本文へ移動
cccskills

「monte carlo」の検索結果

85 件 ・ 関連度順

概要と使いどころ

Audit risk simulation and decision support systems for Monte Carlo modeling quality, wargaming analysis, threat assessment, mission planning support, and course-of-action decision analysis..

日本語の概要は準備中です。原文の説明を表示しています。

tinh2/skills-hub-registry202026年9月5日 更新

Audit retirement planning software for projection model accuracy, asset allocation by age, Social Security optimization, tax-advantaged account strategy, withdrawal sequencing including Roth conversion ladders, Monte Carlo simulation quality, and inflation adjustment methodology..

日本語の概要は準備中です。原文の説明を表示しています。

tinh2/skills-hub-registry202026年9月5日 更新

Audit litigation analytics and case outcome prediction systems -- ML outcome models (logistic regression, gradient boosting, neural nets with temporal train/test splits), settlement range modeling (Monte Carlo simulation, comparable case matching, BATNA analysis).

日本語の概要は準備中です。原文の説明を表示しています。

tinh2/skills-hub-registry202026年9月5日 更新

Quantify cyber risk using FAIR methodology with Monte Carlo simulation, assess control effectiveness against NIST CSF/CIS/ISO 27001 frameworks, evaluate risk appetite alignment, and analyze cyber insurance coverage adequacy..

日本語の概要は準備中です。原文の説明を表示しています。

tinh2/skills-hub-registry202026年9月5日 更新

Strategic patterns for solving intractable problems through cascading approximation, self-improvement, and heterogeneous evaluation from DeepMind's AlphaGo system

日本語の概要は準備中です。原文の説明を表示しています。

curiositech/windags-skills142026年10月12日 更新

> Game theory, Monte Carlo simulations, behavioral economics, and competitive war gaming.

日本語の概要は準備中です。原文の説明を表示しています。

luokai0/ai-agent-skills-by-luo-kai122026年5月6日 更新

faa-rma

無料

Knowledge base from FAA-HDBK-006D (2020), the FAA's System Reliability, Maintainability, and Availability (RMA) Handbook for National Airspace System (NAS) hardware and software. Use for RMA figures of merit (MTBF, MTBO, MTTR, the availability variants), the bathtub curve and probability distributions, the four-stage RMA lifecycle mapped to the FAA Acquisition Management System (AMS), the six-task RMA technical-management/acquisition process, service-thread criticality and the NAS-RD severity-to-target table, the RMA analysis toolbox (RBD, FMEA/FMECA, FTA, Ishikawa, Monte Carlo, Bayesian, FRACAS, ALT, reliability-growth/recovery tests), software reliability (early prediction + reliability growth), and tailorable example RMA requirements for a Program Requirements Document. Scope limits: it is FAA/NAS-specific guidance (not a requirement, by its own statement), centred on hardware-plus-software availability — it brackets out human/service/facility/communications availability, names but does not reproduce the math derivations or external standards (MIL-STDs, IEEE 1633, RTCA DO-178C/DO-278A, SAE JA1011), is thin on detailed worked numerical examples and on safety-case method, and predates any current revision beyond 006D.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

gao-cost

無料

Knowledge base from the GAO Cost Estimating and Assessment Guide (GAO-20-195G). Use for program cost estimating: the four characteristics of a reliable estimate (comprehensive, well documented, accurate, credible) and the 18 best practices; the 12-step cost estimating process (purpose, plan, technical baseline, WBS, ground rules and assumptions, data, point estimate, sensitivity, risk/uncertainty, document, present, update); estimating methods (analogy, parametric, engineering build-up, learning curves); Monte Carlo risk/uncertainty analysis, confidence levels and contingency; auditing and validating an estimate against the characteristics; earned value management (EIA-748, BCWS/BCWP/ACWP, CPI/SPI/TCPI, EAC, PMB, IBR); and specialized techniques (software cost estimating, learning curves, Analysis of Alternatives, WBS templates, the Green Book internal-control framework). This is the cost-estimating companion to the GAO Schedule and Technology Readiness Assessment guides. Does not cover schedule estimating/risk in depth (see the GAO Schedule Assessment Guide), agency-specific cost models, or the full text of referenced standards (EIA-748, MIL-STD-881D, the Green Book) — these are named, not reproduced.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

Knowledge base from the NASA Schedule Management Handbook (2024 edition, Revision 2). Use for program/project schedule management of aerospace and large engineering efforts: the five sub-functions (Planning, Development, Assessment & Analysis, Maintenance & Control, Documentation & Communication); the Integrated Master Schedule (IMS) and the WBS/OBS/CBS breakdown structures; the Schedule Management Plan (SMP) and Basis of Estimate (BoE); Critical Path Method, logic, durations, float and margin; tiered schedule assessment (Requirements/Health/Basis checks, the Shock Test) and the Dimensions of Schedule Reliability; Schedule Risk Analysis (SRA), Integrated Cost-Schedule Risk Analysis (ICSRA), Monte Carlo, correlation, merge bias, and the Joint Confidence Level (JCL); baselining, replan vs. rebaseline, EVM schedule metrics (SPI, BEI, CEI, HMI, Earned Schedule, CPLI), and status/progress/forecast reporting. This is NASA's scheduling doctrine grounded in NPR 7120.5 and the GAO Schedule Assessment Guide. Thin on the underlying mechanics of CPM, statistics, and EVM (it points to companion handbooks); aerospace/space-flight-centric; anchored to the 2024 second edition.

日本語の概要は準備中です。原文の説明を表示しています。

jgsystemsconsulting/jgs-se-knowledge-packs82026年10月9日 更新

AiZynthFinder retrosynthetic route planning (CASP) from AstraZeneca Molecular AI. Monte Carlo tree search guided by a template-based neural expansion policy recursively disconnects a target SMILES until precursors are found in a purchasable stock. Covers config.yml (v4 format), aizynthcli batch screening, the AiZynthFinder/AiZynthExpander Python API, one-step disconnections, custom stocks via smiles2stock, scorers, Retro*/breadth-first/DFPN search alternatives, and reading output.json.gz / trees.json. Use for synthesis route planning, synthesizability screening, and building-block/precursor search. For reaction barriers use neb-irc-activation-energy; for 2D reaction scheme drawing use rdkit-chemdraw-cdxml.

日本語の概要は準備中です。原文の説明を表示しています。

bg-szy/TOP-SKILLS62026年9月8日 更新

This skill provides an advanced financial modeling suite with DCF analysis, sensitivity testing, Monte Carlo simulations, and scenario planning for investment decisions

日本語の概要は準備中です。原文の説明を表示しています。

David-Li0406/meta-skill-evloving22026年7月14日 更新

Production-grade AI trading agent for cryptocurrency markets with advanced mathematical modeling, multi-layer validation, probabilistic analysis, and zero-hallucination tolerance. Implements Bayesian inference, Monte Carlo simulations, advanced risk metrics (VaR, CVaR, Sharpe), chart pattern recognition, and comprehensive cross-verification for real-world trading application.

日本語の概要は準備中です。原文の説明を表示しています。

danstrem2/clawdbot-skill-master-pack22026年2月1日 更新