Operate a live AWS workload with AWS DevOps Agent — incident investigation, root-cause analysis, and release-readiness review — for startups with no dedicated DevOps or SRE engineer. Use when a live AWS workload is misbehaving (production is down, 5xx errors, latency spike, timeouts, it broke after the last deploy, an alarm fired, a pasted CloudWatch alarm or stack trace, find the root cause, write a postmortem, no one on call), for pre-merge review (is this PR safe to ship, blast radius), or to set up, pause, stop, or check the cost of AWS DevOps Agent. Detects existing setup first and never re-onboards. Cost, account access, and code egress are each disclosed in one line with safe defaults: cost and access proceed, code egress stays off unless asked. Do not use for: new architecture (architect-for-startups), scaffolding (start-building-for-startups), migrations (gcp-to-aws, azure-to-aws, heroku-to-aws, llm-to-bedrock), or general Activate and credits questions (knowledge-base-for-startups).
日本語の概要は準備中です。原文の説明を表示しています。
aws/agent-toolkit-for-aws☆ 2,8632026年10月13日 更新
Debug live Azure Kubernetes Service (AKS) incidents with a read-only, evidence-first investigation. WHEN: pod crashes or Pending, CrashLoopBackOff, OOMKilled, ImagePullBackOff, node NotReady, DNS or ingress failure, connectivity timeout, network policy, SNAT exhaustion, node-pool scaling blocked by QuotaExceeded or InsufficientVCPUQuota, upgrade stuck, spot or zone disruption, a bare VMExtensionProvisioningError or AllocationFailed wrapper, an uncataloged capacity symptom, or 'investigate my AKS cluster'. DO NOT USE FOR: packet capture (use aks-network-capture); GPU or model-serving issues (use aks-gpu-inference); cluster creation or provisioning (use azure-kubernetes); cost (use cost-analysis from the optional azure-cost plugin); pod rightsizing (use azure-kubernetes); a fully qualified documented AKS signature with every required nested qualifier (use aks-known-issues); standalone failures on non-AKS Azure resources (use azure-diagnostics). Unqualified errors and open-ended incidents stay here only for AKS.
日本語の概要は準備中です。原文の説明を表示しています。
microsoft/azure-skills☆ 1,5632026年10月13日 更新
Amazon profit margin calculator for sellers. Calculate cost breakdowns, profit margins, break-even points, and get pricing recommendations. Supports single product analysis and batch calculations. Input product cost, shipping, FBA fees, and get instant profitability analysis. No API key required. Use when: (1) evaluating new product profitability before sourcing, (2) diagnosing existing product margins, (3) adjusting pricing strategy, (4) analyzing multiple SKUs at once.
日本語の概要は準備中です。原文の説明を表示しています。
nexscope-ai/eCommerce-Skills☆ 1,1332026年8月26日 更新
Supply Chain Bottleneck Analyzer for Shopify/DTC stores. Diagnose cash flow, inventory, shipping costs, and customer acquisition efficiency. Includes CAC/LTV analysis, 3PL cost optimization, and ad spend benchmarks. No API key required for basic analysis.
日本語の概要は準備中です。原文の説明を表示しています。
nexscope-ai/eCommerce-Skills☆ 1,1332026年8月26日 更新
Produce a scoped CCAM cost and token report by model, provider, source, and session. Use for spend reviews, model-mix analysis, unpriced usage detection, or export-friendly cost summaries.
日本語の概要は準備中です。原文の説明を表示しています。
hoangsonww/Claude-Code-Agent-Monitor☆ 1,0692026年10月12日 更新
Matter budgeting and ongoing WIP/variance monitoring. Build phase-based fee estimates at matter setup, run bottom-up budgets by jurisdiction or workstream, calculate contingency, and structure AFA arrangements (fixed fee, capped fee, phased fixed fees). Ongoing monitoring: WIP tracking against budget, proportionality assessment (spend vs progress), variance commentary with root cause analysis, forecast-to-complete, realisation monitoring, write-off analysis. Trigger on: 'build a budget', 'fee estimate', 'what will this cost', 'WIP review', 'budget vs actual', 'how are we tracking against budget', 'we're over budget', 'realisation is poor', 'what's our ETC', 'budget for the German workstream', 'model the financial impact of this scope change', 'draft a fee adjustment', 'write-off analysis', 'how much contingency', 'AFA structure', 'fixed fee estimate', 'budget update', 'forecast to complete'.
日本語の概要は準備中です。原文の説明を表示しています。
lawve-ai/awesome-legal-skills☆ 8632026年10月3日 更新
Calculate comprehensive ROI for AI implementation projects. Takes current costs, manual process time, team size, and hourly rates. Generates detailed roi-analysis.md with executive summary, cost-benefit tables, sensitivity analysis, break-even timeline, and comparison scenarios. Use when evaluating AI investments, building business cases, or justifying automation spend.
日本語の概要は準備中です。原文の説明を表示しています。
OneWave-AI/claude-skills☆ 3402026年10月2日 更新
Comprehensive AWS cost analysis and optimization recommendations using AWS CLI and Cost Explorer
日本語の概要は準備中です。原文の説明を表示しています。
lingxling/awesome-skills-cn☆ 3062026年10月7日 更新
Evaluates health insurance plan structures with actuarial value, network analysis, and cost projection. Use when analyzing health plans, comparing coverage, or projecting healthcare costs.
日本語の概要は準備中です。原文の説明を表示しています。
FDU-INS/Insurance-Skills☆ 762026年7月12日 更新
Evaluates life insurance product structures with cash value analysis, cost comparisons, and suitability assessment. Use when analyzing life products, comparing insurance costs, or assessing product suitability.
日本語の概要は準備中です。原文の説明を表示しています。
FDU-INS/Insurance-Skills☆ 762026年7月12日 更新
Corporate finance fundamentals for evaluating business decisions under cost, time, and risk constraints. Covers time value of money, net present value, internal rate of return, payback period, break-even analysis, cost-benefit analysis, debt vs equity, working capital, and the basic financial statements. Use when evaluating an investment, sizing a funding round, structuring a capital stack, or reading a balance sheet.
日本語の概要は準備中です。原文の説明を表示しています。
Tibsfox/gsd-skill-creator☆ 712026年7月20日 更新
Deconstructs structured note payoffs with embedded option identification, issuer credit risk, and all-in cost analysis. Use when analyzing structured notes, evaluating embedded options, or assessing structured product costs.
日本語の概要は準備中です。原文の説明を表示しています。
CaseMark/skills☆ 442026年9月9日 更新
Quantifies revenue and cost synergies with build-up methodology, realization timelines, and integration cost offsets. Use when estimating deal synergies, modeling cost savings, or building synergy cases for IC.
日本語の概要は準備中です。原文の説明を表示しています。
CaseMark/skills☆ 442026年9月9日 更新
Evaluates asset retirement and decommissioning liabilities with cost estimation, timing analysis, and funding adequacy assessment. Use when analyzing decommissioning costs, evaluating ARO exposure, or assessing abandonment liability.
日本語の概要は準備中です。原文の説明を表示しています。
CaseMark/skills☆ 442026年9月9日 更新
Render a dashboard of the current Claude Code session — message counts, token usage, cache read/write, dollar cost, context %, lines changed, cost-per-turn sparkline, and a tool-call histogram — parsed from the session transcript JSONL by a bundled bash script. One bash call, zero analysis, zero confirmation. Optionally pass a session id to inspect a different session. Use when the user asks for session stats, usage, token or cost breakdown, or a session dashboard.
日本語の概要は準備中です。原文の説明を表示しています。
foyzulkarim/skills☆ 432026年9月4日 更新
Use when a task needs the judgment of an Environmental Economist — valuing a non-market environmental good (clean air, a wetland, an endangered species) for a benefit-cost analysis, building a regulatory impact analysis (RIA) for a pollution rule, sizing natural resource damages after a spill or contamination event, or picking a discount rate for a policy with cost and benefit streams decades apart.
日本語の概要は準備中です。原文の説明を表示しています。
wonsukchoi/domain-experts☆ 212026年10月12日 更新
Use when a task needs the judgment of a Compensation, Benefits, and Job Analysis Specialist — market-pricing a job against salary survey data, scoring a job through a point-factor or IPE job evaluation, running a pay-equity regression or cohort analysis, building or refreshing a salary structure and compa-ratio bands, classifying a job family's FLSA exemption status through the duties test, or modeling benefits plan cost (loss ratio, PEPM, self-funded vs. fully insured). Distinct from hr-people-manager (owns the comp/leveling judgment calls — whether to approve an exception, promote someone into a level), hr-specialist (owns individual-case leave/I-9/ADA/FLSA reclassification for one employee's drifted duties), and compensation-benefits-manager (owns pay philosophy, negotiation-range policy, and the department that runs this work). This role owns the mechanics: the survey match, the point score, the regression, the band math — the analysis those upstream policy and downstream judgment calls are made against.
日本語の概要は準備中です。原文の説明を表示しています。
wonsukchoi/domain-experts☆ 212026年10月12日 更新
Analyzes infrastructure costs at 1K-100K user scales by reading the actual codebase, auto-detecting cloud providers, modeling per-action costs, and projecting total monthly spend with optimization recommendations.
日本語の概要は準備中です。原文の説明を表示しています。
tinh2/skills-hub-registry☆ 202026年9月5日 更新
Analyze budget vs. actual variances, identify root causes, and recommend corrective actions. Use when an accountant or finance professional says "explain this variance", "budget vs. actual analysis", "why did we miss budget", "favorable / unfavorable variance", "price volume variance", "management reporting commentary", "explain the P&L variance to the CFO", "what drove the cost overrun", "revenue shortfall analysis", or needs to write the narrative behind a financial result. Also trigger when someone shares a table of actuals vs. budget and needs to explain the gaps - even if they don't use the word "variance".
日本語の概要は準備中です。原文の説明を表示しています。
qa-aman/claude-skills☆ 202026年10月13日 更新
This skill provides AWS cost optimization, monitoring, and operational best practices with integrated MCP servers for billing analysis, cost estimation, observability, and security assessment.
日本語の概要は準備中です。原文の説明を表示しています。
lilinji/GeneTind-Life-Skills☆ 142026年8月21日 更新
Comprehensive AWS cost analysis and optimization recommendations using AWS CLI and Cost Explorer
日本語の概要は準備中です。原文の説明を表示しています。
sinhoneyy/master-skills☆ 142026年9月5日 更新
Comprehensive AWS cost analysis and optimization recommendations using AWS CLI and Cost Explorer
日本語の概要は準備中です。原文の説明を表示しています。
JantonioFC/skillsbank☆ 92026年8月4日 更新
Knowledge base from the NASA Schedule Management Handbook (2024 edition, Revision 2). Use for program/project schedule management of aerospace and large engineering efforts: the five sub-functions (Planning, Development, Assessment & Analysis, Maintenance & Control, Documentation & Communication); the Integrated Master Schedule (IMS) and the WBS/OBS/CBS breakdown structures; the Schedule Management Plan (SMP) and Basis of Estimate (BoE); Critical Path Method, logic, durations, float and margin; tiered schedule assessment (Requirements/Health/Basis checks, the Shock Test) and the Dimensions of Schedule Reliability; Schedule Risk Analysis (SRA), Integrated Cost-Schedule Risk Analysis (ICSRA), Monte Carlo, correlation, merge bias, and the Joint Confidence Level (JCL); baselining, replan vs. rebaseline, EVM schedule metrics (SPI, BEI, CEI, HMI, Earned Schedule, CPLI), and status/progress/forecast reporting. This is NASA's scheduling doctrine grounded in NPR 7120.5 and the GAO Schedule Assessment Guide. Thin on the underlying mechanics of CPM, statistics, and EVM (it points to companion handbooks); aerospace/space-flight-centric; anchored to the 2024 second edition.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月9日 更新
Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月9日 更新