Knowledge base from MIL-HDBK-516C (Airworthiness Certification Criteria). Use for DoD air-system airworthiness planning: tailoring a certification basis, systems engineering criteria, and domain clusters for structures, flight technology, propulsion/installation, avionics/electrical/E3/diagnostics, computer systems/software, and crew systems (including applicable UAS control-station elements). Qualitative guidance handbook — not raw contractual requirements. Does not replace service airworthiness authority policy, civil FAA certification rules as authorities, or detailed JSSG/MIL performance specs.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from MIL-HDBK-61B, the DoD Configuration Management (CM) guidance handbook (7 April 2020, cataloged with Change 1, 2025). Use for defense CM across the acquisition and sustainment life cycle: the five CM functions (planning, identification, control/change management, status accounting, verification & audit), the three configuration baselines (FBL/ABL/PBL) and FCD→ACD→PCD documentation, configuration items (CIs/HWCI/CSCI), change instruments (ECP/NOR/RFV), the CCB and Class I/II classification, CDCA/AA authority, FCA/PCA audits, data management and data rights (CDRL/DID, DFARS rights ladder, master/authoritative source), and tailoring CM by phase (EIA-649-1 R/T/NR matrix, Appendix C templates), plus digital-era CM (digital twin, viewpoints, MOSA). NOTE: 61B is advisory guidance that adopts and points to the SAE EIA-649 / EIA-649-1 / GEIA-HB-649 suite for the authoritative CM requirements — this pack names and describes that suite but does not reproduce its copyrighted requirement text. Thin on: the EIA-649 requirement clauses themselves, form-level detail (DD-form field instructions, full DID content), and non-DoD/commercial CM frameworks.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from IS-GPS-200 Rev N (NAVSTAR GPS Space Segment / Navigation User Segment Interfaces). Use as a worked ICD/IS exemplar: what an interface specification is, DIST-A and IRN/CCB change control, interface definition vs identification, composite-signal criteria patterns, NAV data as payload families, and time/definition hygiene. Covers Rev N synthesized notes only; does not transcribe Apps II–IV bit fields or PRN/Gold-code tables, and does not replace faa-std-025 preparation rules.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from the Expanded Guidance for NASA Systems Engineering (NASA/SP-2016-6105-SUPPL, Volume 1, March 2016) — the practitioner-depth supplement to the NASA SE Handbook. Use for the load-bearing mechanics the handbook compresses: the SE Engine's per-phase cadence and the iterative-vs-recursive distinction, the AS9100 crosswalk, life-cycle tailoring vs. customization and the Compliance Matrix, the recursive system-design consistency loop (ConOps vs. Operations Concept, requirement flow/type/ownership, successive refinement), product realization (verify/qualify/accept/certify cardinality, protoflight, 'test the way we fly' coverage, two-form transition), and the crosscutting technical-management procedures (six-step scheduling, cost-estimating method selection, JCL, interface document family, RIDM/CRM, CM baselines, EVM arithmetic, MOE/MOP/KPP/TPM, the three required leading indicators, and the decision-analysis method catalog). This is the DEPTH layer — it deliberately does NOT restate the base definitions; pair it with the nasa-se-handbook pack. Scope: NASA space-flight SE practice (Vol 1 Practices); thin on the Vol 2 process-appendix detail, on non-NASA/commercial life cycles, and on software-engineering methodology.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from the GAO Schedule Assessment Guide (GAO-16-89G, 2015). Use for building, assessing, or auditing a program's integrated master schedule (IMS): the ten best practices of a reliable schedule (capture, sequence, resource, duration, traceability, valid critical path, reasonable total float, schedule risk analysis, updating, baseline), the four characteristics (comprehensive, well-constructed, credible, controlled), critical path method arithmetic (forward/backward pass, total float), schedule risk analysis (Monte Carlo, contingency), statusing and baseline control, and the Appendix II audit triad. Scheduling/time-management oriented: it is the authority on schedule reliability, but it is NOT a cost-estimating guide, a full SE process model, an agile guide, or a risk-management framework — see sibling packs (gao-cost, dau-se-guidebook, nasa-schedule, nasa-risk) for those.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from the FAA Requirements Engineering Management Handbook (DOT/FAA/AR-08/32). Use for writing requirements for real-time, embedded control systems — the avionics/medical slant — via the Handbook's eleven recommended practices: system overview and boundary (monitored/controlled variables), operational concepts (use cases), environmental assumptions, change-tolerant functional architecture (dependency diagrams), safety-driven architecture revision (FHA/PSSA/fault tree), system modes, detailed behavior and performance requirements (ideal value + tolerance + latency), the four-variable model bridge to software requirements (MON/CON/NAT/REQ, IN'/REQ'/OUT', DO-178B mapping), subsystem allocation, and rationale. Carries the Isolette Thermostat and Flight Control System worked examples. Slanted toward control systems with sensors and actuators; thin on information-system / enterprise / agile requirements, on requirements-management tooling, and on the formal-methods internals of SCR/RSML/SpecTRM (it names them, does not re-teach them). Does not reproduce the IEEE/DO-178B/ARP standards it cites.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from DAFMAN 63-119 (15 April 2021), Mission-Oriented Test Readiness Certification. Use for continuous MOTRC replacing single-point OTRR thinking: framework/applicability, Certification Official vs PM roles, review cycle and exit criteria, certification memo/decertify gates, DT&E/contractor evidence, ITT integration and cyber resiliency, and the 31-template matrix. DAF T&E readiness process only—does not replace DoDI 5000.89, AFI 99-103, or multi-service lead policies.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from the DoD Systems Engineering Guidebook (OUSD R&E, February 2022). Use for the DoD SE process model — the 16 SE processes (8 technical management + 8 technical) mapped to ISO/IEC/IEEE 15288, the event-driven technical reviews and audits across the Major Capability Acquisition life cycle (ASR, SRR, SFR, PDR, CDR, SVR/FCA, PRR, PCA), the Systems Engineering Plan (SEP), risk/issue/opportunity management, TPMs and leading indicators, system-of-systems and digital engineering, and the 24 design considerations (RAM, system safety, HSI, system security engineering, MOSA, supportability, etc.). Acquisition-program oriented: thin on detailed cost estimating, contracting law, and non-DoD or commercial life cycles.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from FAA-STD-025f (Preparation of Interface Documentation). Use for IRD/ICD family definitions, common format and content, IRD shall-requirements, ICD design characteristics, verification/VRTM, and CM/revision/approval of FAA Enterprise Subsystem interfaces. Covers rev F preparation rules only; does not replace FAA-STD-005 drawing/spec prep, Order 1800.66 full CM procedures, or non-FAA interface standards.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from the OUSD(R&E) guidebook Implementing a MOSA in DoD Programs (Feb 2025). Use for the Modular Open Systems Approach as a DoD acquisition + design discipline: the statutory/regulatory basis (10 U.S.C. 4401–4403, FY2017/FY2021 NDAA, DFARS), the five OUSD(R&E) pillars, the plan→modularize→identify→define→standardize interface lifecycle, technical levers (WBS/MIL-STD-881F taxonomy, standards profiling, API-first software, COTS/cybersecurity), MOSA assessment metrics and tools (PART/OAAT/KOSS/SEAM/MAUT), technology-change and DMSMS management, roadmaps, MOSA across the six AAF pathways, and contracting/IP/data-rights mechanics. SCOPE LIMITS: this is U.S. DoD weapon-system acquisition policy, not a general open-architecture or interface-standards reference — it names standards (FACE, OMS, DISR) without reproducing them, is light on detailed engineering of any specific standard, and does not cover the underlying SE processes (use dau-se-guidebook / nasa-npr-7123) or general systems-engineering theory (use sebok).
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Knowledge base from FAA-HDBK-006D (2020), the FAA's System Reliability, Maintainability, and Availability (RMA) Handbook for National Airspace System (NAS) hardware and software. Use for RMA figures of merit (MTBF, MTBO, MTTR, the availability variants), the bathtub curve and probability distributions, the four-stage RMA lifecycle mapped to the FAA Acquisition Management System (AMS), the six-task RMA technical-management/acquisition process, service-thread criticality and the NAS-RD severity-to-target table, the RMA analysis toolbox (RBD, FMEA/FMECA, FTA, Ishikawa, Monte Carlo, Bayesian, FRACAS, ALT, reliability-growth/recovery tests), software reliability (early prediction + reliability growth), and tailorable example RMA requirements for a Program Requirements Document. Scope limits: it is FAA/NAS-specific guidance (not a requirement, by its own statement), centred on hardware-plus-software availability — it brackets out human/service/facility/communications availability, names but does not reproduce the math derivations or external standards (MIL-STDs, IEEE 1633, RTCA DO-178C/DO-278A, SAE JA1011), is thin on detailed worked numerical examples and on safety-case method, and predates any current revision beyond 006D.
日本語の概要は準備中です。原文の説明を表示しています。
jgsystemsconsulting/jgs-se-knowledge-packs☆ 82026年10月15日 更新
Cut AI tells from any writing. Must always apply.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply to any non-trivial work, not just bulk work: edits, migrations, analyses, checks. Build the tool that does it or proves it (codemod, script, generator, or a skill your subagents follow) instead of working by hand. The tool is the artifact a reviewer can rerun.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when context is filling up: large outputs, long files, repeated reads, fan-out planning. Route bulk to subagents; keep summaries in the main thread, not raw payloads.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when designing types, reviewing a function signature, or writing code in any statically-typed language. Make illegal states unrepresentable, brand semantic primitives, parse external data at boundaries, refuse to lie to the compiler, exhaust variants, derive from authoritative schemas.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply poteto's rigorous engineering workflow to non-trivial coding, investigation, review, migration, and verification tasks.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when debugging. Trace each symptom to its root cause and fix it there; reproduce first, ask why until you reach it, resist nil-check guards that silence crashes.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when facing a novel UI interaction or architectural decision with no precedent in the codebase. Build 2-3 competing prototypes and compare side by side before committing.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when sequencing an addition, refactor, or rewrite. Remove dead weight, redundant validators, and stub references first, then build on the simpler base.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when designing commands, lifecycle steps, or processing loops that run amid crashes, restarts, and retries. Converge to the same end state regardless of partial prior runs.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply to multi-step work (sweeps, migrations, runs of similar edits) and to how you stack commits and PRs. Break work into small units that each end in a verifiable state, check each before the next, and order delivery so the sequence proves itself to a reviewer.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Design an auditable playbook when no narrower one fits: a large migration, an ambitious multi-part change, or work a human reviews after stepping away. Scales rigor to the task, runs a hypothesis loop, and logs decisions via show-me-your-work. Use for /figure-it-out, 'figure it out', a large migration, or when no narrower playbook applies.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when concurrent actors might write to the same file, branch, key, or state object. Eliminate the sharing first; serialize structurally only when one shared writer is a real invariant.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新
Apply when introducing a new internal API while old callers still exist. Migrate callers and delete the old API in the same wave instead of preserving compatibility layers.
日本語の概要は準備中です。原文の説明を表示しています。
painhardcore/pstack☆ 82026年10月16日 更新