Knowledge base from the DoD Manufacturing Readiness Level (MRL) Deskbook (Version 2022, OSD ManTech / Joint Service–Industry MRL Working Group). Use for assessing and managing manufacturing maturity and producibility risk in defense acquisition: the 10-level MRL scale and its non-linear, target-not-grade nature; the five demonstration environments (laboratory → production-relevant → production-representative → pilot line → production line); the nine manufacturing-risk threads and sub-threads; how MRL targets map onto Adaptive Acquisition Framework milestones (MRL 4/6/7/8/9); conducting an MRL Assessment; building a Manufacturing Maturation Plan; putting MRL maturity into contract language (Section L/M, SOW, AS6500A, DIDs); tailoring criteria for S&T, single-system, ship, sustainment, and industry contexts; and screening operational-technology cybersecurity. Manufacturing-readiness focused — it measures producibility risk and frames mitigation; it is NOT a technology-readiness (TRL) guide, a full systems-engineering process model, a cost-estimating or schedule guide, or a deep cybersecurity audit method (see sibling packs for those).

インストール方法を見る

含まれるファイル(14)

  • SKILL.md16.4 KB
  • chapters/ch01-mrl-deskbook-foundations-and-dod-policy.md9.1 KB
  • chapters/ch02-mrl-deskbook-scale-threads-and-trl-relationship.md18.4 KB
  • chapters/ch03-mrl-deskbook-adaptive-acquisition-framework.md11.9 KB
  • chapters/ch04-mrl-deskbook-conducting-assessments.md12.5 KB
  • chapters/ch05-mrl-deskbook-maturation-plans-and-risk.md9.2 KB
  • chapters/ch06-mrl-deskbook-contract-language.md12.7 KB
  • chapters/ch07-mrl-deskbook-tailoring-and-users-guide.md17.3 KB
  • chapters/ch08-mrl-deskbook-ot-cybersecurity.md12.1 KB
  • cheatsheet.md6.4 KB
  • glossary.md8.1 KB
  • LICENSE2.4 KB
  • PACK.yaml1.8 KB
  • patterns.md8.4 KB

SKILL.md(原文)

インストールする前に、エージェントに与えられる指示の中身を確認できます。

<!-- argument-hint: [MRL level, demonstration environment, manufacturing-risk thread, milestone target (MRL 4/6/7/8/9), MRL Assessment process, Manufacturing Maturation Plan (MMP), contract language (Section L/M, AS6500A, DID), tailoring (S&T/ship/single-system), OT cybersecurity, chapter number] -->

DoD Manufacturing Readiness Level (MRL) Deskbook (Version 2022)

Source: OSD Manufacturing Technology Program with the Joint Service/Industry MRL Working Group — US Government work, public domain; "not a DoD requirement... offered as a best practice." | Chapters: 8

When to use

Use this skill when you need to assess, explain, or critique the maturity and risk of a manufacturing capability in a defense (or defense-style) acquisition: assigning a Manufacturing Readiness Level, judging whether an element has reached the maturity its milestone expects, planning and conducting an MRL Assessment, building a Manufacturing Maturation Plan for a shortfall, writing MRL maturity into an RFP or contract, tailoring the criteria for a science-and-technology effort / single-system build / ship / sustainment activity / industry product line, or screening operational-technology cybersecurity on the shop floor.

Prerequisites: none — plain Markdown; no MCP server, API key, or licence tier needed at runtime.

How to Use This Skill

  • Without arguments — load the core frameworks below for an overview of the MRL 1–10 scale, the five environments, the nine threads, the milestone targets, and the assessment-to-MMP loop.
  • With a topic — ask about an MRL level, a demonstration environment, a risk thread, a milestone target, the assessment process, the MMP, contract language, tailoring, or OT cybersecurity.
  • With a chapter — ask for ch02 (the scale, threads, MRL/TRL), ch03 (milestone mapping), ch04 (conducting an assessment), ch05 (MMPs), ch06 (contract language), ch07 (tailoring), or ch08 (OT cybersecurity).

Supporting files: glossary.md, patterns.md, cheatsheet.md.

Core Frameworks & Mental Models

What an MRL is (and isn't)

A Manufacturing Readiness Level (MRL) is a 10-level ordinal scale that states how mature a manufacturing capability should be at a given point in the acquisition life cycle, and where the open manufacturing risks lie. MRLs were created because manufacturing reviews (PRRs, production-capability reviews) were structurally rigorous but used inconsistent metrics, leaving risk uncomparable across programs — a shared scale is a shared language. The scale is non-linear: the effort to climb from one level to the next is not equal. Crucially, the number is a risk-focusing target, not a grade, and an MRL Assessment is a risk-identification tool, not a go/no-go gate. Maturity is determined by working the MRL Criteria Matrix for the element — never by simply stamping a level on it.

The MRL 1–10 scale

1 basic implications identified · 2 concepts identified · 3 proof of concept · 4 produce in a laboratory environment · 5 produce prototype components in a production-relevant environment · 6 produce a prototype system in a production-relevant environment · 7 produce in a production-representative environment · 8 pilot-line capability (LRIP-ready) · 9 LRIP demonstrated (FRP-ready) · 10 FRP demonstrated, lean / continuous improvement.

The five demonstration environments

Maturity is shown in progressively more realistic settings: laboratory → production-relevant → production-representative → pilot line → production line. Each is a more demanding stage to prove the same claim — "we can build this to requirements." The responsible organization and its contractors must agree the production-realism content for each, tied to the actual risk; "production-relevant" is a stakeholder agreement for the application, not a fixed place.

The nine manufacturing-risk threads

Manufacturing risk is decomposed into nine threads (and sub-threads) so each dimension traces independently from MRL 1 to MRL 10: Technology & Industrial Base · Design · Cost & Funding · Materials · Process Capability & Control · Quality · Manufacturing Workforce · Facilities · Manufacturing Management. Hold the scale as a grid — levels across the top, threads down the side — not a thermometer. A program is at some maturity per thread; the number people quote is shorthand for the worst-supported corner.

MRL vs TRL — pace one by the other

MRLs measure manufacturing/production risk; TRLs (9 levels) measure technology/performance maturity. They are related but not one-to-one. The governing best practice is to pace manufacturing maturity by technology maturity and pull producibility concerns into technology development early — the literal meaning of "moving manufacturing left." A high TRL with ignored manufacturability, or a high MRL on an unstable design, both raise programmatic risk.

MRL targets map onto acquisition milestones

For Major Capability Acquisition: MRL 4 at MSA (on each competing solution), MRL 6 by Milestone B, MRL 7 by CDR, MRL 8 for LRIP at Milestone C, MRL 9 for FRP. Faster pathways compress this (UCA: 7→8→9 under two years; MTA Rapid Prototyping enters at MRL 4, Rapid Fielding at MRL 8). Best practice is to look forward: assess against the current target while reviewing the next level's criteria for gaps. MRL Assessments are best practice for MCA/MTA/UCA, not required for Business Systems or Services.

Assessment → Maturation Plan loop

An MRL Assessment follows an eight-activity flow (scope → taxonomy/schedule → form team → orient contractors → self-assessment → agenda → conduct → report), assesses top-down but reports bottom-up, and uses nine filtering questions to decide what to assess. Wherever an element falls below target, the assessment feeds a Manufacturing Maturation Plan (MMP) — a costed, scheduled, owned mitigation per shortfall. The assessment is the flashlight; the MMP is the work order. A low MRL early is acceptable; it tells you where to invest before the next phase. At a milestone shortfall the PM has three courses of action: delay, switch to lower-risk approach, or carry the risk forward with a funded MMP.

Making maturity binding, and tailoring it

The Criteria Matrix is descriptive, not directive — it grades maturity but does not task work. Tasking comes from AS6500A plus RFP Section L (what to submit) / Section M (how it's scored) / the SOW "shall" statements. Tailoring the criteria to context (S&T, single/limited system, ship, sustainment, industry) is legitimate and expected, but bounded by three rules: keep traceability to the criteria, document and justify any criterion you cannot assess, and rely on trained SMEs — because tailoring out a criterion silently buries a known-unknown risk.


Chapter Index

#SectionKey content
ch01Foundations & DoD PolicyWhy MRLs exist (GAO findings, uncomparable metrics), what an MRA does, the PQM lead under DoDI 5000.88, phase-gated maturity, statutory/DFARS/NTIB basis, "responsible organization"
ch02The Scale, Threads & MRL–TRL RelationshipMRL 1–10 per-level definitions, the non-linear ordinal nature, the five environments, manufacturability vs producibility, the nine threads/sub-threads, MRL vs TRL, critical technologies
ch03MRLs in the Adaptive Acquisition FrameworkAAF pathways (MCA/MTA/UCA/Business/Services), MRL-to-milestone mapping (4/6/7/8/9), the three courses of action on a shortfall, ITRA/SETR feed, MMP as a feeder
ch04Conducting MRL AssessmentsThe eight-activity flow (Figure 4-1), nine filtering questions, on-site selection, team independence, contractor self-assessment, the deep dive, top-down assess / bottom-up report, the ten-element report
ch05Manufacturing Maturation Plans & RiskThe MMP as the product of an assessment, the 12-item MMP outline, fallbacks with expiry dates, supplier/sub-tier risk, five risk-management best practices, not trusting the contractor alone (DCMA)
ch06Applying MRLs in Contract LanguageCriteria Matrix as non-directive, AS6500A tasking, RFP Section L/M, SOW "shall" statements, AS9100D/ISO 9001/IATF 16949 quality, DIDs (DI-MGMT-81889B etc.) on DD Form 1423, flow-down, FAR/DFARS floor
ch07Tailoring Criteria & the MRL Users GuideThe Excel Users Guide (six worksheets, six-field pop-ups), tailoring rules, S&T anchors, Sustainment Maturity Levels / Depot Activation, single/limited-system and space front-loading, the Navy ship 2-pass 6-gate map, industry adoption
ch08Operational Technology CybersecurityOT defined (NIST SP 800-37), OT vs IT/PIT/MIS, Federal vs Non-Federal System routing, NIST SP 800-53/171/82, FAR/DFARS clauses, SPRS, CMMC as wrapper not source, PTAC/MEP/CSET for small manufacturers

Topic Index

  • MRL — definition, non-linear ordinal scale, target-not-grade → ch02, ch01
  • Why MRLs exist / GAO rationale / policy basis → ch01
  • PQM lead / DoDI 5000.88 responsibilities → ch01, ch03
  • Responsible organization → ch01
  • MRL 1–10 per-level definitions → ch02, cheatsheet
  • Demonstration environment (laboratory / production-relevant / production-representative / pilot line / production line) → ch02, cheatsheet
  • Manufacturability vs producibility → ch02
  • Nine manufacturing-risk threads and sub-threads → ch02, cheatsheet
  • MRL vs TRL relationship / moving manufacturing left → ch02, cheatsheet
  • Critical technology (CT) → ch02
  • Adaptive Acquisition Framework / pathways (MCA, MTA, UCA) → ch03, cheatsheet
  • MRL-to-milestone target mapping (MRL 4/6/7/8/9) → ch03, cheatsheet
  • Three courses of action on a milestone shortfall → ch03, ch05
  • Materiel Solution Analysis / TMRR / EMD phases → ch03
  • Rapid Prototyping / Rapid Fielding (MTA) → ch03
  • Urgent Capability Acquisition (UCA) targets → ch03
  • ITRA / SETR / MRL Assessment as a feeder → ch03
  • MRL Assessment process / eight-activity flow → ch04, patterns
  • Taxonomy / what to assess / nine filtering questions → ch04
  • On-site selection / site-visit agenda → ch04
  • Contractor self-assessment → ch04
  • Deep dive (sub-component examination) → ch04
  • Top-down assess, bottom-up report / weakest-link rollup → ch04
  • MRL Assessment report (ten elements) → ch04
  • Manufacturing Maturation Plan (MMP) / 12-item outline → ch05, cheatsheet
  • Fallbacks and the latest decision date → ch05
  • Supplier and sub-tier risk → ch05, ch06
  • Risk-management best practices / DCMA independence → ch05, ch04
  • MRL Criteria Matrix (descriptive, not directive) → ch06, ch02
  • AS6500A manufacturing-management tasking → ch06
  • RFP Section L and Section M → ch06
  • Statement of Work (SOW) "shall" statements → ch06
  • AS9100D / ISO 9001 / IATF 16949 quality standards → ch06
  • Data Item Descriptions (DIDs) / DD Form 1423 CDRL → ch06
  • Requirements flow-down to suppliers → ch06
  • Tailoring the MRL criteria → ch07, patterns
  • MRL Users Guide (Excel worksheets, pop-ups, questionnaire) → ch07
  • Science & Technology (S&T) MRL anchors → ch07
  • Sustainment Maturity Levels (SML) / Depot Activation → ch07
  • Single or limited system acquisition / space systems → ch07
  • Ship acquisition / Navy 2-pass 6-gate → ch07
  • Gated Product Development / industry adoption → ch07
  • Operational Technology (OT) cybersecurity → ch08, patterns
  • OT defined (NIST SP 800-37) / OT vs IT → ch08
  • Federal vs Non-Federal System routing → ch08
  • NIST SP 800-53 / 800-171 / 800-82 → ch08
  • DMZ / layered networks / ICS security concepts → ch08
  • SPRS / DFARS 252.204-7019 7020 → ch08
  • CMMC as certification wrapper, not source → ch08
  • PTAC / MEP / CSET small-manufacturer support → ch08

Supporting Files

  • glossary.md — key MRL terms (MRL, MRA/Assessment, Criteria Matrix, the five environments, the nine threads, MMP, AS6500A, OT, SML, tailoring), alphabetical, with chapter references
  • patterns.md — reusable patterns (map MRL targets to milestones, run the eight-activity flow, resist single-number/weakest-link rollups, build an MMP per shortfall, decide at a shortfall, put maturity into the contract, tailor without burying risk, screen OT cybersecurity) with When / How / Trade-offs
  • cheatsheet.md — MRL 1–10 table, the five environments, the nine threads, MRL vs TRL, pathway targets, milestone-target decision rules, and tells & smells

Scope & Limits

Covers: DoD best practices for assessing and managing manufacturing maturity and producibility risk per the MRL Deskbook (Version 2022) — the MRL 1–10 scale and its non-linear, target-not-grade nature; the five demonstration environments; the nine manufacturing-risk threads and sub-threads; the manufacturability/producibility distinction; how MRL targets map onto Adaptive Acquisition Framework milestones across MCA/MTA/UCA; conducting an MRL Assessment and reporting it; building a Manufacturing Maturation Plan; embedding MRL maturity in contract language (Section L/M, the SOW, AS6500A, the quality standards, DIDs/CDRLs); tailoring the criteria for S&T, single/limited-system, ship, sustainment, and industry contexts; and screening operational-technology cybersecurity in the assessment.

Thin or silent on (where the source itself is light): the MRL Criteria Matrix and MRL Users Guide content themselves are not reproduced — the Deskbook points to the separately distributed Appendix A matrix and the Excel Users Guide for the per-thread, per-level criteria text, so this pack carries the framework and how to use it, not the cell-by-cell criteria. It is not a technology-readiness (TRL) guide (see gao-tra, which this pack deepens on the manufacturing side); not a full systems-engineering process model (see dau-se-guidebook, nasa-se-handbook, nasa-npr-7123); not a cost-estimating or schedule guide (see the GAO cost/schedule packs); and not a deep cybersecurity-audit method — Chapter 8 is an explicit top-level screen for major OT gaps, deferring to NIST SP 800-37/53/171/82 and CMMC for the actual controls and certification.

Jurisdiction: US DoD acquisition context. The Deskbook is explicitly "not a DoD requirement... offered as a best practice," and is tailorable to industry — the methods are adoptable by any organisation managing manufacturing risk, but the milestone, statute, FAR/DFARS, and clause references are DoD-specific.

Source version: Manufacturing Readiness Level (MRL) Deskbook, Version 2022 (1 October 2022 update), OSD Manufacturing Technology Program with the Joint Service/Industry MRL Working Group.

レビュー

まだレビューはありません。使ってみた感想をお寄せください。

同じリポジトリのスキル

概要と使いどころ

Signpost (not a knowledge pack) for the automotive standards landscape: ISO 26262, ASPICE, SAE J3016, UNECE R155, UNECE R156, and the NHTSA vehicle set. Contains NO source content: designation, edition, owner, status, and an official catalogue URL only. Use when you need to identify or locate an automotive standard. Most are paywalled or carry no redistribution grant and cannot be packaged; the one open path is the nhtsa-vehicle pack.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

cisa-cpg

無料

Knowledge base from CISA Cross-Sector Cybersecurity Performance Goals 2.0. Use for prioritized IT/OT baseline cyber goals aligned to NIST CSF 2.0 (including GOVERN), critical-infrastructure hygiene, MSP/supply-chain expectations, and board-friendly outcome language. Covers CPG 2.0 goals only; does not replace full CSF programs, sector-specific goals (SSGs), or CSET tooling detail.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from DAFMAN 63-119 (15 April 2021), Mission-Oriented Test Readiness Certification. Use for continuous MOTRC replacing single-point OTRR thinking: framework/applicability, Certification Official vs PM roles, review cycle and exit criteria, certification memo/decertify gates, DT&E/contractor evidence, ITT integration and cyber resiliency, and the 31-template matrix. DAF T&E readiness process only—does not replace DoDI 5000.89, AFI 99-103, or multi-service lead policies.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Systems Engineering Guidebook (OUSD R&E, February 2022). Use for the DoD SE process model — the 16 SE processes (8 technical management + 8 technical) mapped to ISO/IEC/IEEE 15288, the event-driven technical reviews and audits across the Major Capability Acquisition life cycle (ASR, SRR, SFR, PDR, CDR, SVR/FCA, PRR, PCA), the Systems Engineering Plan (SEP), risk/issue/opportunity management, TPMs and leading indicators, system-of-systems and digital engineering, and the 24 design considerations (RAM, system safety, HSI, system security engineering, MOSA, supportability, etc.). Acquisition-program oriented: thin on detailed cost estimating, contracting law, and non-DoD or commercial life cycles.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge pack from 'Towards Digital Engineering: The Advent of Digital Systems Engineering' (Huang et al., Old Dominion University, arXiv:2002.11672, 2020). Use when reasoning about digital engineering, the DoD Digital Engineering Strategy and its five goals, the Authoritative Source of Truth, digitalization vs. digitization, digital augmentation, digitalized models, provenance, unique identification, and the four-level (vision/strategy/action/foundation) DSE research framework. Covers the conceptual/vision layer of the field. SCOPE LIMITS: this is a single ~28-page vision paper, not a methods handbook — it is thin on step-by-step procedures, tooling, case studies, and quantitative evaluation, and it predates 2020 so it does not cover later digital-engineering standards or recent AI/LLM advances. Use the sebok pack for established SE canon and MBSE depth.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the DoD Digital Engineering Strategy (2018, OUSD/ODASD(SE)). Use for the Department of Defense's five digital engineering goals — (1) formalize the development, integration, and use of models; (2) provide an enduring authoritative source of truth; (3) incorporate technological innovation; (4) establish supporting infrastructure and environments; (5) transform the culture and workforce — plus their focus areas, the document-to-model and design-build-test→model-analyze-build shifts, model formalisms/provenance, governance and access control of the authoritative source of truth, and the coordinate→plan→pilot→sustain rollout. A vision-and-policy strategy, deliberately non-prescriptive. Does NOT provide a how-to method, tool tutorials, MBSE/SysML mechanics, or implementation-plan content; thin on metrics, acquisition-policy detail, and step-by-step procedure. Excludes the CAC-gated Digital Engineering Body of Knowledge (DEBoK).

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

jgsystemsconsulting のスキルをすべて見る

このスキルの問題を報告する