheet
  • CAGE code / document identity → ch03
  • Change classification (Class I / Class II) → ch04, ch01
  • Configuration Control Board (CCB) / CCBD → ch04, ch01
  • Configuration Item (CI / HWCI / CSCI) → ch03, ch01
  • Configuration identification → ch03
  • Configuration Status Accounting (CSA) → ch05, ch02
  • Current Document Change Authority (CDCA) → ch04, ch01
  • Data Management (DM) → ch07
  • Data rights (unlimited / Government purpose / limited / FFF / OMIT) → ch07, cheatsheet
  • CDRL / DID → ch07
  • Developmental configuration → ch03
  • Digital twin / digital artifact / digital engineering → ch07, ch01
  • Engineering Change Proposal (ECP) → ch04, ch01
  • Engineering release → ch03
  • Form, fit, function / interface → ch01, ch03
  • Functional Baseline (FBL) / FCD → ch03, ch02
  • Functional Configuration Audit (FCA) → ch06, ch01
  • Interface Control Working Group (ICWG) → ch03, ch01
  • Master / authoritative source → ch07
  • Metrics (CM, from CSA) → ch02
  • MOSA (Modular Open Systems Approach) → ch07, ch01
  • Notice of Revision (NOR) → ch04, ch01
  • Order of precedence (FCD → ACD → PCD) → ch03
  • PDM (Product Data Management) systems → ch07
  • Physical Configuration Audit (PCA) → ch06, ch01
  • Product Baseline (PBL) / PCD → ch03, ch02
  • Repair / rework / retrofit / nonconformance → ch01, ch06
  • Request for Variance (RFV) → ch04, ch01
  • Responsibility (non-delegable) vs. authority → ch02
  • SAE EIA-649 / EIA-649-1 / GEIA-HB-649 (the suite) → ch01, ch02, ch03, ch08
  • Serial / lot / part numbers → ch03
  • Tailoring (R / T / NR, Annex A worksheet) → ch08
  • Verification (configuration) → ch06
  • Viewpoint (model-based) → ch07

Supporting Files

  • glossary.md — key CM terms, alphabetical, with chapter references
  • patterns.md — 12 reusable CM techniques (adopt-and-tailor, progressive baselining, route-by-ownership, pick-the-right-instrument, CSA-as-exhaust, build-in verification, the three data gates, master/authoritative source, digital-era CM, MOSA interfaces, phase tailoring) with When/How/Trade-offs
  • cheatsheet.md — the five functions, three baselines, change instruments, FCA/PCA, CM-intensity-by-phase, tailoring flow, data-rights ladder, and tells & smells

Scope & Limits

Covers: configuration management for DoD systems per MIL-HDBK-61B across acquisition and sustainment — the five CM functions; the three baselines (FBL/ABL/PBL) and FCD→ACD→PCD documentation; CI selection and identifiers; change instruments (ECP/NOR/RFV), the CCB, Class I/II classification, and CDCA/AA authority; configuration status accounting; verification and the FCA/PCA audits; data management and data rights (CDRL/DID, DFARS rights ladder, master/authoritative source); digital-era CM (model-based, digital artifacts, viewpoints, digital twins, MOSA); and tailoring CM by life-cycle phase (the EIA-649-1 R/T/NR matrix and Appendix C phase templates).

Does not cover in depth: the authoritative CM requirements themselves — those live in the SAE EIA-649 / EIA-649-1 / GEIA-HB-649 suite that 61B adopts and points to; this pack names and describes the suite and 61B's tailoring of it but does not reproduce its copyright-protected requirement clauses. Also thin on: form-level instruction detail (DD Form 1692/1694/1423 field instructions, full DID content — deferred to ASSIST and the instruction sheets); the contractual/regulatory text behind references (DFARS Parts 27/52/227, FAR 7.503/46.407, DoD 5010.12-M, DoDI 5000.02); and non-DoD or commercial CM frameworks (for the broader SE-standards landscape see se-standards-signpost; for adjacent DoD SE process see dau-se-guidebook; for civil-space CM see nasa-npr-7123 / nasa-se-handbook).

Source version: MIL-HDBK-61B (61B, 7 April 2020), cataloged with Change 1 (15 Aug 2025). This is the current revision — not the superseded 2001 MIL-HDBK-61A(SE), whose process model and standards references are out of date. The digital-engineering, digital-twin, and MOSA material exists only in the B revision.

Jurisdiction: US Government work, public domain (not subject to copyright in the US); Distribution A (approved for public release, distribution unlimited). The handbook is advisory guidance, not a citable contractual requirement.

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Signpost (not a knowledge pack) for the automotive standards landscape: ISO 26262, ASPICE, SAE J3016, UNECE R155, UNECE R156, and the NHTSA vehicle set. Contains NO source content: designation, edition, owner, status, and an official catalogue URL only. Use when you need to identify or locate an automotive standard. Most are paywalled or carry no redistribution grant and cannot be packaged; the one open path is the nhtsa-vehicle pack.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

cisa-cpg

無料

Knowledge base from CISA Cross-Sector Cybersecurity Performance Goals 2.0. Use for prioritized IT/OT baseline cyber goals aligned to NIST CSF 2.0 (including GOVERN), critical-infrastructure hygiene, MSP/supply-chain expectations, and board-friendly outcome language. Covers CPG 2.0 goals only; does not replace full CSF programs, sector-specific goals (SSGs), or CSET tooling detail.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from DAFMAN 63-119 (15 April 2021), Mission-Oriented Test Readiness Certification. Use for continuous MOTRC replacing single-point OTRR thinking: framework/applicability, Certification Official vs PM roles, review cycle and exit criteria, certification memo/decertify gates, DT&E/contractor evidence, ITT integration and cyber resiliency, and the 31-template matrix. DAF T&E readiness process only—does not replace DoDI 5000.89, AFI 99-103, or multi-service lead policies.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Systems Engineering Guidebook (OUSD R&E, February 2022). Use for the DoD SE process model — the 16 SE processes (8 technical management + 8 technical) mapped to ISO/IEC/IEEE 15288, the event-driven technical reviews and audits across the Major Capability Acquisition life cycle (ASR, SRR, SFR, PDR, CDR, SVR/FCA, PRR, PCA), the Systems Engineering Plan (SEP), risk/issue/opportunity management, TPMs and leading indicators, system-of-systems and digital engineering, and the 24 design considerations (RAM, system safety, HSI, system security engineering, MOSA, supportability, etc.). Acquisition-program oriented: thin on detailed cost estimating, contracting law, and non-DoD or commercial life cycles.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge pack from 'Towards Digital Engineering: The Advent of Digital Systems Engineering' (Huang et al., Old Dominion University, arXiv:2002.11672, 2020). Use when reasoning about digital engineering, the DoD Digital Engineering Strategy and its five goals, the Authoritative Source of Truth, digitalization vs. digitization, digital augmentation, digitalized models, provenance, unique identification, and the four-level (vision/strategy/action/foundation) DSE research framework. Covers the conceptual/vision layer of the field. SCOPE LIMITS: this is a single ~28-page vision paper, not a methods handbook — it is thin on step-by-step procedures, tooling, case studies, and quantitative evaluation, and it predates 2020 so it does not cover later digital-engineering standards or recent AI/LLM advances. Use the sebok pack for established SE canon and MBSE depth.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Digital Engineering Strategy (2018, OUSD/ODASD(SE)). Use for the Department of Defense's five digital engineering goals — (1) formalize the development, integration, and use of models; (2) provide an enduring authoritative source of truth; (3) incorporate technological innovation; (4) establish supporting infrastructure and environments; (5) transform the culture and workforce — plus their focus areas, the document-to-model and design-build-test→model-analyze-build shifts, model formalisms/provenance, governance and access control of the authoritative source of truth, and the coordinate→plan→pilot→sustain rollout. A vision-and-policy strategy, deliberately non-prescriptive. Does NOT provide a how-to method, tool tutorials, MBSE/SysML mechanics, or implementation-plan content; thin on metrics, acquisition-policy detail, and step-by-step procedure. Excludes the CAC-gated Digital Engineering Body of Knowledge (DEBoK).

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

jgsystemsconsulting のスキルをすべて見る

このスキルの問題を報告する